logo
#

Latest news with #Lidgett

Concerns grow over eThekwini's wastewater treatment facilities amid water crisis
Concerns grow over eThekwini's wastewater treatment facilities amid water crisis

IOL News

time18-07-2025

  • General
  • IOL News

Concerns grow over eThekwini's wastewater treatment facilities amid water crisis

Residents collecting bottles to store water during water cuts. Image: Leon Lestrade AMID ongoing water issues in KwaZulu-Natal, the Democratic Alliance has raised concerns over the operational status of eThekwini's wastewater treatment works, revealing alarming statistics and community frustrations regarding environmental degradation and public health risks. In a parliamentary question, Hannah Lidgett, the DA spokesperson on environmental affairs for KZN questioned the state of infrastructure at the Waste Water Treatment Works (WWTWs). In its reply, the Department of Economic Development, Tourism and Environmental Affairs (EDTEA) confirmed that only three of eThekwini's six WWTWs - in Kwandengezi, Glenwood, Umdloti, Northern, Umbilo, and Umhlanga - were operating at full capacity and repairs were needed. Lidgett also questioned how many environmental rehabilitation projects had been initiated since 2022 to address the contamination of rivers, wetlands and coastal areas. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad loading Dr Bonginkosi Dlamini, chief director of environmental management for EDTEA responded that the repairs were undertaken by eThekwini Municipality in response to the S28 of NEMA Directive (remediation of environmental damage) which was issued by this department to the city to address the contamination following the 2022 flooding. Lidgett also asked what percentage of the repair projects were fully operational. Dlamini responded that all the pump stations (100%) were operational post repairs but not fully functional. 'However, these facilities do experience overflows which is in most cases due to high rainfall and occasionally when there is blockage in the system due to foreign objects. 'All the repaired sewer networks (100%) are operational. All WWTWs are functional and have improved in terms of compliance on the outflow water quality results. It must be noted, however, that not all facilities are fully functional,' said Dlamini. While Kwandengezi, Glenwood, and Umdloti WWTWs are working at 100%, the remaining facilities including Umbilo, and Umhlanga were compromised at 50 to 70% capacity and were only projected to be fully operational until 2026/2027. In her questions, Lidgett asked what punitive actions had been taken against corporations found guilty of environmental violations. Dlamini responded that the department has opened five cases against the eThekwini Municipality for sewer related pollution in Phoenix, Isipingo, Winklespruit, Verulam and Umlazi. 'There have been ongoing campaigns to educate communities and bi-monthly environmental compliance meetings with the affected line departments within the municipality to provide updated progress reports so that the Department can track progress, understand the challenges and provide strategic guidance,' said Dlamini. Lidgett said they had submitted follow-up parliamentary questions to establish the impact of diminished operationality and lack of capacity. 'The ongoing dysfunction of eThekwini's WWTWs, amid a litany of environmental crimes committed on the municipality's watch, is deeply alarming. 'The state of the facilities reveals a systemic collapse of basic infrastructure with terrible consequences for river systems, coastal waters, and public health across our province. Despite a Section 28 NEMA directive, issued to compel action after the 2022 floods, the municipality has clearly failed to comply meaningfully. 'Of grave concern is that five criminal cases have been opened against the eThekwini Municipality for environmental violations across Phoenix, Isipingo, Winklespruit, Verulam, and Umlazi. That KZN's Department of Economic Development, Tourism, and Environmental Affairs (EDTEA) has now confirmed these cases proves not only gross negligence, but an active breach of the law. 'Regrettably, the department's response is nothing short of complacent. Residents of KZN cannot be expected to accept environmental degradation and collapsing water infrastructure as the new normal,' said Lidgett. Reaction from residents: Renusha Singh from Umhlanga said she was frustrated at the lack of urgency regarding the water crisis. 'I feel like our complaints have fallen on deaf ears. When we have water, the pressure is low. But then there are days that we go without a drop of water with no concern for our wellbeing or human rights. Sadly, we do not have an alternate source of water. So when our taps run dry, we panic. 'The days of just waking up and going to work without the added pressure of the water woes, are gone. I always have to find different ways to get water just so we can leave the house. It's tiring and frustrating. Now it seems like the issue will only be solved by 2027. That is ridiculous. How are we to survive two more years? We need help, the eThekwini Municipality needs to take our plight seriously,' said Singh. Jacky Barrington, the secretary of the Umhlanga Ratepayers and Residents Association said they were frustrated at the timeframe for repairs. 'The eThekwini Municipality committed to have the reticulation and provision of water to greater Durban secured by early 2026. It is of great concern that this time line has been increased, especially for the northern reaches of the municipality. Umhlanga is considered the business and tourism core of the city. "Interruptions and water shedding have already had a massive negative impact on commerce, with poor tourism outcomes for Umhlanga and an inability to sustain the job growth we so desperately need. Pipe bursts, potholes and sinkholes are harming our property values. Meanwhile Rates and Utility bills keep going up,' said Barrington. Roshan Lil-Ruthan, the communications spokesperson for the Verulam Water Crisis Committee (VWCC), condemned the eThekwini's wastewater failures as environmental sabotage and economic vandalism. 'The VWCC expressed urgent condemnation of the complete dysfunction plaguing eThekwini Municipality's WWTWs, which now represent not only a collapse in basic infrastructure but a direct threat to the environment, public health, and KwaZulu-Natal's economic future. 'Recent parliamentary replies confirm that only three of six municipal WWTWs are currently operating at full capacity. The Northern, Umbilo, and Umhlanga facilities are running at 50 to 70% efficiency, with projected completion delays stretching into 2027 - an unthinkable timeline given the damage already inflicted. We demand an immediate shift of this time line to much sooner than 2027. 'This dereliction of duty has triggered systemic pollution across our rivers, coastal waters, and soil. Raw sewage continues to flood natural ecosystems, violating environmental directives and posing extreme risks to biodiversity and residents. Despite a Section 28 NEMA directive issued after the 2022 floods, eThekwini has failed to comply meaningfully. Look at the recent catastrophic result of algae blooms in the Midmar basin that is a direct result of sewage contamination. It affected the preparation of potable water to millions. Now just think about what's happening in our rivers and ocean,' said Lil-Ruthan. He said toxic pollutants, including dangerously high levels of had contaminated local waterways and beaches. 'Communities from Verulam to Umlazi face microbial threats and diminished access to clean water, with vulnerable residents at acute risk. The municipality's failure to act is no longer administrative - it is criminal. Not so long ago we had a truck load of faecal waste dumped in the Mount Moreland conservancy area. The denial from the municipality in the face of eye witnesses and a video proved yet again that this was done deliberately. 'KZN's EDTEA confirmed five criminal cases against the municipality for environmental violations, including one in Verulam. Yet not a single official has been prosecuted, nor has any consequence management been undertaken. This culture of impunity must end. The City Manager or his appointed representatives, by virtue of their role, cannot be absolved of this crisis and must be held directly accountable. Is the SAPS and NPA lacking the will to act according to the law? 'Verulam has many sewage spills, some right in the CBD. This has impacted businesses and especially food establishments and medical practices and other service providers in our community. Raw sewerage flowed like a river until I reported this to the Mayor. A truck was then sent to unblock some of these blockages. The shock of this was when the staff arrived on scene, they pumped the raw sewage into the storm water reticulation system that feeds the Umdloti river. Umdloti has a marine protected area. Just imagine the repercussions,' said Lil-Ruthan. He said they were currently preparing formal submissions to the South African Human Rights Commission. Ish Prahladh, the president of the eThekwini Ratepayers and Residents Association (ERRA) said he had faith that the Mayor Cyril Xaba was making strides to improve service delivery. 'Many areas do not have water issues and also some areas are having water issues. But it's not as bad as previously because there is definitely an improvement. Remember the city is putting clamps on water mafias and incompetent service delivery contractors and now municipal tankers will be improving water deliveries to affected areas. Our ERRA affiliates are keeping an eye on the water situation and also helping out whenever a bad situation arises in their specific areas,' said Prahladh. The eThekwini Municipality did not respond to questions at the time of publication. THE POST

Budget constraints: KZN air quality stations non-operational
Budget constraints: KZN air quality stations non-operational

IOL News

time11-07-2025

  • Health
  • IOL News

Budget constraints: KZN air quality stations non-operational

The Durban landscape. Concerns have been raised about the air quality in KwaZulu-Natal as air quality monitoring stations have not been working for two years. Image: File Photo: Leon Lestrade Independent Newspapers KZN's air quality monitoring stations are non-operational due to budget constraints, raising concerns about the health impacts on communities. YOSHINI PERUMAL explores the implications of the shutdown and the call for urgent action. WITH all six air quality stations in KwaZulu-Natal (KZN) non-operational due to budget constraints, the Department of Economic Development, Tourism and Environmental Affairs (EDTEA) has failed to assess the health risks posed by deteriorating air quality in local communities. The state of the air quality stations were revealed in a parliamentary response to the Democratic Alliance's (DA) Hannah Lidgett, spokesperson on environmental affairs for KZN. The stations are located in Newcastle, Stanger, Ngwelezane, Port Shepstone, Pietermaritzburg, and Estcourt. Dr Bonginkosi Dlamini, chief director of environmental management for EDTEA, said there was a lack of budget to operate the stations in Newcastle and Stanger, while at the Ngwelezane and Estcourt stations there were no budget available to repair the instruments. He said at Port Shepstone, the instruments were beyond repair and the facility had become obsolete. Dlamini added a lack of budget and vandalisation of the Pietermaritzburg station had led to it being shut down. 'Some of the stations will be repaired following the 2025/2026 financial year, while others have been earmarked for the 2026/2027 financial year,' he added. He said due to the stations being shut down, the EDTEA relied on data from the South African Air Quality Information System (SAAQIS) and its accompanying reports. 'The department has not assessed the health risks and impacts of poor air quality on communities. The assessments are part of the activities in the recently approved Air Quality Management Plan for KZN,' Dlamini said. Lidgett said it was alarming that the department had no data on the health impacts of poor air quality on communities. 'This collapse was allowed to happen under the neglectful eyes of the previous administration. What is particularly disturbing is that many communities across KZN are at the brunt of poor air quality and report significant health impacts. It is deeply concerning that former governments did not address the issue,' added Lidgett. She said it was also concerning that turnaround times to fix the stations were staggered. 'Adding to the concern, the department confirmed it had not commissioned any studies or assessments regarding the health impacts of poor air quality on communities. This historical neglect is in direct contradiction to their constitutional duty to ensure a safe and healthy environment for all residents of KZN. Instead, EDTEA stated that health impact assessments form part of future activities under the recently approved Air Quality Management Plan (AQMP). 'It is unacceptable that the provincial government remains unaware of the extent of harm caused by air pollution while simultaneously delaying meaningful intervention for years to come. Without data, there can be no accountability, and without accountability, communities will continue to suffer needlessly,' she said. Lidgett called on EDTEA to fast-track the urgent repair and recommissioning of the three air quality monitoring stations earmarked for remediation in this financial year. 'We also call for the immediate implementation of the AQMP which was approved in 2024, and a transparent implementation timeline for the AQMP with measurable deliverables. 'The department must begin interim community-level air quality assessments through mobile monitoring units, immediately initiate health risk studies in known pollution hotspots, and prioritise emergency repairs and recommissioning of existing stations in the 2024/25 adjustment budget,' she added. EDTEA's AQMP report indicated the gap and capacity analysis in the province, and revealed that the human resources capacity in KZN was limited and comprised one air quality officer and one environmental compliance officer. To adequately manage air quality, the AQMP stated that it was necessary to fill the vacant AQMP positions and expand the team. Proposed interventions in the plan included the investigation of the feasibility of renewable energy and mechanisms to regulate newly identified technologies; to develop and enforce emission reduction plans or measures for controlled emitters; and to identify any listed and controlled activities currently operating without emissions licences The management plan included health studies conducted in KZN. One study examined respiratory outcomes in association to ambient air quality among school children at primary schools located in two regions, which was the highly industrialised Durban south areas and non-industrialised Durban north areas. The outcome of the study indicated that poor respiratory health was more common in children from the Durban south region than from the north region. In the population-based sample, 32.1% of participants had asthma of some severity, 12.0% had persistent asthma, of which 4.0% had moderate to severe symptoms, and 7.8% had marked airway hyperreactivity. The south region participants were noted to have prevalent cases of severe symptoms of asthma. The results indicate that 12.2% of south region participants had moderate to severe persistent asthma compared to the northern region participants, which was 9.6%. The findings strongly suggested that the adverse respiratory symptoms had been increased by industrial pollution. THE POST

Houchin Community Blood Drive exceeds turnout expectations
Houchin Community Blood Drive exceeds turnout expectations

Yahoo

time16-05-2025

  • Health
  • Yahoo

Houchin Community Blood Drive exceeds turnout expectations

BAKERSFIELD, Calif. (KGET) — More than 200 people came to Compassion Corner with their sleeves rolled up to save lives for the Houchin Community Blood Drive on Thursday. KGET 17 News teamed up with Houchin Community Blood Bank, Valley Strong and Adventist Health on May 15, for our 17th annual community-wide blood drive. The original goal for the blood bank was to get 100 pints of blood. The turnout ended up being double that number. Houchin Community Blood Bank to giveaway $2,500 Disney gift card for May blood drive Gina Lidgett, the marketing coordinator for Houchin Community Blood Bank, thanked everyone who came out to donate on Thursday. 'Every single donation is going to go to a life here in Kern County and save your friends, your family, your neighbors,' Lidgett said. Anyone who wants to donate blood can visit any of the Houchin Blood Bank locations during regular business hours. You can view the locations and hours here. As always, a big thank you to those who gave in the spirit of the Golden Empire. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store