
Long Aton residents urgently seek repairs for vital timber bridge
Screengrab from video shows the sorry state of the broken bridge leading to Long Aton in Ulu Tinjar, Baram.
MIRI (May 7): Residents are calling on the authorities to urgently repair a vital timber bridge on the road to Long Aton settlement in Ulu Tinjar, which collapsed over a week ago.
The collapse has jeopardised the movement of people and goods, with those affected including students and teachers at SK Long Aton and students studying at SMK Tinjar.
The Kenyah settlement is located 210km from here.
'Nearly 300 people, including the villagers from the 48-door settlement are affected, and the broken bridge is now passable only by foot or motorcycle but impassable to four-wheel drive vehicles,' villager Gilbert Magok Lawrence told The Borneo Post.
'The condition of this bridge has worsened since February this year with erosion setting in. Now vehicles cannot pass through the road because the wooden logs under the bridge are also broken and have rotted away.'
The school and village chiefs have raised the issue to the authorities, including Telang Usan assemblyman Datuk Dennis Ngau, who has pressed for expedited repairs.
The broken bridge crosses Yang Paceik river, near Apau Nyaring village.
Earlier this month, Deputy Premier Datuk Amar Douglas Uggah Embas said the state government is aware of the infrastructure issues in Ulu Baram and acknowledged that the problems in the constituency are indeed significant.
He will present a working paper outlining the procedures for maintaining these areas, including the many ageing and dilapidated bridges, during the next Cabinet meeting.
Uggah has suggested that former logging roads in Ulu Baram that are currently classified as village roads should be upgraded to state roads to allow for higher maintenance funding under the Malaysian Road Records Information System. lead Long Aton timber bridge Ulu Tinjar
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Borneo Post
8 hours ago
- Borneo Post
Longstanding water woes along Nibong-Tada should have been resolved, says former Kanowit MP
Moggie says he could empathise with the frustration of those in Lawas over their unresolved water woes. – Stock photo KUCHING (June 11): Former Kanowit MP Tan Sri Leo Moggie Irok said residents of a few longhouses located along the Nibong-Tada road in Kanowit had their Gawai Dayak celebration marred by water supply disruptions. Moggie, who is former Tenaga Nasional Berhad chairman and former federal Minister of Energy, Communications and Multimedia, said he could empathise with the frustration of those in Lawas over their unresolved water woes. 'I refer to your ( The Borneo Post ) article titled 'Frustration mounts in Lawas over unresolved water woes' published online on June 11. Similarly, residents of a number of longhouses along the Nibong-Tada road in Kanowit had their Gawai celebration marred by disruption of water supply. 'The issue of unsatisfactory water supply along the Nibong-Tada road was thought to have been resolved, as I had personal exchanges of correspondence with the relevant agencies—including the Ministry of Rural and Regional Development in Putrajaya and the Sarawak Rural Water Supply Department—in 2017 and 2018 over the matter,' he told The Borneo Post . He said upgrading works were supposed to have been carried out. 'Yes, I can empathise with the frustration of those in Lawas. As for the residents of the various longhouses along the Nibong-Tada road, they are looking forward to celebrating Gawai next year without any issues of basic facilities,' he said. He said that while Sarawak prepares for a visionary future, its current basic needs must also be properly addressed. The Borneo Post is reaching out to the relevant agencies and ministry for comment over the issue. Gawai Kanowit lead Leo Moggie water woes


Borneo Post
29-05-2025
- Borneo Post
Anifah may contest in Bongawan if voters insist
Anifah KOTA KINABALU (May 29): Parti Cinta Sabah (PCS) president Tan Sri Anifah Aman said that he would consider contesting in the coming state election if that is the wish of the constituents in Bongawan. Speaking to The Borneo Post today, Anifah explained that his recent statement on social media was about wresting the Bongawan constituency from incumbent Dr Daud Yusof. The former Kimanis Member of Parliament said that it is PCS' aim to ensure that all Gabungan Rakyat Sabah (GRS) candidates are victorious in the election. When asked if he intends to contest in the Bongawan seat as reported by several mainstream media recently, Anifah replied,' not exactly, I want to find the suitable candidate because I know my hardcore voters when I served as the Kimanis Member of Parliament. 'So I am just helping to identify the suitable and winnable candidate,' said Anifah who had served as former Malaysia Foreign Minister. And when asked if the constituents insist that they want him to contest, Anifah replied, 'Then I will consider. The recent reports said that the PCS president made the announcement of his intention to contest the Bongawan state seat in the upcoming Sabah state election via Facebook. Anifah was quoted as saying that his decision is not aimed at merely challenging the incumbent, Dr Daud. 'I respect him as a colleague. However, the people of Bongawan want development equivalent to that of a full-fledged district. This has long been promised, and it should already have been enjoyed, but it is still not felt. 'Basic facilities such as a hospital, fire station, road connectivity, and other infrastructure are still neither planned nor championed. It remains quiet and neglected. Where is the political will that was once proclaimed?' Anifah was quoted as saying.


Borneo Post
23-05-2025
- Borneo Post
Telang Usan rep proposes green hydrogen-solar power project for Long Bedian
File photo of private solar panels at Tadika Sedidik Long Jenalong. KUCHING (May 23): Telang Usan assemblyman Dato Dennis Ngau has proposed the implementation of a large-scale green energy project in Long Bedian sub-district, aimed at providing 24-hour electricity to rural communities. The proposal was made during his debate on the Motion of Appreciation for Yang di-Pertua Negeri's speech at the Sarawak Legislative Assembly (DUN) today. 'Based on the Sarawak government's commitment to green energy initiatives, I would like to propose a solar and hydrogen energy system project in the Long Bedian sub-district of Telang Usan to meet the need for 24-hour electricity,' said Dennis. 'This would be a large-scale pilot project following the proven success of a similar system at the Long Loyang Health Clinic,' he added. If implemented, the project would be the first of its kind in Malaysia, he said. According to Dennis, the proposed solar-hydrogen system would supply electricity to households in nearby villages, government offices, schools, clinics, and even nearby oil palm plantations. 'It is time for us to move away from battery systems, diesel generators, and other environmentally harmful sources – including the cost of purchasing and supplying diesel – and shift towards a green hydrogen energy system,' he said. He emphasised that 24-hour electricity powered by green hydrogen would be more efficient than current systems and would improve the quality of life and well-being of rural communities. Dennis noted that the proposal follows the successful pilot of a hybrid solar-hydrogen system at the Long Loyang Health Clinic in Ulu Tinjar, which has been operational since its launch by State Minister for Utility and Telecommunication, Dato Sri Julaihi Narawi, on August 8, 2022. 'The H2E1 system launched at Long Loyang Clinic is now ready to be expanded to off-grid rural villages in Sarawak,' he said. He urged the Sarawak government to implement this system in the state constituencies of N77 Telang Usan, N78 Mulu, and N76 Marudi to enable residents to enjoy uninterrupted electricity. 'Currently, 99 percent of settlements in N77 Telang Usan rely on solar systems under the Sarawak Alternative Rural Electrification Scheme (Sares),' Dennis said. He expressed confidence that the proposed initiative aligns with the Yang di-Pertua Negeri's call for Sarawak to advance the development of green and renewable energy sources. 'I believe it is time for Sarawak to take bold steps in expanding the implementation of the green hydrogen solar system,' he said. Dennis Ngau DUN electricity green energy Long Bedian