
Three port vessels to house floating restos
Syama Prasad Mookerjee Port
, formerly known as KoPT, will repurpose three of its vessels — PL Rupsa, PL Hooghly, and PL Gopal — to operate them as floating heritage restaurants. The initiative aims to foster river-based tourism alongside cultural and hospitality services.A senior KoPT official said: "The vessels will be repurposed as heritage and commercial platforms.
We invite established restaurant owners, cafe chains, and food franchise operators to set up floating restaurants or themed hospitality spaces on the Hooghly to create a culturally enriched and visually striking identity for their brand." SMP, Kolkata has called for expressions of interest (EOIs) for the project. The vessels, previously used as residential quarters for pilots during events like Gangasagar Mela, had outlived their original utility. PL Rupsa and PL Gopal, measuring 32m and 19m in length, 6m and 5m in width, and 3.8m and 2.2m in depth, can accommodate approximately 50-100 people. Both vessels have about 1,000 sqft of floor area."They will remain in the river moored next to shore or jetty and will be self-propelled with their own power, featuring crafts exhibition space, restaurant, a small assembly (for banquet purpose) and so on. Basic structures will not be altered," the official said. In 2022, PS Bhopal, a training vessel, was launched with a similar approach. It now hosts weddings, heritage tours, and corporate events.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
&w=3840&q=100)

Business Standard
4 days ago
- Business Standard
Kolkata Port inaugurates first PPP terminal at Khidderpore Docks for cargo
The Century Ports Ltd Terminal, built at a cost of Rs 190 crore, was formally commissioned by the Syama Prasad Mookerjee Port, Kolkata (SMPK) Press Trust of India Kolkata The Kolkata Port on Saturday inaugurated its first public-private partnership (PPP) terminal at Khidderpore Docks, marking a shift in the transformation of the historic dock system. The Century Ports Ltd Terminal, built at a cost of Rs 190 crore, was formally commissioned by the Syama Prasad Mookerjee Port, Kolkata (SMPK). Equipped with a mobile harbour crane, a barge unloader, modern yard equipment and an advanced terminal operating system (TOS), the facility has an initial handling capacity of 1.65 lakh TEUs (twenty-foot equivalent units) of containers and 3.3 lakh tonnes of other cargo. The inauguration of our first PPP terminal at Khidderpore Docks paves the way for increased cargo handling and encourages the modernisation of other berths at the dock. It is the result of relentless effort, collaboration and vision, Chairman Rathendra Raman said. The concession agreement for the project, signed in 2022 for a 30-year period, is expected to boost cargo movement with integrated connectivity to road, rail and inland waterways. SMPK said it has a pipeline of over Rs 4,000-crore PPP projects scheduled to become operational at Kolkata and Haldia docks within the next year. (Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)


Time of India
5 days ago
- Time of India
Kolkata port signs ₹343.58 crore deal for Haldia berth mechanisation
Advt The Syama Prasad Mookerjee Port , Kolkata (SMPK) on Thursday awarded a ₹343.58 crore public-private partnership (PPP) project to Ganges Bulk Terminal Pvt. Ltd. (GBTPL) for the mechanisation of berth No. 5 at Haldia Dock Complex , aiming to improve cargo handling efficiency , officials project, to be implemented on a Design, Build, Finance, Operate and Transfer (DBFOT) basis, will equip the berth to handle 5 million metric tonnes of dry bulk cargo annually, they is targeted for completion by December 2027, SMPK said in a will invest ₹343.58 crore, while the government will provide ₹22.30 crore through internal and extra budgetary resources, the riverine port chairman Rathendra Raman said it will improve operational capabilities, and strengthen eastern India's role in maritime to port authorities, the mechanisation will reduce vessel turnaround time, increase throughput, and deliver long-term economic benefits for the region's port sector.


The Print
6 days ago
- The Print
Kolkata port signs Rs 343.58 cr deal for Haldia berth mechanisation
Kolkata, Aug 14 (PTI) The Syama Prasad Mookerjee Port, Kolkata (SMPK) on Thursday awarded a Rs 343.58 crore public-private partnership (PPP) project to Ganges Bulk Terminal Pvt. Ltd. (GBTPL) for the mechanisation of berth No. 5 at Haldia Dock Complex, aiming to improve cargo handling efficiency, officials said. The project, to be implemented on a Design, Build, Finance, Operate and Transfer (DBFOT) basis, will equip the berth to handle 5 million metric tonnes of dry bulk cargo annually, they added.