
TVET Commission to streamline vocational education in Malaysia
Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi said the commission will eliminate overlaps and improve resource efficiency across ministries and institutions.
He referenced Prime Minister Datuk Seri Anwar Ibrahim's 13th Malaysia Plan speech, which emphasised strengthening the National TVET Policy 2030.
'The TVET Commission will regulate institutions, monitor strategy implementation, and ensure inter-ministerial coordination,' he said during the Dewan Rakyat session.
Responding to Lee Chuan How (PH-Ipoh Timor), Ahmad Zahid acknowledged the need for better outreach to Chinese youth regarding TVET opportunities.
He commended Lee, a TVET graduate, for actively promoting vocational education among students.
'His efforts have successfully encouraged Chinese students to join TVET programmes,' Ahmad Zahid added.
On Felda land inheritance issues, he noted that the government started reviewing the Land Act (Group Settlement Areas) 1960 in September 2022.
Five key priorities were identified, including governance improvements and protecting land ownership rights.
The Felda Regulatory Division is committed to resolving housing concerns for second and third-generation settlers.
Ahmad Zahid will visit Felda Jengka on Sept 6 to address these matters further. - Bernama
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Star
3 hours ago
- The Star
Chinese-built Ethiopian Airlines headquarters building tops out
ADDIS ABABA, Aug. 18 (Xinhua) -- The new Ethiopian Airlines Group headquarters building, which is under construction in Addis Ababa, the East African country's capital, has topped out, marking completion of its main structural works. The topping-out ceremony of the 45-meter-high structure was held on Monday, attended by representatives from the Ethiopian Airlines Group and China Civil Engineering Construction Corporation (CCECC). Mesfin Tasew, chief executive officer (CEO) of Ethiopian Airlines Group, expressed confidence that the project will be completed on schedule, meeting the long-awaited desire of the airline. "We want this headquarters to be completed as soon as possible. It is our expectation that this headquarters will be completed with the highest level of quality," said Tasew. Built by the CCECC on a total land area of over 33,560 square meters, the project consists of six different buildings with multiple facilities, including commercial, corporate, and customer services. Noting that Chinese construction companies have successfully accomplished different projects for the airline, Tasew expressed confidence in the CCECC to deliver the project to the airline's satisfaction. "Our decision to engage with CCECC shows our trust and confidence in the company to construct and deliver state-of-the-art facilities," the CEO reiterated. Chen Sichang, general manager of CCECC, vowed to deliver the project on time and with top quality. "Now, the main structure has been completed, our commitment to engineering excellence does not stop here. We pledge to our client and all stakeholders that we will continue to uphold our corporate motto of diligence, integrity, and perseverance," Chen said. Launched on Aug. 30, 2023, the Ethiopian Airlines Group headquarters building project is set to be completed in August 2026. Recently, Ethiopian Airlines, the flagship carrier of Ethiopia, has launched the construction of a new mega airport near Bishoftu town, about 42 km east of Addis Ababa. During the topping-out ceremony, the CEO invited CCECC to participate in the construction of the new mega airport.


New Straits Times
3 hours ago
- New Straits Times
Hong Kong arrests two over suspected US$6.7mil water scam
HONG KONG: Hong Kong police said Monday they had arrested two people over a suspected scam involving a water supplier that may have cheated the government in a contract worth nearly US$7 million. A company named Xin Ding Xin won a deal in June to provide 1.88 million bottles of water for dispensers in some government offices – the first time such a contract went to a Chinese brand, according to local media. But police said the firm was found to have relied on false documents during the tender process, claiming to source its water from another mainland Chinese supplier when in fact they had no business ties. Officers arrested a 61-year-old man and a 57-year-old woman for fraud on Sunday, seizing around 2,600 bottles of water in a warehouse along with documents and electronic devices. The arrests have prompted water-cooler discussions across the Chinese finance hub on how bureaucrats missed the tell-tale signs of a scam when awarding a 36-month contract worth HK$52.9 million (US$6.77 million). Payment for the delivered batches has not yet been settled, according to police. The Government Logistics Department said on Monday that it had terminated its bottled water supply contract with Xin Ding Xin, as well as "three other contracts for the supply of chemicals which were affiliated with XDX's owner." Christopher Hui, Hong Kong's Secretary for Financial Services and the Treasury, set up a dedicated task force following an urgent meeting on Sunday. Hui also ordered "remedial actions" and invited the Audit Commission to review the tender exercise. "The incident has raised concerns among government colleagues and drawn extensive attention from the public," he said in a press release. Aside from the two arrests on Sunday, one mainland Chinese man remains at large, police said.

Barnama
4 hours ago
- Barnama
Kelantan Has Potential To Become Major Local Onion Producer
KUALA LUMPUR, Aug 18 (Bernama) -- The Ministry of Agriculture and Food Security (KPKM) is optimistic that Kelantan has the potential to become a major producer of local onions next year. Its minister, Datuk Seri Mohamad Sabu, said the state's soil fertility was deemed suitable for onion cultivation and initial trials showed promising results. He said KPKM had approved an allocation of RM6 million for the Onion Cultivation Development Project in three states, namely Selangor, Perak and Kelantan, involving 80 participants with an area of 94.85 hectares (ha), which includes 11 farmers (40 ha) in Selangor, 52 farmers (26.85 ha) in Kelantan, and 17 farmers (28 ha) in Perak. Recently, Kelantan carried out its first harvest with an expected production yield of 18.4 tonnes from an area of 4.6 ha at the Telong Food Production Park (TKPM) in Bachok, which used the BAW-1 and BAW-2 varieties. "This harvest result shows a positive achievement as it recorded high production of around four tonnes per hectare, so Insya-Allah, next year we want Kelantan to become the main producer of this onion because its land is fertile for onion cultivation," he said when winding up the debate on the motion on the 13th Malaysia Plan (RMK13) for KPKM in the Dewan Rakyat today. Regarding production costs, Mohamad explained that a comprehensive study has not yet been conducted to determine the actual cost comparison between local and imported onions. 'Regarding production costs, we still don't have precise figures. Some use the greenhouse method, which is quite expensive. Overall, the government has not yet finalised the production cost for one tonne of local onions. 'The cost also varies depending on whether it is grown outdoors or in a greenhouse. However, we see that the price gap with imported onions is not too wide," he said. He also said that although there are no official figures yet, the government expects local onion production to reduce dependence on onion imports by up to 30 per cent.