logo
Emirates NBD Concludes AED 3.9B Blue Line Financing

Emirates NBD Concludes AED 3.9B Blue Line Financing

TECHx9 hours ago
Home » Smart Sectors » Mobility » Emirates NBD Concludes AED 3.9B Blue Line Financing
Emirates NBD, a banking group in the Middle East, North Africa, and Türkiye (MENAT) region, has announced the conclusion of AED 3.9 billion in syndicated bonding facilities. The financing was extended to a consortium formed by MAPA, LIMAK, and CRRC to support the new Dubai Metro Blue Line project.
The Roads and Transport Authority (RTA) had earlier awarded the design and build contract for the Blue Line to the consortium. Emirates NBD engaged closely with the group through a comprehensive and collaborative process.
Valued at AED 20.5 billion, the Dubai Metro Blue Line is part of the emirate's 2040 Urban Master Plan. It aims to enhance Dubai's public transport network, reduce traffic congestion, and connect key urban areas more efficiently.
The project is expected to be completed by September 2029. Once operational, it will serve around 350,000 daily passengers by 2040. It will also provide seamless links to the existing Red and Green metro lines, as well as bus and taxi routes.
The Blue Line is designed as a state-of-the-art electrified railway and qualifies as Green Financing under Emirates NBD's Sustainable Finance Framework, specifically within the 'Clean Transportation' category.
Ahmed Al Qassim, Group Head of Wholesale Banking at Emirates NBD, said the project is a major milestone. He emphasized the bank's role in supporting Dubai's development through reliable and innovative financial solutions.
Murathan Doruk Günal, Vice President & CEO at MAPA, highlighted the consortium's commitment to Dubai's sustainable growth. He noted the successful financial closing as a key achievement.
Serdar Bacaksız, Board Member at Limak, added that the Blue Line reflects Dubai's progressive urban vision. He confirmed Limak's dedication to delivering high-impact infrastructure and enhancing connectivity. Emirates NBD provided AED 3.9 billion in syndicated bonding facilities
Project aligns with Dubai 2040 Urban Master Plan and clean transport goals
Completion set for September 2029, serving 350,000 daily passengers by 2040
The bank reiterated its position as a strategic partner in transformative infrastructure initiatives that shape the future of Dubai.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Autonomous vehicles hit the tarmac at Dubai World Central
Autonomous vehicles hit the tarmac at Dubai World Central

ARN News Center

time4 hours ago

  • ARN News Center

Autonomous vehicles hit the tarmac at Dubai World Central

A fleet of autonomous vehicles have been deployed to support ramp operations at Dubai World Central – Al Maktoum International airport (DWC). The global air and travel services provider, dnata, has rolled out six electric, self-driving baggage tractors at DWC, designed to tow luggage containers between aircraft and terminal buildings — a job traditionally done by human drivers. These autonomous vehicles, developed by TractEasy (EZTow model), can carry up to four baggage containers at once, travelling at speeds of up to 15 km per hour along pre-set routes. The move is expected to improve efficiency, safety and turnaround times on the ground. Staff who previously handled baggage transport are now being reassigned to more complex tasks, while automation helps reduce human error and streamline operations. The project, valued at AED 6 million, currently operates at Level 3 autonomy with minimal oversight. dnata plans to upgrade to Level 4 self-driving capability by early 2026. This initiative is also being used as a testbed to help shape future airport operations, especially as DWC prepares for massive expansion. The airport is set to become the largest in the world, with the capacity to handle up to 260 million passengers a year.

Dubai Metro Blue Line project to disrupt Mirdif traffic, RTA warns
Dubai Metro Blue Line project to disrupt Mirdif traffic, RTA warns

The National

time5 hours ago

  • The National

Dubai Metro Blue Line project to disrupt Mirdif traffic, RTA warns

Dubai's Roads and Transport Authority on Tuesday warned motorists of traffic diversions in the Mirdif area as construction work is set to begin on the Dubai Metro Blue Line. The authority also advised drivers to use alternative routes where possible and to plan their trips in advance. The roundabout intersection between 5th and 8th street near City Centre Mirdif will be closed, with a diversion in place. This will also be the case in the opposite direction, from 8th to 5th street towards Algeria Street. An alternative access road will be provided for City Centre Mirdif mall visitors, the authority added, with an available U-turn in place for residents near Ghoroob Square. What is Dubai Metro Blue Line? Work began on the Metro project in June after an announcement from Sheikh Mohammed bin Rashid, Vice President and Ruler of Dubai. The Blue Line is set to transform the north-east of the city, easing traffic congestion and establishing a direct link with Dubai International Airport. The Dh18 billion ($4,9 billion) project will include 14 new stations and add 30km to the Metro network, with 15.5km of it underground. The expansion is part of the Dubai 2040 Urban Master Plan, which has easier commuting among its top priorities to cater for a fast-growing population. Dubai's Roads and Transport Authority said the Blue Line would connect five principal urban regions of Dubai – Bur Dubai/Deira, Downtown/Business Bay, Dubai Silicon Oasis, Dubai Marina/JBR and Expo City Dubai. When completed, the Metro network will be 131km long and encompass 78 stations served by 168 trains. The number of Dubai Metro passengers is expected to exceed 300 million in 2026 and reach 320 million by 2031, Dubai Media Office reports.

Autonomous vehicles hit the tarmac at Dubai World Central
Autonomous vehicles hit the tarmac at Dubai World Central

TAG 91.1

time5 hours ago

  • TAG 91.1

Autonomous vehicles hit the tarmac at Dubai World Central

A fleet of autonomous vehicles have been deployed to support ramp operations at Dubai World Central – Al Maktoum International airport (DWC). The global air and travel services provider, dnata, has rolled out six electric, self-driving baggage tractors at DWC, designed to tow luggage containers between aircraft and terminal buildings — a job traditionally done by human drivers. These autonomous vehicles, developed by TractEasy (EZTow model), can carry up to four baggage containers at once, travelling at speeds of up to 15 km per hour along pre-set routes. The move is expected to improve efficiency, safety and turnaround times on the ground. Staff who previously handled baggage transport are now being reassigned to more complex tasks, while automation helps reduce human error and streamline operations. The project, valued at AED 6 million, currently operates at Level 3 autonomy with minimal oversight. dnata plans to upgrade to Level 4 self-driving capability by early 2026. This initiative is also being used as a testbed to help shape future airport operations, especially as DWC prepares for massive expansion. The airport is set to become the largest in the world, with the capacity to handle up to 260 million passengers a year.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store