logo
#

Latest news with #DaveSmales

Traffic measures in place for gas pipe upgrades
Traffic measures in place for gas pipe upgrades

Yahoo

time05-08-2025

  • Automotive
  • Yahoo

Traffic measures in place for gas pipe upgrades

Traffic measures are in place while "essential" work to replace gas pipes in an East Yorkshire town takes place. Northern Gas Networks (NGN) said it was replacing the "ageing metal pipework" on The Mile from the junction of Mile End Park to Algarth Road in Pocklington with "more durable plastic pipes". Temporary traffic lights will last for about four weeks. NGN said the work would "ensure the continued safe and reliable supply of gas" for customers living in the area. Once the work is complete, the temporary lights will move to Yapham Road between the junctions of Garths End and Sherbuttgate Road North. This final stage is also expected to take about four weeks. NGN is working with East Riding of Yorkshire Council on the project. Dave Smales, site manager at NGN, said the works were "vital" in order to "continue to maintain a safe and reliable gas supply to the residents of Pocklington". NGN will return to Mile End for further work at the end of September with more details to be announced nearer the time, he added. Listen to highlights from Hull and East Yorkshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here. Download the BBC News app from the App Store for iPhone and iPad or Google Play for Android devices Related internet links Northern Gas Networks

Pocklington traffic measures in place for gas pipe upgrades
Pocklington traffic measures in place for gas pipe upgrades

BBC News

time05-08-2025

  • Automotive
  • BBC News

Pocklington traffic measures in place for gas pipe upgrades

Traffic measures are in place while "essential" work to replace gas pipes in an East Yorkshire town takes Gas Networks (NGN) said it was replacing the "ageing metal pipework" on The Mile from the junction of Mile End Park to Algarth Road in Pocklington with "more durable plastic pipes".Temporary traffic lights will last for about four said the work would "ensure the continued safe and reliable supply of gas" for customers living in the area. Once the work is complete, the temporary lights will move to Yapham Road between the junctions of Garths End and Sherbuttgate Road final stage is also expected to take about four is working with East Riding of Yorkshire Council on the Smales, site manager at NGN, said the works were "vital" in order to "continue to maintain a safe and reliable gas supply to the residents of Pocklington".NGN will return to Mile End for further work at the end of September with more details to be announced nearer the time, he added. Listen to highlights from Hull and East Yorkshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here. Download the BBC News app from the App Store for iPhone and iPad or Google Play for Android devices

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store