logo
City Unveils Rs147 Cr Plan For Footpaths, Pedestrian Crossings Under Mobility Plan

City Unveils Rs147 Cr Plan For Footpaths, Pedestrian Crossings Under Mobility Plan

Time of India26-05-2025

1
2
Nagpur: In a step toward safer streets and smoother traffic flow, the city is planning to roll out a Rs147.2 crore plan to expand and upgrade pedestrian infrastructure. Under Phase 1 of the initiative, 156 kilometres of new footpaths are proposed to be constructed, 32 at-grade pedestrian crossings will be introduced at key junctions, and 17 grade-separated pedestrian facilities will be developed to improve accessibility and safety.
Of the total investment, Rs131 crore is earmarked for building footpaths with a minimum width of 1.8m and a standard height of 150mm. These footpaths will be continuous and encroachment-free, with tabletop crossings planned where footpaths intersect roads. Strict enforcement measures are expected to keep the pathways clear and accessible. The remaining funds will go towards at-grade crossings (Rs12.8 crore) and grade-separated facilities (Rs3.4 crore), including foot overbridges with lifts and escalators, and hybrid subways designed with proper drainage systems.
Currently, the city has only 347km of footpaths — well short of the 664km recommended as per the CMP 2018. A survey of the 650km road network shows that only 54% of roads include footpaths, underscoring the urgent need for improved pedestrian infrastructure.
This plan is not a standalone initiative but part of the city's broader Comprehensive Mobility Plan (CMP), prepared by MahaMetro in collaboration with RITES. The CMP outlines long-term strategies for managing the city's mobility challenges, covering roads, flyovers, public transport, and pedestrian infrastructure.
The 32 at-grade crossings have been identified at busy intersections to facilitate safer pedestrian movement at street level. These are expected to improve traffic efficiency and reduce unsafe road-crossing behaviour. Meanwhile, the 17 grade-separated crossings will serve high-footfall areas and major road junctions, offering safer and more convenient options for pedestrians without disrupting vehicular flow.
Together, these developments aim to create a safer, more walkable city that supports public transport and reduces pressure on the road network. Once implemented, the plan is expected to not only protect pedestrians but also promote more efficient, inclusive urban mobility.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

RITES emerges as L-1 bidder for tender floated by Gujarat Urban Development Company
RITES emerges as L-1 bidder for tender floated by Gujarat Urban Development Company

Business Standard

time15 hours ago

  • Business Standard

RITES emerges as L-1 bidder for tender floated by Gujarat Urban Development Company

RITES said that it has emerged as the lowest bidder (L-1) in a quality-cum-cost based selection (QCBS) tender floated by Gujarat Urban Development Company (GUDCL) for a project worth Rs 28.50 crore. The tender is for the appointment of a Third-Party Inspection (TPI) agency for Water Supply, Underground Drainage, and Sewage Treatment Plant (WSS/UGD/STP) projects under the Amrut 2.0/SJMMSVY schemes, managed by GUDC for Urban Local Bodies (ULBs) of Gujarat. This project is slated for completion within 60 months from the date of the letter of award (LoA) or Notice to Proceed (NTP). The order is subject to award after the due process of scrutiny and overall evaluation (technical and financial) by the Gujarat Urban Development Company Limited as per the requisite requirements mentioned in the tender documents, RITES said in a statement. RITES, a Miniratna (Category-I) Schedule 'A' public sector enterprise, is a leading player in the transport consultancy and engineering sector in India, having diversified services and geographical reach. As of 31 March 2025, the Government of India held 72.20% stake in the company. The companys consolidated net profit jumped 29.19% to Rs 141.33 crore in Q4 FY25 as against Rs 109.39 crore posted in Q3 FY25. Revenue from operations rose 6.89% to Rs 615.43 crore in the quarter ended 31 March 2025 from Rs 575.76 crore posted in Q3 FY25. The scrip rose 0.91% to currently trade at Rs 281.70 on the BSE.

RITES emerges L1 bidder for a Gujarat Urban Development Company project
RITES emerges L1 bidder for a Gujarat Urban Development Company project

Business Standard

time19 hours ago

  • Business Standard

RITES emerges L1 bidder for a Gujarat Urban Development Company project

RITES is the lowest bidder (L-1) in the financial bid of the QCBS tender floated by Gujarat Urban Development Company for Appointment of TPI agency for WSS/UGD/STP projects under Amrut 2.0/SJMMSVY under GUDC for ULBs of Gujarat. The order is subject to award after the due process of scrutiny and overall evaluation (technical and financial) by the Gujarat Urban Development Company as per the requisite requirements mentioned in the tender documents. The estimated value of the bid is Rs. 28.50 crore excluding GST.

A Decade On, Brakes On Bike-Sharing Despite Foot On The Pedal
A Decade On, Brakes On Bike-Sharing Despite Foot On The Pedal

Time of India

timea day ago

  • Time of India

A Decade On, Brakes On Bike-Sharing Despite Foot On The Pedal

Nagpur: For over a decade, Nagpur has pursued the vision of becoming a cycling-friendly city, drawing inspiration from global models like Paris and Amsterdam. Public Bike Sharing (PBS) has been a consistent part of the city's Comprehensive Mobility Plans (CMPs). Despite the repeated push — and Rs47.5 crore proposed over three CMPs — the city still awaits a fully functional system. The concept was first introduced in the 2013 CMP, with Rs11.5 crore allocated for 79 docking stations across the Nagpur Metropolitan Region (NMR), including 70 sub-stations and 9 major docking hubs, which was prepared by NIT back then. In 2018, MahaMetro prepared the CMP and carried the idea forward, proposing 84 stations — again 9 main and 75 sub-stations — strategically placed near Metro stations and key bus terminals, with an estimated cost of Rs12 crore. Now, CMP 2025 revisits the plan on a larger scale, with a Rs24 crore budget and 120 proposed locations citywide. Despite these plans, the city saw little on-ground change. Independent efforts, including the bike-sharing partnership between MahaMetro and private operator VIPL, also failed to make an impact. This pattern of repeated proposals and limited implementation raises questions about feasibility, execution, and long-term planning. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với sàn môi giới tin cậy IC Markets Tìm hiểu thêm Undo However, officials maintain that lessons were learned and that CMP 2025 will mark a turning point. A senior official told TOI, "Whenever we look at successful PBS models globally, one key element stands out — dedicated Non-Motorised Transport (NMT) infrastructure. This includes separate cycling lanes, wide footpaths, and safe, encroachment-free pedestrian zones. These are the foundations we're prioritising in the new plan. " He also outlined the adoption of the 'Hub & Spoke' model in the latest blueprint. "In this model, we ensure major docking stations are supported by sub-stations within a 2–3 km radius. For example, someone exiting a Metro station can pick up a cycle there and drop it near their home, where a sub-docking station will be available. From there, a clean, walkable footpath will lead them home. The goal is to make the system seamless and city-wide, not clustered in pockets," he explained. While the intent remains strong and the vision ambitious, the on-ground reality has not kept pace. For Nagpur's PBS scheme to succeed, it will need more than allocated budgets — it will require consistent execution, public awareness, behavioural shifts, and infrastructure that supports non-motorised mobility. With CMP 2025 laying renewed focus on integrated planning and last-mile connectivity, stakeholders remain hopeful. The question now is whether Nagpur can finally move from planning to pedalling.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store