logo
#

Latest news with #CentralInterventionsUnit

Progress inspected on al-Hasi Water Barrier Project in Mahweet
Progress inspected on al-Hasi Water Barrier Project in Mahweet

Saba Yemen

time28-04-2025

  • General
  • Saba Yemen

Progress inspected on al-Hasi Water Barrier Project in Mahweet

Mahweet - Saba: Engineer Mukhtar al-Turki, representing the Central Emergency Development Interventions Unit in Mahweet province on Monday inspected the ongoing construction of al-Hasi Water Barrier Project in al-Khabt district. The project, with a storage capacity of 22,948 cubic meters and a cost of 156.85 million Y.R, is expected to benefit over 1,800 people. During the inspection, Engineer al-Turki highlighted the Central Interventions Unit's support for such projects as crucial for expanding rural water infrastructure and raising community awareness of its importance for improved living conditions and sustainable development. He stated the visit aligns with directives to review project progress and promote grain cultivation for self-sufficiency, in accordance with the directives of the "Leader of the Revolution" and the Supreme Political Council. Ali Qatina, director of al-Khabt district emphasized that these strategic barrier projects are a long-awaited dream for residents, expected to capture significant seasonal rainwater for agricultural irrigation and recharging groundwater and drinking water wells. He added that the water barriers will help alleviate the water crisis and provide sustainable water sources for villagers and farmers by effectively collecting and utilizing rainwater. Whatsapp Telegram Email Print

Opening of Al Rabat Water Project in Dhi Na'im District of Al Bayda Governorate
Opening of Al Rabat Water Project in Dhi Na'im District of Al Bayda Governorate

Saba Yemen

time27-04-2025

  • Politics
  • Saba Yemen

Opening of Al Rabat Water Project in Dhi Na'im District of Al Bayda Governorate

Bayda - Saba: On Sunday, April 27, 2025, Al Bayda Governor Abdullah Idris inaugurated the Al Rabat Water Project in Dhi Na'im District. The project was implemented by the Central Interventions Unit of the Ministry of Local Administration and the branch of the Rural Water Projects Authority in the governorate. The project cost 61 million riyals and included the installation of a solar-powered pump, the extension of pipes of various sizes, and the construction of a concrete tank. The project will provide drinking water to more than 5,640 citizens in the area and will contribute to alleviating the suffering of the residents. During the inauguration, the governor emphasized the importance of developing rural water projects and using solar energy instead of diesel to reduce costs. He also praised the role of the Central Interventions Unit in supporting deprived areas and providing basic water services to residents. Whatsapp Telegram Email Print more of (Local)

Ribat water project in Dhi Na'im district introduced to beneficiaries
Ribat water project in Dhi Na'im district introduced to beneficiaries

Saba Yemen

time22-04-2025

  • General
  • Saba Yemen

Ribat water project in Dhi Na'im district introduced to beneficiaries

Baydha - Saba: The Central Emergency Development Interventions Unit of the Ministry of Local and Rural Administration and Development and the General Authority for Rural Water Projects branch in Baydha Governorate handed over the Rabat Water Project in Dhi Na'im District to the beneficiaries. The project included the supply and installation of a solar-powered pumping unit and pipes of various diameters, and the construction of a concrete tank at a cost of 61 million riyals, funded by the Central Interventions Unit. During the handover, attended by the Director of the District, Murad Al-Riyami, the Director of the Rural Water Projects Authority branch in Baydha, Engineer Hassan Al-Kahali, emphasized the Interventions Unit's commitment to supporting water projects in the governorate. It has funded many projects in the most deprived areas, including this project, with the aim of providing drinking water to residents of the area, which suffers from a shortage of drinking water supplies. For their part, Mohammed Nashwan, the representative of the Central Interventions Unit in Dhamar and Baydha Governorates, and Engineer Najmuddin Faisal, the Director of the Water and Energy Department at the unit, emphasized that the unit's leadership prioritizes projects that serve deprived areas. They explained that the project will provide drinking water to more than 5,640 people in the beneficiary area at a low cost, as the solar-powered pumping unit will be an alternative to diesel, thus reducing the burden on citizens. The handover ceremony was attended by the Director of Evaluation at the Rural Water Authority, Engineer Mohammed Muqbil, the Deputy Director of the Supervision Department at the Authority, Engineer Nabil Al-Mikhlafi, and representatives of the beneficiaries. Whatsapp Telegram Email Print

Sa'ada: al-Qahr area road inaugurated in Baqim district
Sa'ada: al-Qahr area road inaugurated in Baqim district

Saba Yemen

time25-02-2025

  • General
  • Saba Yemen

Sa'ada: al-Qahr area road inaugurated in Baqim district

Sa'ada - Saba: Sa'ada governor Mohammed Jaber on Tuesday inaugurated al-Qahr area Road in Baqim district in Sa'ada province at a cost of 200 million Yemeni Y.R. The road benefits five districts, connecting al-Qahr area to the asphalt line in the district center, passing through Bani al-Harith, Maali, Sharawa, and Yasnam areas, significantly reducing the distance from 100 kilometers to approximately 10 kilometers. Governor Jaber and Baqim district director Mohammed Qafla, received a briefing on the project. The community contributed 70 million Y.R, while the local authority, the Central Interventions Unit, the Road Maintenance Fund, and the Executive Unit for Road Construction and Maintenance completed the project. The governor praised the efforts made to complete the project, which connects al-Qahr area to the center of Baqim district, emphasizing the importance of implementing projects that alleviate citizens' suffering. Whatsapp Telegram Email Print

Inspection Atharib Barrier & Nakhla Dam projects in Haidan & Saqin, Sa'ada
Inspection Atharib Barrier & Nakhla Dam projects in Haidan & Saqin, Sa'ada

Saba Yemen

time13-02-2025

  • Business
  • Saba Yemen

Inspection Atharib Barrier & Nakhla Dam projects in Haidan & Saqin, Sa'ada

Sa'ada - Saba: The Executive Director of the Central Emergency Development Interventions Unit at the Ministry of Administration, Local and Rural Development, Engineer Shihab Ahmed Al-Shami, inspected on Thursday the projects of Atharib Barrier and Nakhla Dam in the districts of Haidan and Saqin in Sa'ada Province. Al-Shami was briefed on the work carried out on Atharib barrier project in Juma Al-Fadhil , in Haidan district, which cost more than 204 million , 338 thousand riyals and has a storage capacity of 83 thousand and 925 cubic meters funded by the Central Interventions Unit and a community contribution of 10 thousand stones, benefiting five thousand people, with a completion rate of 100 percent. He also inspected the progress of work on the Nakhla Dam project in Saqin district, which cost 709 million and 551 thousand riyals, with a storage capacity of 585 thousand cubic meters with a height of 21 meters, benefiting 20 thousand people, with a community contribution of 60 percent. The Director of the Central Emergency Development Interventions Unit praised the role of social figures in motivating citizens to contribute to projects with an economic return, which will have an impact on increasing agricultural areas and local production, especially since Sa'ada province is characterized by its fertile soil and climate suitable for the cultivation of various types of grains, fruits and vegetables. He praised the completion of the project and the quality of engineering work according to the standards adopted for the project to ensure sustainability in the field of water resources in the province. The representative of the Central Intervention Unit in Sa'ada province, Abdulrab Al-Ansi, confirmed that the team implemented the two projects with dedication and high efficiency. Whatsapp Telegram Email Print more of (Local)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store