logo
Two years on, Rs 21 crore redevelopment of Thanjavur junction on the slow track

Two years on, Rs 21 crore redevelopment of Thanjavur junction on the slow track

THANJAVUR: Two years on, the redevelopment of Thanjavur railway junction under the Amrit Bharat Station Scheme (ABSS) is yet to be completed, causing inconvenience to passengers due to the ongoing construction works. The foundation stone was laid on August 6, 2023 for the redevelopment of the station at a cost of Rs 21.17 crore.
The redevelopment envisaged providing shelters to cover entire platforms, an arrival building, renovation of the existing terminal building, construction of a new parcel building and laying a road on the front side of the station with a parking facility and pedestrian walkway.
Initially, the construction was supposed to be completed within 18 months. However, even after 24 months, only a few works have been completed. Out of the completed works are the new parcel office building and the existing terminal building, which has been renovated.
Most of the remaining works are incomplete. M Gnanam, a passenger said, 'There has been water stagnation in the existing renovated terminal following rains on Tuesday night. One has to wade through ankle- deep water to access the ticket counters and to enter or exit the station.'
On Wednesday when TNIE visited the station, the work of resurfacing the first platform was under way. The work on the arrival terminal is yet to be completed. All five platforms don't have fully covered shelters.
The entrance arch is under construction with scaffolding still in place, and the buses could not move into the station premises. Railway sources said the contractor delayed the commencement of the works, and now the works are in full swing. 'We expect all the works will be completed by October 2025', officials of Tiruchy Division of Southern Railway told TNIE.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Commuters express frustration as Pune shivneri bus takes longer than shared cab
Commuters express frustration as Pune shivneri bus takes longer than shared cab

Time of India

timean hour ago

  • Time of India

Commuters express frustration as Pune shivneri bus takes longer than shared cab

Mumbai: Travelling by the Mumbai-Pune Shivneri may not be a pleasant and comfortable experience. Recently, passengers were left fuming as the journey was delayed by over two hours to travel from Mumbai to Pune on this popular intercity AC bus. "It is a complete waste of time. A shared cab would have cost Rs 400 but reached in three hours. Instead, I was sitting inside the bus, which halted at many stops en route, and the wait time was longer as well. It reached Pune in five and a half hours," recalled a passenger who boarded the bus from Dadar. "Why are there too many stops in Mumbai before the bus hits the Expressway? And then, a 20-minute scheduled halt on the Expressway?" he said. A passenger said that the bus is also not good compared to the Rs 590 fare one pays for the journey. "Imagine there is a road with no traffic jams, and the bus still prefers to halt for a long duration in Mumbai after leaving Dadar depot. It's frustrating," the passenger recalled. Sources said that the bus keeps waiting for passengers en route if seats continue to remain vacant after leaving Dadar depot. When contacted, an MSRTC official said that the matter will be looked into. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like No annual fees for life UnionBank Credit Card Apply Now Undo The official further said that if one booked a Pune bus via Atal Setu, there were no issues or complaints. "We have found that buses using the route through Vashi bridge-Nerul-Kharghar are facing this problem of unwarranted stoppages en route," he said. The MSRTC wants to deploy more buses on the Atal Setu to expedite journeys for passengers in the near future. You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai Passengers have also complained of rash driving by some of the drivers on the Expressway and other roads. It may be recalled that a few months ago, 12 passengers of a Mumbai-Pune Shivneri bus escaped unharmed in a mishap in which the bus climbed on the road divider in Sion. The e-Shivneri bus started from the Dadar bus stand around 5.30 am, and when it was crossing the flyover near Sion police station, the bus swerved a bit and jumped on the divider. While the exact cause is not known, officials said that the driver was not drunk nor "half asleep" when the incident occurred, an MSRTC official claimed after the incident. The driver was, however, taken off duty for 10 days. Passengers have also complained in the past about a few cases of drivers speaking on mobile phones. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.

103% rise in booking e-tickets in Khurda Road rly division in 1st quarter: Data
103% rise in booking e-tickets in Khurda Road rly division in 1st quarter: Data

Time of India

time2 hours ago

  • Time of India

103% rise in booking e-tickets in Khurda Road rly division in 1st quarter: Data

Bhubaneswar: Use of paperless general and platform tickets through the unreserved ticketing system (UTS) on the mobile platform has seen a 103% rise in the first quarter of 2025-26 compared to the similar period in 2024-25, according to latest data released by the Khurda Road railway division. The railway division oversees major stations like Bhubaneswar, Puri, Cuttack, Khurda and Berhampur. From April to June, the division issued 1.83 lakh paperless general and platform tickets, compared to 90,005 tickets issued in the first quarter of 2024-25. "Because of the rise in booking paperless tickets, stations are now witnessing a reduction in queues for unreserved tickets at booking counters," said an official. During 2024-25, the division issued 5.35 lakh paperless general and platform tickets through the UTS on mobile, serving over 22.41 lakh passengers and generating a revenue of Rs 4.76 crore. In 2023-24, it issued 2.56 lakh tickets for 14.81 lakh passengers, generating Rs 2.82 crore in revenue. In 2022-23, around 1.27 lakh tickets were issued for 8.95 lakh passengers, generating Rs 1.53 crore. "This year-on-year growth shows that people want hassle-free services without standing in queues for platform or general tickets. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Use an AI Writing Tool That Actually Understands Your Voice Grammarly Install Now Undo This exponential growth is attributed to wider public acceptance, user-friendly technology and enhanced payment options such as UPI-based QR code transactions, leading to shorter queues and faster processing," read an official statement. The statement said passengers can now book journey, season and platform tickets directly from their smartphones, leveraging the UTS on mobile platform, eliminating the need for ticket printouts. "The app is available in Hindi, English, and regional languages, ensuring ease of use even for first-time users. Tickets are delivered directly to the app and can be shown to ticket-checking staff using the 'show ticket' option — no hard copy needed," an official source said. An official said passengers can now book unreserved tickets up to three days in advance for journeys above 200km and purchase half-yearly and yearly season tickets, apart from platform tickets, with ease. "The app supports multiple digital payment methods and is compatible with Android, iOS and Windows smartphones," the official added. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.

75L avail free bus travel facility
75L avail free bus travel facility

Time of India

time2 hours ago

  • Time of India

75L avail free bus travel facility

1 2 Lucknow: Chief Minister Yogi Adityanath's initiative to provide free bus travel for women during Rakshabandhan festival shattered previous records as an estimated 75 lakh passengers avail of the service by midnight on Sunday. According to UPSRTC officials, the initiative saw an overwhelming response, with up to 70% of the passengers benefiting from the free travel offer. UPSRTC managing director Masoom Ali Sarwar said that on normal days, the corporation's buses accommodated 14 to 15 lakh passengers daily. However, during the first two days of the festival, the numbers soared past 5 million, with women passengers making up a significant portion. "On Aug 8, the first day of the scheme, over 19.5 lakh people travelled, marking a 25% increase from regular days. The numbers peaked on Rakshabandhan day, registering a staggering 210% rise," an official said, the total stood at 75 lakh. Additional buses were deployed and all staff were on duty to ensure smooth operations. An incentive scheme was also introduced for drivers and conductors, offering Rs 1,200 for completing 1800 km and an additional Rs 0.55 per km for continuous six-day operations. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store