
Waltair DRM felicitates railway officials for successful completion of NI works
Appreciating the relentless efforts of the team, Mr. Lalit Bohra highlighted their role in the successful commissioning of the Automatic Signalling System on the main line of Waltair Division and in sections of the Marshalling Yard. He also lauded their contributions to the commissioning of new lines as part of the doubling projects on the Kottavalasa–Kirandul line, Koraput–Rayagada line, and at Goods Sheds.
ADRM (Operations) Manoj Kumar Sahoo, Senior Divisional Operations Manager Tanmay Mukhopadhyaya and other senior officials were present.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
6 days ago
- Time of India
Vizag station to grow from 8 to 14 platforms under Rs 466 crore upgrade
1 2 Visakhapatnam: The Visakhapatnam railway station will have six more platforms, including island platforms, added to the existing eight platforms. This is part of a major redevelopment project aimed at transforming the station into a world-class transportation hub to ease congestion. Visakhapatnam, one of the three biggest railway stations in the state, will cater to the increasing needs, amenities, and demands of passengers. It will also create a commercial and cultural centre with this 466 crore redevelopment work, which will be completed by 2027. The station will have 14 platforms to handle the growing number of trains and passengers. Initially, authorities planned for two platforms, later increasing the number to four, and now it has reached six as Visakhapatnam has become the headquarters for the newly formed South Coast Railway. Apart from this, there will be yard remodelling works to prevent any hiccups in trains entering and leaving the station. As per the plan, there will be two more lines added to the existing two tracks from Gopalapatnam to Visakhapatnam station, which will reduce congestion and improve operational efficiency. After winning a court case, the redevelopment project gained momentum as the detailed project report was sent to the Railway Board and is awaiting approval. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Lara Green Is Retiring - Her Final Jewelry Pieces Are 80% Off Artisan Weekly Read More Undo Meanwhile, authorities have begun levelling works on the Gnanapuram side, where the railways have a large chunk of land. The first phase of the project will focus more on the construction of new platforms. Visakhapatnam station, one of the top 20 stations handling the highest number of passengers in the country, usually accommodates around 50,000 to 60,000 passengers on general days and above 75,000 during festival days. The redevelopment will provide new escalators and an air concourse of 72 metres, which will have a large open space elevated above the tracks. This will serve as a waiting area with seating arrangements for passengers and a point of connection between different parts of the station, including platforms. The DRM of the Waltair Railway, Lalit Bohra, said that a new contractor has taken up the works and it will be completed as per the scheduled time. The Waltair division is constructing fencing on both sides of the tracks from Vizag to Duvvada and Palasa to avoid cattle and sheep on the tracks, allowing trains to run at 160 km/h from the existing 130 km/h. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area. Get the latest lifestyle updates on Times of India, along with Raksha Bandhan wishes , messages and quotes !


New Indian Express
30-07-2025
- New Indian Express
Vigilance raids unearth crores in assets linked to Bhubaneswar R&B engineer Raja Kishore Jena
BHUBANESWAR: The Vigilance on Tuesday carried out raids at multiple locations linked to assistant engineer (AE) of Roads and Buildings (R&B) Division, Bhubaneswar, Raja Kishore Jena and unearthed property and assets worth crores. Vigilance officials carried out searches at 10 different properties linked to Jena in connection with a disproportionate assets case, and found a three-storey building spread over 3,500 sq ft area at sector-5 in Niladri Vihar, two flats - one measuring 1,800 sq ft and another measuring 650 sq ft - in Cosmopolis, a shopping unit of 400 sq ft area in Utkal Kanika Galleria Mall, another shopping unit at Symphony Mall and 13 high-value plots including nine in Bhubaneswar, three in Nayagarh and one at Khurda in the name of him and his family members. Jena's plots in Bhubaneswar include two 1.04 acre land patches at Bhagabanpur mouza and another 1.01 acre at Abaranga near Khurda. The bank, postal and insurance deposits of Jena and his family members were also found to be around Rs 75 lakh, while the value of cash and household articles seized exceeded Rs 30 lakh. Jena had even spent about Rs 67 lakh towards education of his two children in two reputed private institutions including a medical college in the capital city, Vigilance officials said.


Time of India
13-07-2025
- Time of India
Sleeping Pods At Vizag Railway Station: Revolutionary Sleeping Pods Launch at Vizag Railway Station, ET TravelWorld
Advt Advt Join the community of 2M+ industry professionals. Subscribe to Newsletter to get latest insights & analysis in your inbox. All about ETTravelWorld industry right on your smartphone! Download the ETTravelWorld App and get the Realtime updates and Save your favourite articles. In a first-of-its-kind initiative under the East Coast Railway (ECoR) Zone, Waltair Division has launched sleeping pods at Visakhapatnam railway station premises. The capsule hotel , developed under the Non-Fare Revenue model, offers affordable and modern accommodation for passengers visiting Vizag for medical, tourism, education, or industry-related Railway Manager Lalit Bohra at the launch of this facility on Thursday said that accommodation demand remains high at the station, often exceeding availability, prompting this pilot initiative to improve passenger comfort and convenience."This facility, inspired by metropolitan models, ensures budget-friendly, hygienic, and secure stay options for travellers," said an official from Waltair Division on facility has been established on Platform No. 1, Gate No. 3 of the railway station and Passengers can access the sleeping pod facility without needing a train ticket or even a platform ticket. It is open for use by the general public. The sleeping pod complex comprises 88 ergonomically designed beds - 73 single, 15 double, and 18 exclusively for women in a dedicated section with separate travellers have a private hall with a dressing room and modern bathrooms, designed for safety, privacy, and enhanced comfort inside the station premises. Key amenities include round-the-clock hot water, free Wi-Fi, modern toilets, spacious bathrooms, an in-house snacks bar, and a dedicated travel desk to assist tourists and are set at INR 200 for single pod up to three hours and INR 400 for 24 hours while double beds cost INR 300 and INR 600 respectively. Sirish, a pilgrim from Tirupati told PTI that he opted for the pods after visiting Simhachalam Temple, calling it a clean and affordable alternative to unavailable hotel a frequent traveller to Vizag from Kolkata, described the beds as "home-like," praising the luggage space and comfort, noting how helpful it is for passengers arriving after long-distance journeys. Suresh, travelling from Hyderabad, told PTI that he was surprised at the facility's availability, adding that similar pods should be introduced nationwide to generate revenue to the railway and provide safety and booking may be introduced later, depending on passenger demand. The capsule hotel will adhere to standard railway rules and remain under CCTV surveillance and security monitoring, said the official.