
Temporary closure of NPE, Besraya on Sunday for IJM Duo Highway Challenge run
New Pantai Expressway (NPE) and Sungai Besi Expressway (Besraya) will be shut down from 1am to 11am on August 3, according to a joint announcement from the highway operators.
The NPE closure will affect the stretch from KM 1.8 at Kewajipan Roundabout in Subang Jaya to KM 11 towards Bangsar, as well as the section from Kuchai Lama Entrepreneurs Park to Pantai Dalam Toll Plaza in both directions.
Meanwhile, Besraya will be closed from the Kuchai Lama Interchange to Jalan Pandan 1 at KM 21.9 towards Middle Ring Road 2 (MRR2) in both directions during the same period.
The title sponsor for the run is IJM Corporation Berhad, which owns both expressways as well as the Kajang–Seremban Highway (Lekas).
Highway officials have received approval from the Ministry of Works and Malaysian Highway Authority for the temporary closure, with Royal Malaysia Police providing traffic management support.
Motorists are urged to use alternative routes during the closure period, with detailed information available on the NPE and Besraya social media platforms.
Emergency assistance will be available through dedicated hotlines at 1-300-88-1010 for NPE and 1-800-88-0999 for Besraya during the event.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
30-07-2025
- The Sun
NPE, Besraya temporary closure for IJM Duo Highway Challenge Run 2025
KUALA LUMPUR: The New Pantai Expressway (NPE) and Sungai Besi Expressway (Besraya) will be temporarily closed from 1 am to 11 am on Sunday, Aug 3, for the IJM Duo Highway Challenge Run 2025. On the NPE, the closure will affect the section from Kilometer (KM) 1.8 at the Kewajipan Roundabout (Subang Jaya) to KM 11 towards Bangsar, and from Kuchai Lama Entrepreneurs Park to Pantai Dalam Toll Plaza in both directions. The Besraya closure will span from the Kuchai Lama Interchange to Jalan Pandan 1 at KM 21.9, heading towards the Middle Ring Road 2 (MRR2) in both directions. Wan Salwani Wan Yusoff, CEO of both highways, advised motorists to use alternative routes to avoid disruption. Information on alternative routes is available on the NPE and Besraya social media platforms. The closure, approved by the Works Ministry (KKR) and the Malaysian Highway Authority (LLM), will be supported by the Royal Malaysia Police to ensure safety and smooth traffic flow. Traffic management teams and technical staff will be deployed at strategic locations to facilitate the event. Participants, supporters, and spectators are encouraged to plan their travel and arrive early on the event day. - Bernama


Malay Mail
30-07-2025
- Malay Mail
Temporary closure of NPE, Besraya on Sunday for IJM Duo Highway Challenge run
KUALA LUMPUR July 30 — Two major expressways here will be temporarily closed this Sunday to accommodate the annual IJM Duo Highway Challenge Run. New Pantai Expressway (NPE) and Sungai Besi Expressway (Besraya) will be shut down from 1am to 11am on August 3, according to a joint announcement from the highway operators. The NPE closure will affect the stretch from KM 1.8 at Kewajipan Roundabout in Subang Jaya to KM 11 towards Bangsar, as well as the section from Kuchai Lama Entrepreneurs Park to Pantai Dalam Toll Plaza in both directions. Meanwhile, Besraya will be closed from the Kuchai Lama Interchange to Jalan Pandan 1 at KM 21.9 towards Middle Ring Road 2 (MRR2) in both directions during the same period. The title sponsor for the run is IJM Corporation Berhad, which owns both expressways as well as the Kajang–Seremban Highway (Lekas). Highway officials have received approval from the Ministry of Works and Malaysian Highway Authority for the temporary closure, with Royal Malaysia Police providing traffic management support. Motorists are urged to use alternative routes during the closure period, with detailed information available on the NPE and Besraya social media platforms. Emergency assistance will be available through dedicated hotlines at 1-300-88-1010 for NPE and 1-800-88-0999 for Besraya during the event.


The Sun
26-07-2025
- The Sun
Northern Coastal Highway to boost Sarawak connectivity by 2030
LIMBANG: The Northern Coastal Highway (NCH) project is set to transform connectivity and development in northern Sarawak, according to Works Minister Datuk Seri Alexander Nanta Linggi. The initiative, covering Lawas and Limbang, aims to integrate regions currently separated by Brunei Darussalam. Nanta highlighted the project's significance during a technical meeting in Limbang, involving teams from the Sarawak and Federal Public Works Departments (JKR), the Ministry of Works, and RECODA. 'This reflects strong collaboration between the Federal and Sarawak state governments,' he said. The NCH will provide a domestic route linking Miri, Limbang, and Lawas without passing through Brunei, reducing reliance on the Miri–Temburong–Limbang route, which currently requires four immigration checks. 'This will enhance mobility, ease daily life, and unlock economic opportunities for rural communities,' Nanta added. Key components include an 87.96 km new road, 10.16 km of access roads, 27 main structures (including 13 bridges), 44 bus stops, and four Rest & Service Areas. Five sections under Phase 1 are underway, with completion expected by 2030. Nanta emphasized the broader impact: 'This project supports the economy, tourism, logistics, and improves well-being.' The NCH will also complement the Pan Borneo Highway, linking Sarawak's central and southern regions with Brunei and Sabah via the Merapok border. - Bernama