
Traders face losses after basement market floods in Greater Noida West society
Dinesh Sharma, who owns a grocery shop in the Panchsheel Hynish society market, told TOI that the water receded by Wednesday morning, but all shop owners in the market lost goods worth lakhs of rupees.
All perishable items like bread, milk, eggs, biscuits, etc., had to be thrown away. Even pulses, grains, and flour had to be disposed of as they decomposed in the 2 to 3-foot waterlogged shops.
You Can Also Check:
Noida AQI
|
Weather in Noida
|
Bank Holidays in Noida
|
Public Holidays in Noida
|
Gold Rates Today in Noida
|
Silver Rates Today in Noida
"There is no proper drainage of water in the market.
As a result, the problem recurs if there are heavy showers. The first such flooding occurred on July 30, the second on Aug 9, and the third on Aug 12, the last two within three days," said Dinesh, who suffered immediate losses of about Rs 2-3 lakhs.
Sanjeev Sharma, who works in one of three general stores owned by one owner, assessed the loss to be about Rs 15 lakhs. He said that the compressors of the refrigerators in the three shops were destroyed in the waterlogging.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Treatment That Might Help You Against Back Pain!
Back Pain Treatment | Search Ads
Undo
There are 14 shops in the commercial area of society, maintained by the AOA management. These include grocery stores, salons, medical shops, including a Jan Aushidhi shop, beauty parlours, and more.
Traders maintained that while four pumps were deployed by the society maintenance to pump out water from morning till 7 pm, they were not enough as the pumps were of low 1 hp capacity each. While the market resumed its daily activity on Wednesday, traders remain worried lest another spell of showers lead to further damage.
However, AOA secretary of the society, Vijay Rastogi, told TOI that all necessary actions have been taken to ensure no further flooding. "There is a drain that runs parallel to the service lane of the society. It is at a mere 20m distance from the market. It flooded and overflowed, drowning the service lane and the market area during the recent showers. Though we deployed pumps, the process took time as the water had to be released through the overflowing drain," he said.
Stay updated with the latest local news from your
city
on
Times of India
(TOI). Check upcoming
bank holidays
,
public holidays
, and current
gold rates
and
silver prices
in your area.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


NDTV
19 minutes ago
- NDTV
Ola Diamondhead Showcased: 0-100 kmph In 2 Secs, Rs 5 Lakh Target Price
Ola Electric has showcased the prototype of the Diamondhead electric motorcycle at its Sankalp 2025 event. While revealing the details of the electric motorcycle, the brand revealed that it expects to begin production of the machine by 2027. All of it while targeting a price of Rs 5 lakh. This is a significant development because the bike is focused on performance and is claimed to have a 0-100 km/h time of 2 seconds. The Diamondhead features a cutting-edge design. True to its name, it has a diamond-shaped front end, a sleek horizontal LED light strip, an innovative headlamp, and a sharp rear. The bike that was showcased boasted sleek body panels that distinguished it from other electric motorcycles. Also Read: Ola has mentioned that it will use lightweight materials such as space-grade aluminum, carbon fiber, and magnesium in the construction of the Diamondhead, aiming to reduce weight and enhance performance. While features like active aerodynamics and adaptive suspension have been present in motorcycles for some time, the Diamondhead will introduce active ergonomics as well. This feature intends to assist the rider in maintaining better control of the bike's functions by adjusting the handlebars or foot pegs during the ride. Additionally, the Diamondhead will be equipped with safety features like ADAS, traction control, and AI integration. Furthermore, the overall experience is expected to be improved with Ola's development of a 'Smart AR' helmet and smart wearables, creating a cohesive ecosystem with the motorcycle. The power source for the Diamondhead is Ola's Bharat Cell 4680 battery. By the time it enters production, Ola plans to enhance this battery for increased power, extended range, and improved performance. Upon its market release, it will rival other high-end electric motorcycles such as the Ultraviolette F77.


Hindustan Times
19 minutes ago
- Hindustan Times
LIC AAO & AE Recruitment 2025: Notification for 841 posts released at licindia.in, registration begins today
Life Insurance Corporation of India has released the LIC AAO and AE Recruitment 2025 notification. Candidates who want to apply for Assistant Administrative Officers and Assistant Engineer posts can find the direct link through the official website of LIC India at This recruitment drive will fill up 841 posts in the organisation. LIC AAO & AE Recruitment 2025: Notification for 841 posts released at registration begins today The registration process begins on August 16 and will end on September 8, 2025. Read below for eligibility, selection process and other details. Vacancy Details 1. Assistant Engineers: 81 posts 2. Assistant Administrative Officer (AAO) Specialist: 410 posts 3. Assistant Administrative Officer (AAO-Generalist): 350 posts Eligibility Criteria Candidates who want to apply for the posts mentioned above can check the educational qualification and age limit through the Detailed Notification available here. Application Fee The application fee is ₹85/- + Transaction Charges + GST for SC/ST/ PwBD candidates and for all other candidates, the application cum intimation charges is Rs. 700 /- + Transaction Charges +GST. Selection Process The selection process for Assistant Administrative Officers comprises of three tiered process involving Preliminary Exam, Mains Exam and Interview and subsequent Pre-recruitment Medical examination. The marks obtained in the Preliminary Examination (Phase-I) will NOT be added for preparing the final merit list for selection. Marks obtained in the Main Examination only will be considered for shortlisting for interview. Marks obtained in the Main Examination + marks obtained in Interview will be considered for final merit listing of candidates. For more related details candidates can check the official website of LIC India. AAO Specialist & AE Detailed Notification


Hans India
19 minutes ago
- Hans India
PM Modi to inaugurate Rs 11,000 crore highway projects in Delhi tomorrow
New Delhi: Prime Minister Narendra Modi is set to inaugurate two major National Highway projects in the national capital on Sunday, that will help in easing congestion on the roads and also add to smooth and better connectivity in Delhi-NCR region. The two projects, having an estimated cost of nearly Rs 11,000 crore, will be launched by the Prime Minister at around 12.30 p.m. in Rohini, following which he will also address the public gathering. The projects, Delhi section of the Dwarka Expressway and Urban Extension Road-II (UER-II), are part of the government's comprehensive plan to decongest the capital, improve connectivity, cut travel time, and reduce traffic in Delhi and its surrounding areas. The 10.1 km long Delhi section of Dwarka Expressway has been developed at a cost of around Rs 5,360 crore. The section will also provide multi-modal connectivity to Yashobhoomi, DMRC Blue line and Orange line, the upcoming Bijwasan railway station and the Dwarka cluster Bus Depot. Out of the 10 km long stretch, 5.9 km will be from Shiv Murti intersection to Dwarka Sector-21, while 4.2 km will connect Dwarka Sector-21 to the Delhi-Haryana Border. PM Modi had inaugurated the 19 km-long Haryana section of the Dwarka Expressway in March 2024. The second project to be opened for public is the Alipur to Dichaon Kalan stretch of Urban Extension Road-II (UER-II) along with new links to Bahadurgarh and Sonipat, built at a cost of around Rs 5,580 crore. It is expected to ease traffic on Delhi's Inner and Outer Ring Roads and busy points like Mukarba Chowk, Dhaula Kuan, and NH-09. It will provide direct access to Bahadurgarh and Sonipat, reducing traffic snarls, speeding up goods movement in the NCR, and eventually contributing to seamless industrial connectivity. These initiatives reinforce the Centre's vision of creating world-class infrastructure in the capital that enhances ease of living and ensures seamless mobility.