
Delhi-Meerut RRTS trials start, line may open soon
'Recently, we conducted a successful trial run for the entire 82km corridor, and the train arrived at all stoppages between Sarai Kale Khan (in Delhi) and Modipuram (the last station in Meerut) in less than an hour. As things are progressing fast, we are hoping that the system will be operational very soon,' said NCRTC's chief public relation officer Puneet Vats.
The 82-km project is aimed at connecting the cities of Delhi, Ghaziabad and Meerut with Namo Bharat trains, and the project was scheduled to be completed in June, 2025. The train's journey from Meerut to Delhi will take 55 minutes once the entire 82km route gets operational.
Currently, the train services are operational on a 55km stretch from New Ashok Nagar in Delhi to Meerut (south), covering 11 stations with two in Delhi, eight in Ghaziabad and one in Meerut.
The entire project has 24 stations, with 13 in Meerut. The Namo Bharat trains have four stations in Meerut, while the local Metro will operate on all 13 stations on the same infrastructure.
Officials said that safety inspections on different non-operational sections are underway and a formal inauguration will follow.
Safety inspections and final approval by the Commissioner of Metro Rail Safety are prerequisites before the commencement of any passenger operations, they added.
'The safety approval for a section from Meerut (south) to Shatabdi Nagar has been received, while inspections have started for the remaining section from Shatabdi Nagar to Modipuram. Likewise, the safety inspections from New Ashok Nagar in Delhi to Sarai Kale Khan are also in the final stages. The inspections for stations of the local Metro module in Meerut are also scheduled soon,' said an officer aware of the development.
Officials said the main entry/exits at 13 non-operational stations are ready for passenger operations while the additional work will continue.
The entire RRTS project is being built at a cost of ₹ 30,274 crore. Prime Minister Narendra Modi laid its foundation in Ghaziabad on March 8, 2019.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
a day ago
- Time of India
Metro's ridership jumps to 59 lakh in July; commuters demand increase in train frequency, more feeder buses
1 2 Pune: Metro's ridership jumped to 59.58 lakh in July from June's footfall of 52.41 lakh, recording the highest monthly footfall so far since operations began in the city. With this rise of 7 lakh travellers month on month, frequent Metro users said that it is the right time to improve train frequency or add coaches to existing three-bogey trains to deal with the rush. Among the two functional routes, the Vanaz-Ramwadi stretch recorded more footfall (33.7 lakh) in July than the Swargate-PCMC corridor (25.87 lakh). You Can Also Check: Pune AQI | Weather in Pune | Bank Holidays in Pune | Public Holidays in Pune Commuters said that officegoers in the Nagar Road area, like Kharadi and Airport Road, tend to use the Vanaz-Ramwadi route. Many have switched to Metro in two months since the monsoon began, choosing it against the traffic-choked roads. This has significantly pushed up daily footfall. Tejas Shinde, who works at an IT firm in Vimannagar, has been using the Metro from Nal Stop since June. "Trains run full during evening hours, and a rise in frequency would help," he told TOI. Maha Metro at present operates trains every seven minutes during peak hours, which travellers want increased to every five minutes. Priti Iyer, a frequent commuter on the Ramwadi-Civil Court route, said it is likely that the rush will increase in the coming days. She added that Maha Metro should work on two options immediately — increasing train frequency and operating trains at a higher speed to reduce travel time. "Many commuters are also looking for upgrades in feeder bus services from various Metro stations. At the moment, feeder buses run from eight to nine stations. This can easily go up to 15 stations," Iyer said. Maha Metro officials said the rise in footfall could be for many reasons other than the monsoon impetus. According to them, daily officegoers are opting for Metro services, as are a significant number of students. Around 26,000 student cards have been issued so far by Maha Metro, under which students get discounts on every ride. For the feeder buses started on different routes by Maha Metro with PMPML, average daily footfall hit 1.92 lakh in July. There was a steady rise over the last six months, officials said. Meanwhile, ahead of Ganeshotsav, devotees and members of Ganapati mandals are pushing for an increase in train frequency for the festival. Sangram Tikhe, a Shukrawar Peth resident, said, "People will use Metro in large numbers this year as these services have been made operational at the Mandai, Kasba Peth, and Swargate stations. The existing frequency will have to go up." However, officials said Metro trains are likely to run at six-minute intervals for the festival. They added that while trials have begun to facilitate this frequency as of this month, they are looking into increasing the frequency to every five minutes at a later stage. One Metro rake sent to Patna; commuters object Maha Metro recently sent a rake from Pune for the Patna Metro. Commuters and political functionaries said this rake should have been used here to deal with increasing footfall instead of sending it away. Congress leaders expressed displeasure, calling it a political move ahead of state assembly polls in Bihar. A Maha Metro official told TOI, "A sufficient number of rakes are available here at present. An order was placed for 34 rakes, of which 33 were received. One was leased to the Patna Metro. Right now, 28 rakes are operational on two routes."


News18
4 days ago
- News18
Patna Metro Complete Guide: Know The Route, Stations, Ticket Fare And Capacity
Last Updated: PM Modi is likely to inaugurate Patna Metro's first 3-km stretch from Malahi Pakadi to Pataliputra Bus Terminal on August 15, marking a new chapter in city transport After years of anticipation, the long-awaited Patna Metro is finally set to become a reality. Prime Minister Narendra Modi is expected to inaugurate the city's first operational Metro stretch, a 3-km corridor between Malahi Pakadi and Pataliputra Bus Terminal on August 15, Independence Day. This launch marks a major milestone in Bihar's urban transport landscape. The Patna Metro will not only offer passengers a smooth, accessible, and well-organised travel experience but also help ease the city's growing traffic congestion. Trial Run Complete Metro coaches, delivered from Pune, have successfully undergone trial runs. Final safety and technical inspections are currently underway under the supervision of the Delhi Metro Rail Corporation (DMRC). Modern amenities such as automatic fare collection machines, platform screen doors, and digital displays are being installed at five key stations – Malahi Pakadi, Khemnichak, Bhootnath, Zero Mile, and New ISBT. Affordable Travel Besides reducing road congestion, the metro is expected to make a positive contribution to the city's environmental health. Capacity In its initial phase, each Metro will consist of three air-conditioned coaches, with a total capacity of around 150 passengers. Future expansions plan to increase the number of coaches to eight, significantly boosting ridership capacity. All coaches will feature modern amenities, including CCTV surveillance, Wi-Fi, charging points, and more. Stations will also offer parking and food court facilities for commuter convenience. The Metro is expected to operate daily from 5 am to 11 pm, in line with Delhi Metro's schedule. Ticketing will be enabled via QR codes and NFC technology for a seamless, tech-driven commute. view comments Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


News18
4 days ago
- News18
Mumbai Metro 2A: A Boon For Borivli Travellers Amid Western Express Highway, Link Road Traffic
Last Updated: Mumbai Metro Yellow Line: What route does Mumbai Metro-2A take? What are the stations? Is it connected to other Metros? Where to switch? How to get tickets? Mumbai Metro Line 2A: A key connector in Mumbai's smooth Metro journey has been the Line 2A from Dahisar to D N Nagar. The 18.6-km elevated corridor with 17 stations helped ease traffic congestion on one of the busiest routes (New Link Road) of Mumbai from Dahisar (E) to DN Nagar. It provides connectivity between the Western, Central Mumbai and the Northern Mumbai. Mumbai Metro Line 2A: All about the yellow line Line 2A (yellow Line) runs from Dahisar East to D.N. Nagar, stretching 18.6 km with 17 elevated stations along the heavy Link Road corridor. Phase I operations began on 2 April 2022; full service launched on January 19, 2023. Mumbai Metro-2A: What is the route? What are the stations? The 17 elevated stations are: Dahisar East, Anand Nagar, Kandarpada, Mandapeshwar, Eksar, Borivali West, Pahadi Eksar, Kandivali West, Dahanukarwadi, Valnai-Meeth Chowky, Malad West, Lower Malad, Pahadi Goregaon, Goregaon West, Oshiwara, Lower Oshiwara, Andheri West (D.N. Nagar interchange). How many trains does Mumbai Metro-2A operate? Each trainset runs with 6 coaches, capable of carrying up to 1,800-2,280 passengers. MMMOCL has deployed 22–28 rakes, currently operating around 253 services daily, each rake doing 12 trips a day. What are the timings and frequency of Mumbai Metro-2A? Service begins around 5:25–5:55 AM and runs until 10:30–10:50 PM, depending on station and direction. Peak-hour frequency: around 7-8 minutes Off-peak frequency: 10–10.5 minutes Frequency is expected to improve to 4–5 minutes once more rakes arrive. How Mumbai Metro 2A saves time? Line 2A runs along the Western Express Corridor, which is notorious for heavy traffic, especially during peak hours. Roads like Link Road, SV Road, and Western Express Highway can take 1.5 to 2 hours to travel 15–16 km in rush hour. The metro covers the same stretch in about 35–40 minutes, cutting commute time by up to 50-60%. Connected with Metro Line 1 (at D N Nagar) and Line 7 (at Gundavali). Seamless switching means travelers from Borivali, Dahisar, Kandivali, or Goregaon can reach the Andheri corridor or Western Express Highway without needing multiple auto/train changes. Connects major office and commercial hubs like D N Nagar, Goregaon West, Malad, Kandarpada, Dahisar, and is also close to SEEPZ and the Andheri business down multi-modal transfer time (e.g. auto–train–bus) common in daily suburban commuting. Most stations are within walking distance from major residential and commercial zones. A commute from Dahisar West to Andheri West: By road: 70–90 minutes in peak hours, by Metro 2A + Line 1: 30–35 minutes End-to-end ride takes roughly 35-40 minutes; combined with Line 7 to Gundavali, it takes 60 minutes How Mumbai Metro 2A helps Mumbai? In a study by IIT Bombay, 81% of riders saved 26 minutes per trip, significantly reducing commute stress. Early ridership reached over 1.1 lakh on opening week, now averaging 1.6–1.8 lakh per day combined with Line 7. It has led to 25% reduction in vehicular congestion along Link Road and Western Express Highway, plus carbon neutrality via modal shift. Is Mumbai Metro-2A connected to other Metro lines? At DN Nagar (Andheri West): Interchange with Mumbai Metro Line 1 (Blue Line) via covered connector. At Oshiwara / Lower Oshiwara: Link planned to Metro Line 6 (Pink Line) (still under construction). At Dahisar East: Terminal for both Line 2A and Line 7 (Red), letting you swap directions there. As Phase 2A of Aqualine is plying and connecting commuters to Worli, we'd like to guide you through open and functional entry/exit points.✅ Open Entry/Exit A1- Worli Police Station B1 – Glaxo Smith Kline B2 – Dr Ravindra Kulkarni Chowk Samsira B3 – Worli Fire Station B4… — MumbaiMetro3 (@MumbaiMetro3) May 12, 2025 Is switching from Mumbai Metro-2A easy? Changing from Line 2A to Line 1 at DN Nagar is straightforward via a short elevated connector. Changing between Lines 2A and 7 at Dahisar East requires switching platforms but both lines share the same station hub. How does Mumbai Metro-2A help officegoers? Major corporate hubs along Link Road, Andheri, Goregaon, Malad benefit from direct metro access. Fast, climate-controlled rides with 8-10 minute wait, making it ideal for office commuting. Streamlines connectivity across western and beyond via interchange with Blue Line and future Pink Line transfers. Why Mumbai Metro-2A is a boon for Borivli to Worli travellers? Those travelling from Borivali West can take Metro-2A and get off at Andheri West. Change over to Metro-1's DN Nagar station. Using Metro-1, travel towards Ghatkopar and get off at Marol Naka. Change over to the underground Metro-3 and head to BKC or further to Worli. How to get Mumbai Metro-2A tickets? Purchase single journey tokens or use the Mumbai 1 NCMC smart card. Mobile QR tickets available via Mumbai 1 app, and soon via WhatsApp or other official channels. Tickets can be bought via vending machines or counters at stations. Points to remember while buying tickets Token fares valid once, must be used immediately; smart card gives tap in/tap out convenience + discounts. No unified token across lines—changing from Line 2A to Line 1 or 7 needs fresh ticket or smart card tap. Limited last-mile connectivity in some areas; shared autos/buses still rolling out at many stations. MMRDA is proud to have received the Award of Excellence in Urban Transport for its work on 'Multi-Modal Integration for 30 stations of Mumbai Metro Lines 2A and 7," under the esteemed leadership of Metropolitan Commissioner, Dr. Sanjay Mukherjee, during the valedictory session of… — MMRDA (@MMRDAOfficial) October 30, 2023 What are Mumbai Metro-2A fares? Distance-based slab fares roughly: Rs 10 (0–3 km), Rs 20 (3–12 km), Rs 30 (12–18 km), Rs 40 (18–24 km), Rs 50 (24–30 km), and max Rs 60 for longest trips including combined coverage with Line 7. Smart card users may get small weekday/weekend discounts. Is Mumbai Metro-2A connected to other public transport? BEST bus services operate near major stations; premium AC shuttle launched between Gundavali Metro and BKC (fare Rs 60-90) via Chalo Bus app. Shared auto rickshaw feeder routes are being rolled out at each station (base fare Rs 10) to support last-mile movement. No direct suburban railway interchange; e.g., Borivali West Metro is not within walking distance of Borivali railway station. Will Mumbai Metro-2A be connected to upcoming / planned lines? Line 2B (DN Nagar-Mandale/Mankhurd) is under development and will extend connectivity eastward. top videos View all Line 6 (Pink) at Oshiwara interchanges in future, improving east–west transfer. Expansion of Line 9, Lines 10/13, etc., will intersect at Dahisar East through Line 7 hub—enhancing wider connectivity across MMR. About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Maha Mumbai Metro Operation Corporation Ltd Mumbai metro mumbai metro line mumbai metro Line 2A Mumbai Metro Rail Corporation news18 specials view comments Location : Mumbai, India, India First Published: July 29, 2025, 17:00 IST News cities » mumbai-news Mumbai Metro 2A: A Boon For Borivli Travellers Amid Western Express Highway, Link Road Traffic Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.