
Government stresses continued payment of foreign oil partners' dues
At the start of the meeting, the Prime Minister highlighted the importance of ongoing efforts by the relevant ministries to secure and increase petroleum supplies. He emphasized the need to ensure uninterrupted operation of power plants—particularly during the summer months—and to expand the share of renewable energy in Egypt's energy mix to improve efficiency and reduce generation costs.
Minister Esmat outlined the electricity and renewable energy sector's solid infrastructure and detailed efforts to enhance energy efficiency, enforce fuel quality standards, and implement regular maintenance programs at power plants.
He also noted the sector's ongoing expansion of renewable energy production and its integration into the national grid. Improving energy efficiency and reducing electricity consumption remain priorities, pursued through coordination with ministries, government entities, and partnerships with local and international private sector players.
Esmat added that 2,000 megawatts of renewable energy capacity were added to the unified national grid ahead of the current summer season. He underscored the importance of continuous monitoring of the grid to ensure stable and high-quality electricity supply, along with strict adherence to global standards in maintenance and operational procedures.
Efforts are also underway to reduce technical losses and lower fuel consumption, with maintenance programs being implemented on precise schedules set by the grid operator to achieve optimal operational efficiency.
Minister of Petroleum and Mineral Resources Karim Badawi reviewed the status of petroleum supply and detailed measures to maintain steady fuel availability for power plants. He confirmed that floating storage regasification units (FSRUs) continue to receive liquefied natural gas shipments, which are then regasified and fed into the national gas grid to meet local demand.
Badawi emphasized ongoing coordination with the Ministry of Electricity and Renewable Energy within a unified strategy to secure fuel supply and maintain grid stability. Joint working committees, he noted, regularly assess and plan for the required fuel needs of power generation plants.
He further outlined the petroleum sector's role in ensuring the delivery of gas and fuel oil as requested by the electricity sector, stressing that this coordination takes place continuously, supported by proactive plans to manage fuel needs during peak summer demand.
The meeting also reviewed progress on payments to foreign oil partners. The government reaffirmed its commitment to meeting these obligations regularly—a move expected to boost confidence among international investors and encourage additional investment in exploration, drilling, and production.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Al-Ahram Weekly
an hour ago
- Al-Ahram Weekly
Emirati Dana Gas launches $100 mln investment programme to boost Egypt gas production - Energy
UAE's Dana Gas, the Middle East's largest regional private sector natural gas company, has launched a $100 million investment programme in Egypt's onshore Nile Delta to expand domestic gas production, increase reserves, and support the country's growing energy demand, according to a statement the company shared with Ahram Online. The two-year programme includes drilling 11 appraisal and exploration wells, as well as recompleting existing ones. It is expected to add approximately 80 billion cubic feet (bcf) of recoverable gas reserves and significantly enhance the company's long-term production profile in Egypt. The investment plan has already yielded early success, with the completion of the Begonia-2 appraisal well in the New El-Manzala concession. Begonia-2, operated by the company's joint venture with the Egyptian government, Wastani Petroleum Company (WASCO), has confirmed initial reserves of 9 bcf of gas and is set to deliver 5 million standard cubic feet daily (mmscfd) in additional output. It is the first well to be drilled under the programme, signalling the start of intensified exploration and development activity in the area. In parallel, Dana Gas has initiated recompletion work on the Balsam-3 well, redeploying the EGYPTCO rig to tap previously unproduced geological layers. Once completed, the well is expected to add 4 billion cubic feet (bcf) in reserves and an additional 3 million standard cubic feet per day (mmscfd) in production. Its recompletion is anticipated to mitigate exploration risks and further strengthen gas output from existing assets. 'This $100 million programme marks a strategic milestone for Dana Gas in Egypt. The drilling success at Begonia-2 and the start of work on Balsam-3 are just the beginning. With improved fiscal terms under our new concession consolidation agreement with EGAS, we are now well-positioned to unlock more value from our Egyptian portfolio,' said CEO of Dana Gas Richard Hall. 'Our continued investment reflects our long-standing commitment to Egypt and to supporting its energy security agenda. Timely and consistent payments from our partners remain critical to the success of this programme and to ensuring its sustained momentum,' he added. Drilling is being carried out using the EDC-54 rig, with the following well scheduled to spud in August. The company also plans to re-enter other wells during the programme's timeframe to maximize recovery from existing assets. Earlier in July, Minister of Petroleum and Mineral Resources Karim Badawi visited the Begonia-2 site to observe the commencement of operations and review project progress. His visit aligns with the government's broader strategy to enhance natural gas production through upstream investment incentives and regional collaboration. Dana Gas has operated in Egypt for over a decade and remains one of the country's key private sector contributors to gas production. The company's total proven and probable (2P) reserves exceed one billion barrels of oil equivalent (BOE), with an average daily production of 55,000 BOE in 2024. Its regional presence spans Egypt, the Kurdistan Region of Iraq (KRI), and the UAE. As Egypt continues to navigate growing energy demands amid fluctuating domestic gas production, the government is intensifying efforts to reinforce its energy security through a combination of infrastructure upgrades and fiscal commitments. Last week during a press conference, Prime Minister Mostafa Madbouly announced the full integration of all Floating Storage Regasification Units (FSRUs) into the national gas network. Currently, three FSRUs are stationed in Ain Sokhna, positioned to serve as emergency backups in the event of disruptions to the country's conventional gas supply. While the units have not yet been activated at full capacity, Madbouly emphasized their role as a strategic reserve to ensure uninterrupted access to natural gas, particularly during peak summer consumption periods. Furthermore, two more FSRUs are expected to arrive soon: one set to be deployed at Alexandria Port and the other at Jordan's Aqaba Port. These deployments are part of Egypt's broader contingency plan to secure its energy system against potential shortfalls during high-demand months. The government is also making headway in addressing long-standing financial liabilities in the energy sector. In this respect, Madbouly said Egypt has recently repaid more than $1 billion in overdue payments to foreign oil and gas partners. While acknowledging that a significant backlog remains, he reaffirmed Egypt's renewed commitment to settling monthly invoices regularly, thereby gradually reducing its accumulated energy debt. By the end of 2025, an additional $1.4 billion in payments is scheduled to be made, as part of a strategy to restore investor confidence and support future investment in the country's energy production. Follow us on: Facebook Instagram Whatsapp Short link:


Daily News Egypt
17 hours ago
- Daily News Egypt
Al-Sisi urges accelerated oil, gas discoveries, lower import bill
Egyptian President Abdel Fattah Al-Sisi met on Tuesday with Prime Minister Mostafa Madbouly and Minister of Petroleum and Mineral Resources Karim Badawi to review recent developments in the petroleum and mining sectors, the presidency announced in a statement. Presidential spokesperson Mohamed El-Shennawy said the minister presented the ministry's current strategy, which focuses on boosting exploration and production, maximising value through refining and petrochemical industries, and launching a new phase in mining to deepen its economic contribution. The meeting reviewed government efforts to secure domestic energy needs, particularly for the electricity sector, alongside updates on exploration activities and newly added reserves. The minister reported significant achievements between July 2024 and June 2025, including a rise in domestic oil and gas output and successful measures to curb the natural decline in gas production. Discussions also addressed steps to reduce outstanding payments to foreign partners and the ministry's ongoing commitment to settle monthly dues, aimed at fostering greater investment and accelerating project timelines. Participants reviewed key infrastructure developments, notably the expansion of floating regasification unit capacity from 1,000 to 2,250 million cubic feet per day—strengthening supply security and emergency preparedness. The meeting also discussed cooperation with Cyprus to diversify gas imports and advance Egypt's vision to become a regional gas trading hub. On the mining front, officials outlined plans to transform the Mineral Resources Authority into a commercially active entity, sign agreements with leading international companies, and establish value-added industries driven by national investment. President Al-Sisi underscored the importance of sustaining an attractive investment environment, bolstering domestic oil and gas production to support national development, reduce the import bill, and ease pressures on citizens. He called for accelerating the connection of new discoveries to production, expanding exploration programmes, and offering additional incentives to spur growth in the petroleum and mineral resources sectors.


Daily News Egypt
2 days ago
- Daily News Egypt
Government efforts continue to secure gas supplies for power, industry during summer
Minister of Petroleum and Mineral Resources Karim Badawi has affirmed that the ministry is pressing ahead with its strategy to sustainably provide natural gas to meet domestic market needs — particularly for the electricity and industrial sectors — amid rising power loads during the summer months and increased fuel consumption driven by high temperatures. His remarks came during a visit to the main control centre of the national natural gas grid, the National Advanced Transmission and Automation Centre (NATA), operated by the Egyptian Natural Gas Company (GASCO) in New Cairo, where he reviewed the operational status of gas pumping across the national grid. Badawi also checked the efficiency of operations and gas flow from local production sources as well as through the three regasification vessels currently stationed at the SUMED and Sonker terminals in Ain Sokhna. The Minister noted the successful securing of fuel and gas for the power sector during the recent heatwave, attributing it to the ministry's proactive contingency plans and emergency response strategies. He stressed the importance of ongoing coordination between the Ministry of Petroleum and Mineral Resources and the Ministry of Electricity and Renewable Energy, supported by joint teams working around the clock to assess the sector's evolving gas requirements and ensure timely LNG imports. Badawi concluded by emphasising that the state remains committed to sustaining local fuel and gas supplies to maintain energy system stability, in line with broader economic development objectives.