logo
Collective Mining Drills 397.50 Metres at 2.62 g/t Gold Equivalent Commencing from Surface at Apollo

Collective Mining Drills 397.50 Metres at 2.62 g/t Gold Equivalent Commencing from Surface at Apollo

Cision Canadaa day ago
High-grade gold, copper, silver and tungsten assay results have been received for the further six holes from the shallow drilling program designed to outline and expand the zone of mineralization with highlighted results as follows:
397.50 metres @ 2.62 g/t gold equivalent (1.20 g/t gold, 60 g/t silver, 0.33% copper and 0.07% WO 3) from surface (APC-122) with a grade accumulation of 1,041 gram x metres. The hole bottomed while still in strong mineralization.
135.20 metres @ 2.71 g/t gold equivalent (0.66 g/t gold, 50 g/t silver, 0.67% copper, and 0.15% WO 3) from surface (APC-119)
TORONTO, July 14, 2025 /CNW/ - Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) ("Collective" or the "Company") is pleased to announce assay results for six diamond drill holes designed to better outline and expand the shallow portion of gold-silver-copper-tungsten mineralization at the Apollo system ("Apollo"). Apollo, which begins at surface and is strongly mineralized over 1,200 vertical metres and open at depth, is the most advanced discovery made to date within the Company's multi-target, Guayabales project in Caldas, Colombia.
The Company currently has nine drill rigs operating as part of its fully funded 70,000 metre drill program for 2025 with seven rigs operating at the Guayabales Project and two rigs turning at the San Antonio Project. Drilling in the Guayabales Project is focusing on defining the shallow mineralization, high-grade sub-zones, expanding the high-grade Ramp Zone at depth and testing a series of Apollo look-alike gravity targets which were announced recently (see press release dated June 30, 2025). Two additional deep capacity rigs are being mobilized to resume testing the high-grade Ramp Zone with the first of these rigs expected to begin operations by early August 2025.
Approximately 129,500 metres of diamond drilling has been completed to date at the Guayabales Project, including 91,000 metres at Apollo. There are currently twenty-five drill holes in the lab with assay results for most of these holes expected in the near term.
Ari Sussman, Executive Chairman commented: "Drilling at Apollo continues to intercept impressive mineralization which begins at surface, extends over more than 1,200 vertical metres and is still open at depth. The second half of the year is going to be exciting as we are positioning the Company to deliver the next leg of growth. Firstly, and importantly, the first of two, deep penetrating rigs has just arrived in Colombia and will soon be mobilized to Apollo where it will begin an expansion program of the high-grade Ramp Zone located at the bottom of Apollo. Secondly, exploratory drilling is underway on the series of Apollo look-alike gravity anomalies located within 2 kilometres of Apollo and on trend from the Marmato mine. Finally, our second rig at the San Antonio Project is now turning as we follow up on promising earlier drill results indicating the potential to discover a large porphyry system."
Details (see Table 1 and Figures 1-3)
Six drill holes drilled from Pad 22 and Pad 23 intersected high-grade gold, silver, copper and tungsten mineralization at or near surface in intervals ranging between 50 and 400 metres, with results as follows:
APC-122: 397.50 metres @ 2.62 g/t gold equivalent from surface and bottoming in high-grade mineralization including:
57.70 metres @ 4.00 g/t gold equivalent from 17.40 metres
40.55 metres @ 4.00 g/t gold equivalent from 293.25 metres
34.80 metres @ 4.13 g/t gold equivalent from 348.20 metres
The intercept in hole APC-122 yielded 1,041 g/t gold equivalent on a gram X metre basis and is the eighteenth gold equivalent accumulation drilled at Apollo at over 1,000 grams x metres.
135.20 metres @ 2.71 g/t gold equivalent from surface and including 43.85 metres @ 3.15 g/t gold equivalent (APC-119 drilled in a northwest direction from Pad 22).
152.10 metres @ 2.06 g/t gold equivalent from surface and including 23.0 metres @ 3.19 g/t gold equivalent (APC-120 drilled to the south from Pad 22).
73.75 metres @ 1.69 g/t gold equivalent from 7.25 metres downhole and including 19.85 metres @ 3.04 g/t gold equivalent (APC-116 drilled to the northwest from Pad 23).
72.85 metres @ 2.01 g/t gold equivalent from 15.0 metres downhole and 20.30 metres @ 2.61 g/t gold equivalent from 113.65 metres downhole (APC-118 drilled in a northeast direction from Pad 23).
68.30 metres @ 1.58 g/t gold equivalent from 42.50 metres and including 23.0 metres @ 3.31 g/t gold equivalent (APC-121 drilled in a northeast direction from Pad 23).
Over two thirds of the 33-hole infill drill program have now been completed with assays still pending for eight holes. To date, drill intercepts from the shallow program have expanded the volume of the shallow mineralized area by approximately 5 percent. Once the shallow drilling infill program has been completed, the average drill hole spacing will be 35 metres from surface to a vertical depth of 150 metres.
Table 1: Assays Results for Drill Holes APC-116, APC-118, APC-119, APC-120, APC-121 and APC-122
*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.97) + (Ag (g/t) x 0.015 x 0.85) + (Cu (%) x 1.44 x 0.95) + (WO 3 (%) x 4.84 x 0.72) utilizing metal prices of Au – US$2,200/oz, Ag – US$33/oz, Cu – US$4.62/lb and WO 3 – US$15.51/lb and recovery rates of 97% for Au, 85% for Ag, 95% for Cu and 72% for WO 3. `1 Recovery rate assumptions for metals are based on metallurgical results announced on October 17, 2023, April 11, 2024, and October 3, 2024. True widths are between 60%-100% of the total length and grades are uncut.
About Collective Mining Ltd.
To see our latest corporate presentation and related information, please visit www.collectivemining.com.
Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, Collective is a gold, silver, copper and tungsten exploration company with projects in Caldas, Colombia. The Company has options to acquire 100% interests in two projects located directly within an established mining camp with ten fully permitted and operating mines.
The Company's flagship project, Guayabales, is anchored by the Apollo system, which hosts the large-scale, bulk-tonnage and high-grade gold-silver-copper-tungsten Apollo system. The Company's objectives are to improve the overall grade of the Apollo system by systematically drill testing newly modeled potentially high-grade sub-zones, expand the Apollo system by stepping out along strike to the north and expanding the newly discovered high-grade Ramp Zone along strike and to depth and drill a series of less advanced or newly generated targets including Trap, the Knife and X. Additionally, the Company has launched its largest drilling campaign in history at the San Antonio Project as it hunts for a large bulk-tonnage porphyry system.
Management, insiders, a strategic investor and close family and friends own 44.5% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. The Company is listed on both the NYSE and TSX under the trading symbol "CNL".
Qualified Person (QP) and NI43-101 Disclosure
David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).
Technical Information
Samples were cut by Company personnel at Collective Mining's core facility in Caldas, Colombia. Diamond drill core was sawed and then sampled in maximum 2 metres intervals, stopping at geological boundaries. Drill hole core diameter is a mix of PQ, HQ and NQ depending on the depth of the drill hole.
Core samples have been prepared and analyzed at ALS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.
Information Contact:
Follow Executive Chairman Ari Sussman (@Ariski73) on X
Follow Collective Mining (@CollectiveMini1) on X, (Collective Mining) on LinkedIn, and (@collectivemining) on Instagram
This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities legislation (collectively, "forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: the anticipated advancement of mineral properties or programs; future operations; future recovery metal recovery rates; future growth potential of Collective; and future development plans.
These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding future events including the direction of our business. Management believes that these assumptions are reasonable. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: risks related to the speculative nature of the Company's business; the Company's formative stage of development; the Company's financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; conclusions of future economic evaluations; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold, precious and base metals or certain other commodities; fluctuations in currency markets; change in national and local government, legislation, taxation, controls regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formation pressures, cave-ins and flooding); inability to obtain adequate insurance to cover risks and hazards; the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties, as well as those risk factors discussed or referred to in the annual information form of the Company dated March 24, 2025. Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements and there may be other factors that cause results not to be anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements.
SOURCE Collective Mining Ltd.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

MEDIA ADVISORY - Meet the Québec player who won a share of the $70,000,000 jackpot Français
MEDIA ADVISORY - Meet the Québec player who won a share of the $70,000,000 jackpot Français

Cision Canada

time24 minutes ago

  • Cision Canada

MEDIA ADVISORY - Meet the Québec player who won a share of the $70,000,000 jackpot Français

MONTRÉAL, July 15, 2025 /CNW/ - Members of the media are invited to meet the Québec player who won a share of the $70,000,000 jackpot in the July 11 Lotto Max draw. The meeting will be held on Wednesday, July 16, at 11:15 a.m. at the Loto-Québec head office, located at 500 Rue Sherbrooke Ouest in Montréal. Please email [email protected] to confirm your attendance. In Summary

BREAKING GROUND FOR A NEW TRANSITIONAL APARTMENT IN PRINCE ALBERT Français
BREAKING GROUND FOR A NEW TRANSITIONAL APARTMENT IN PRINCE ALBERT Français

Cision Canada

time29 minutes ago

  • Cision Canada

BREAKING GROUND FOR A NEW TRANSITIONAL APARTMENT IN PRINCE ALBERT Français

PRINCE ALBERT, SK, July 15, 2025 /CNW/ - Solving Canada's housing crisis requires immediate action to bring down costs. To provide Canadians with increased access to affordable and sustainable housing, the governments of Canada and Saskatchewan today announced funding of $3.76 million to help build a new transitional housing apartment for individuals in need in Prince Albert, with a focus on women experiencing hardship. This low-rise apartment will provide affordable and supportive housing and will offer temporary accommodation and aims to assist individuals in moving from challenging circumstances toward stability, well-being and independence. Developed by YWCA Prince Albert, the multi-million-dollar project will add 20 one-bedroom units to the city, which will contain 10 bachelor units, eight one-bedroom units, two one-bedroom barrier-free units and a common area for services. The property will be located on 18 th Street West and the units are expected to be completed in early 2027. YWCA Prince Albert is a non-profit organization providing shelter, supportive housing, and assistance to marginalized populations to help break the cycle of poverty. For this project, YWCA Prince Albert (YWCA) plans to give priority tenancy to women transitioning from YWCA programs, which includes women and youth at risk of violence and homelessness and young mothers. Tenants will receive support services through YWCA Prince Albert's various programs. As we build a strong Canadian housing sector, purposeful collaboration will be essential. That means working hand-in-hand with the non-profit sector to bring down costs and build homes at a scale and speed not seen since the Second World War. Quotes: "These homes being built by YWCA Prince Albert will provide individuals in need a safe space and peace of mind. The federal government is committed to supporting communities across the country in ensuring every Canadian has a place to call home." – The Honourable Gregor Robertson, Minister of Housing and Infrastructure and Minister responsible for Pacific Economic Development Canada "This investment will provide vulnerable women with a safe, supportive place to call home and hope for a brighter future. With strong support of community partners, we are happy to see construction begin on this new transitional housing development that will provide stability and life-changing support for women in need," – The Honourable Terry Jenson, Minister of Social Services and Minister Responsible for Saskatchewan Housing Corporation (SHC) "We are glad to be starting construction on this much-needed project in partnership with the municipal, provincial, and federal governments. Between rising costs and low housing supply in Prince Albert, finding appropriate housing is challenging, particularly on limited or fixed incomes. Our new twenty-unit low-income housing build will help to address some of the gaps we're seeing for individuals and families living in the lower income brackets. We will be providing support as needed through our Community Connection Centre for things such as employment assistance, renter information, and more." -- Donna Brooks, YWCA Prince Albert CEO. "We're pleased to support this important initiative. Affordable housing is a vital part of a healthy community, and this project is an important step toward ensuring everyone in Prince Albert has access to safe, stable housing," – Michael Nelson, Planning and Development Manager, City of Prince Albert. Quick facts: The National Housing Strategy (NHS) is a 10+ year, $115+ billion plan to give more Canadians a place to call home. Progress on programs and initiatives are updated quarterly on the Housing, Infrastructure and Communities Canada (HICC) website. The Housing and Infrastructure Project Map shows affordable housing projects that have been developed. As of March 2025, the federal government has committed $65.84 billion to support the creation of over 166,000 units and the repair of over 322,000 units. These measures prioritize those in greatest need, including seniors, Indigenous Peoples, people experiencing or at risk of homelessness, and women and children fleeing violence. NHS is built on strong partnerships between the federal, provincial, and territorial governments, and continuous engagement with others, including municipalities, Indigenous governments and organizations, and the social and private housing sectors. This includes consultations with Canadians from all walks of life, and people with lived experience of housing need. All NHS investments delivered by the federal, provincial, and territorial governments will respect the key principles of NHS that support partnerships, people, and communities. In 2019, the Government of Canada and the Government of Saskatchewan entered into an agreement through the National Housing Strategy. The Canada-Saskatchewan Bilateral Agreement will invest $585 million over 10 years, which is cost matched between the federal and provincial governments. The Rental Development Program (RDP) provides one-time capital funding in the form of a forgivable loan to assist in the development of affordable rental housing units for households with low incomes. The RDP is funded by Canada Mortgage and Housing Corporation (CMHC) and Saskatchewan Housing Corporation (SHC). YWCA Prince Albert provides shelter, supportive housing, and assistance to marginalized populations to help break the cycle of poverty. Operating since 1912, YWCA offers two crisis shelters, housing projects, housing case management, recovery services, settlement services, and comprehensive support programs. Since 2007, Saskatchewan Housing Corporation (SHC) has worked with Prince Albert housing providers to develop 415 affordable rental units. In addition, through SHC's Shelter Enhancement Program, YWCA has completed multiple shelter improvements benefiting victims of family violence, with funding of $199,000. Funding provided for this project is as follows: $3,762,516 in cost-matched funding from the Government of Canada and the Government of Saskatchewan through the National Housing Strategy (NHS) – Saskatchewan Priorities Initiative (SPI) $414,694 from YWCA Prince Albert $30,000 from the City of Prince Albert Associated Links: Visit for the most requested Government of Canada housing information. CMHC plays a critical role as a national facilitator to promote stability and sustainability in Canada's housing finance system. Our mortgage insurance products support access to homeownership and the creation and maintenance of rental supply. We also actively support the Government of Canada in delivering on its commitment to make housing more affordable. Our research and data help inform housing policy. By facilitating cooperation between all levels of government, private and non-profit sectors, we contribute to advancing housing affordability, equity, and climate compatibility. Follow us on X, YouTube, LinkedIn, Facebook and Instagram. Progress on programs and initiatives are updated quarterly on the Housing, Infrastructure and Communities Canada (HICC) website. The Housing and Infrastructure Project Map shows affordable housing projects that have been developed so far. In November 2019, the Government of Saskatchewan released Saskatchewan's Growth Plan: the Next Decade of Growth 2020-2030, which sets out the Government's vision for a province of 1.4 million people by 2030. The Plan identifies principles, goals and actions to ensure Saskatchewan is capturing the opportunities and meeting the challenges of a growing province. To learn more, visit SOURCE Canada Mortgage and Housing Corporation (CMHC)

Automotive Properties REIT Announces July 2025 Distribution
Automotive Properties REIT Announces July 2025 Distribution

Cision Canada

time42 minutes ago

  • Cision Canada

Automotive Properties REIT Announces July 2025 Distribution

/NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR DISSEMINATION IN THE UNITED STATES/ TORONTO, July 15, 2025 /CNW/ - Automotive Properties Real Estate Investment Trust (TSX: (the "REIT") today announced a cash distribution of $0.067 per REIT unit for the month of July 2025, representing $0.804 per REIT unit on an annualized basis. Payment will be made on August 15, 2025 to unitholders of record as at July 31, 2025. About Automotive Properties REIT Automotive Properties REIT is an unincorporated, open-ended real estate investment trust focused on owning and acquiring primarily income-producing automotive and other OEM dealership and service properties located in Canada and the United States. The REIT's portfolio currently consists of 80 income-producing commercial properties, representing approximately three million square feet of gross leasable area, in metropolitan markets across British Columbia, Alberta, Saskatchewan, Manitoba, Ontario and Québec in Canada, and Florida and Ohio in the United States. Automotive Properties REIT is the only public vehicle in Canada focused on consolidating automotive and OEM dealership and service real estate properties. For more information, please visit:

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store