
Nanta: Bukit Song viaduct project set for earlier completion next month
KUCHING (Aug 18): The construction of the 300-metre Bukit Song viaduct under Work Package Contract (WPC) 11 of the Pan Borneo Highway (PBH) Sarawak project is expected to be completed earlier than scheduled, said Dato Sri Alexander Nanta Linggi.
The Works Minister said the viaduct, originally scheduled for completion in October, is now targeted to be ready by next month.
'I am very excited and pleased with the progress of the Bukit Song viaduct construction, which is expected to be completed ahead of schedule.
'Once ready, it will mark the full completion of the highway in its entirety for all PBH users in Sarawak,' he said in a post on Facebook.
Nanta, who is Kapit MP, had earlier visited the project site where he was briefed on the construction of the Bukit Song viaduct.
He explained that the viaduct had to be constructed as the area was unsuitable for embankment works due to soil movement.
'This had caused some delays to the overall construction of PBH Sarawak,' he said, adding that WPC 11 is the final package of the 11 work packages under the PBH Sarawak project.
During his visit, Nanta also inspected the 4.2km road upgrading works and the replacement of old Laku water pipes (now under Sarawak Water Sdn Bhd) in the area.
He said the pipe replacement works were necessary following previous pipe bursts before construction began.
'Although there was some delay, these additional works are crucial to ensure that water supply in Miri city will not be affected and that new roads that will be built later will not be at risk of damage in the future,' he said.
Nanta also called on the Ministry of Works, through the Public Works Department (JKR) Sarawak, to ensure that there is continuous engagement between the project teams and contractors, as well as to regularly carry out strict monitoring to ensure smooth progress and timely delivery of the project. alexander nanta linggi Bukit Song lead Pan Borneo Highway Sarawak viaduct
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Barnama
5 hours ago
- Barnama
பொறியியலாளர்கள் பற்றாக்குறையை மலேசியா எதிர்கொண்டுள்ளது
Works Minister Datuk Seri Alexander Nanta Linggi (center) during the launch of the National Engineering Convention (NEC) 2025 at the Connexion Conference and Event Centre, Bangsar South today. Also present were President Board Engineers Malaysia Datuk Rosaln Ismail (left) and Board of Engineers Malaysia (BEM) Member Fam Yew Hin (right).


Borneo Post
5 hours ago
- Borneo Post
Student Integration Plan for Unity key to fostering unity in S'wak schools, says Dr Rundi
Dr Rundi speaks during the programme at SK Batu Tellingai. – Ukas photo BINTULU (Aug 20): The implementation of the Student Integration Plan for Unity (Rimup) in primary schools across Sarawak is a vital step towards fostering unity, harmony, and cooperation among pupils of different racial and cultural backgrounds, said Dato Sri Dr Stephen Rundi Utom. The State Minister of Food Industry, Commodity and Regional Development said such initiatives not only strengthen relationships between students, teachers, and the local community but also help nurture a quality generation capable of driving the state's progress. 'We must work together, and we need strong unity. Parents also play an important role in ensuring their children are well-educated, not only in academics but also in discipline and character,' Dr Rundi when officiating the Harmony Inspiration with Leaders programme at SK Batu Tellingai, Suai, on Tuesday. According to a Sarawak Public Communications Unit (Ukas) report, the Kemena assemblyman stressed that human capital development must remain the foundation of progress, adding that quality education and character building are essential to ensure society can keep pace with rapid national development. Reflecting on SK Batu Tellingai's transformation over his five terms as assemblyman, he credited the close cooperation between parents, the school, and pupils as the driving force behind its continuous success. 'Achieving success is not difficult, but sustaining it is not easy,' he said. Dr Rundi also highlighted a Gabungan Parti Sarawak (GPS) initiative which will provide free tertiary education at Sarawak-owned universities beginning next year, particularly benefitting students pursuing technical and STEM-related fields with high employability. He further urged parents to remain vigilant of their children's school participation and to keep them away from negative social influences. 'I hope Parents-Teachers Association (PTA) and parents will continue supporting schools to ensure our children succeed and become valuable assets to the state in the future,' he added. Also present were Bintulu Resident Datu Nyurak Keti, Sebauh District officer Thadeus Ling Bartholomew Allu, SK Batu Tellingai headmaster Bakir Jatan, and PTA chairman Tuai Rumah Bakom Ligong. RIMUP Stephen Rundi Student Integration Plan for Unity


New Straits Times
9 hours ago
- New Straits Times
Malaysia needs 100,000 more engineers
KUALA LUMPUR: Malaysia is currently facing a shortage of about 100,000 engineers to meet the country's development needs, says Works Minister Datuk Seri Alexander Nanta Linggi. He said the current number of registered engineers had yet to achieve the ideal ratio of one engineer for every 100 Malaysians. "At present, we have only 200,000 registered engineers, and we still need about 100,000 more to meet demand," he said after officiating the 2025 National Engineering Convention (NEC 2025) here today. Nanta said that efforts to address this shortage were already underway, particularly through the enhancement of Technical and Vocational Education and Training (TVET) programmes. "I welcome the announcement by Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi to expand TVET programmes, with a target of 60,000 participants. We are confident this initiative will help us meet the 100,000 engineer target soon," he said. He also stressed the importance of retaining engineering graduates within the field, noting the challenge of attracting them to other sectors due to higher starting salaries. "We do not want engineering graduates to switch careers. The government is exploring ways to ensure they remain motivated and committed to pursuing engineering careers," Nanta said. The ministry is examining strategies to make the engineering profession more appealing, including creating an environment that offers better job prospects for graduates. On the recent motorcycle accident on Persiaran Mokhtar Dahari here, Nanta said that the incident occurred in an area under the responsibility of the state government and its appointed concessionaire. "If the accident was caused by road damage, I urge the concessionaire to take swift action to prevent similar incidents in the future," he said. A report by Infrasel Sdn Bhd and the Selangor Public Works Department (JKR) indicated that the accident took place near a housing project, where road conditions had become sandy.