logo
Juniper Green Energy turns public in run-up to IPO

Juniper Green Energy turns public in run-up to IPO

Time of India28-05-2025

In preparation for its initial public offering (
IPO
), renewable power producer
Juniper Green Energy
has transitioned from a private entity into a public company. The entity has been renamed from Juniper Green Energy Pvt Ltd to Juniper Green Energy Ltd, data with the Ministry of Corporate Affairs showed.
The move has paved the way for the filing of draft IPO documents with markets regulator
Sebi
.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
When the Camera Clicked at the Worst Possible Time
Lintmit.com
Read More
Undo
Market sources said that the Delhi-based company is expected to soon file its IPO papers with Securities and Exchange Board of India (Sebi).
Juniper Green Energy is an independent
renewable energy
power producer in India, focused on the development, construction and operations of
utility-scale solar
, wind, and hybrid renewable energy projects. The company has grown its operational capacity to 1.1 GWp.
Juniper Green Energy is part of AT Capital Group, a globally diversified investment group with a focus on sectors such as renewable energy, real estate, private and structured credit, and public markets.
Live Events
Earlier this month, Juniper Green Energy appointed Ankush Malik as its Chief Executive Officer, who has more than 15 years of experience in the power sector.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

RTI revelation exposes massive over-allocation of Hidkal dam water to industries
RTI revelation exposes massive over-allocation of Hidkal dam water to industries

Time of India

time18 minutes ago

  • Time of India

RTI revelation exposes massive over-allocation of Hidkal dam water to industries

Belagavi: In a significant development that could intensify the ongoing opposition to the diversion of Hidkal Dam water to industries in Hubballi-Dharwad, activist and whistleblower Sujit Mulgund unveiled official documents revealing that industrial units received nearly 22 times more water than the original allocation. Mulgund shared a letter from the assistant executive engineer of the Karnataka Niravari Nigam Limited (KNNL), CBC subdivision No. 2, dated July 6, 2024. The letter, addressed to the executive engineer, discloses that only 0.1 tmcft of water was initially allocated to industries under the project report. However, the allocation surged to 0.2 tmcft gradually, and there is an additional fresh demand of 0.5 tmcft under the Bengaluru-Mumbai Industrial Corridor Project, part of the Suvarna Karnataka Corridor initiative. Crucially, the letter indicates that the excess allocation already far surpassed the sanctioned limit. If the additional 0.5 tmcft is approved, it would come at the cost of irrigation water meant for farmers, a point likely to fuel further unrest among farming communities. Last month, the Karnataka govt approved the controversial diversion of 0.5 tmcft from Hidkal Dam to industrial areas in Hubballi-Dharwad, sparking widespread protests across Belagavi and neighbouring districts. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Free P2,000 GCash eGift UnionBank Credit Card Apply Now Undo Farmers and civil society groups decried the move, arguing it threatens their livelihood and violates the dam's original purpose. Earlier, water resources minister MB Patil claimed that the water being diverted was within the allocated limits. However, Mulgund's findings—obtained through the Right to Information (RTI) Act—contradict the minister's statement. Pipeline construction for the water diversion began over four months ago—without formal approval, tenders, or even informing the local administration, including district minister Satish Jarkiholi. The work only came to light when local farmers discovered pipelines being laid across their fields. In response, several organisations launched protests under the slogan 'Namma Neeru, Namma Hakku', prompting the Belagavi DC to halt the work temporarily. Despite the opposition, the project resumed following a green signal from the state cabinet. Activist Mulgund sought further details under RTI—including the tender cost, official approvals, and progress reports—but KNNL denied the information, citing confidentiality. Constructed in 1961 and named after former prime minister Lal Bahadur Shastri, the Hidkal dam was built to provide irrigation and drinking water. Though it has a storage capacity of 51 tmcft, effective availability is only around 44 tmcft due to siltation and unusable reserves. Speaking to the TOI, Mulgund criticised the lack of transparency. "The RTI documents clearly prove that more water has already been diverted to industries than originally sanctioned. Any additional diversion will directly impact farmers in Belagavi, Bagalkot and Vijayapura," he said.

Chandigarh tops India in school education report
Chandigarh tops India in school education report

Time of India

time18 minutes ago

  • Time of India

Chandigarh tops India in school education report

Chandigarh: Chandigarh has secured the top position in the Government of India's Performance Grading Index (PGI) 2.0, an annual assessment of school education systems across states and union territories, for two consecutive years — 2022-23 and 2023-24 — emerging as the only state or UT to reach the Prachesta-1 grade in either year. No other region crossed into even the next higher grade band, making Chandigarh's lead both significant and solitary. Its overall score improved from 688 in 2022–23 to 703 in 2023–24, driven by gains in infrastructure, access, and governance. However, the data also reveals specific areas where Chandigarh did not lead the country, particularly in governance processes, teacher education, and learning outcomes—domains where other states and UTs outperformed it. In governance processes, it scored 76.7 out of 130, remaining in the Prachesta-1 band. In comparison, Gujarat scored 87.8, while Odisha and Haryana also performed better in this domain. These governance indicators include digital fund transfers, student and teacher attendance systems, and timely data reporting—areas where Chandigarh still has room to strengthen implementation. Similarly, in the teacher education and training domain, Chandigarh scored 85.7 out of 100, placing it in the Utkarsh category. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Godrej Majesty | Luxurious 3 & 4 BHK Homes at ₹2.39 Cr* Godrej Majesty Learn More Undo However, Kerala, with a score of 91.4, became the only state or UT to achieve the topmost Daksh grade in this domain. This suggests scope for further enhancement in teacher qualification standards and in-service training in Chandigarh. Even in access, where Chandigarh had previously achieved the Daksh grade (2022–23), its score marginally declined from 72.9 to 72.4 in 2023–24, falling into the Utkarsh range. By contrast, Puducherry retained the Daksh grade in access this year. Nonetheless, Chandigarh's overall leadership reflects robust progress across most domains. It scored 148.0 out of 190 in Infrastructure & Facilities and 216.5 out of 260 in Equity, placing it in the Atti-Uttam and Utkarsh grades respectively. This success builds on several initiatives: 100% retention at all levels, 450 co-located Anganwadi centres, expanded vocational training, kitchen gardens in all government schools, and the installation of sanitary pad vending machines in previously uncovered institutions. The UT also leads in digital readiness, having implemented digital attendance in all government schools and seeded over 98% of student records with Aadhaar in the UDISE+ system. Social audits were introduced under the PM POSHAN scheme in 2023–24, and all children with special needs (CWSN) were provided with assistive devices. Importantly, Chandigarh maintained a consistent score of 103.6 in Learning Outcomes for three consecutive years, though no state or UT showed improvement here due to the reliance on NAS 2021 data. While the PGI 2.0 results are not directly comparable to earlier PGI formats, Chandigarh has ranked first nationally for three years in a row under the updated methodology. The next round may bring further movement, as results from the 2024 PARAKH national assessment—expected in July 2025—will inform updates in the Learning Outcomes and Equity domains. PGI 2.0 continues to serve as a powerful tool for states and UTs to monitor school education quality, push reforms, and work toward the goals set by the National Education Policy 2020 and Sustainable Development Goal 4. BOX-Domain-wise scores Learning outcomes (out of 240) 2022–23: 103.6 2023–24: 103.6 Access (out of 80) 2022–23: 72.9 2023–24: 72.4 Infrastructure and Facilities (out of 190) 2022–23: 136.5 2023–24: 148.0 Equity (out of 260) 2022–23: 216.4 2023–24: 216.5 Governance Processes (out of 130) 2022–23: 74.0 2023–24: 76.7 Teacher Education and Training (out of 100) 2022–23: 84.3 2023–24: 85.7 Total Score (out of 1000) 2022–23: 688 2023–24: 703 Overall Grade 2022–23: Prachesta-2 2023–24: Prachesta-1 BOX- What Chandigarh did well 100% retention at all school levels Three-year pre-primary cycle introduced in all government schools Digital attendance implemented in all government schools 450 Anganwadis co-located with schools Vocational education expanded from 38 to 47 government schools Kitchen gardens started in all government schools Over 98% students Aadhaar-seeded in UDISE+ Social audits conducted under PM POSHAN scheme Assistive devices provided to all CWSN (Children with special needs) students BOX- Where others outperformed Governance Processes: Chandigarh scored 76.7 out of 130 (Prachesta-1), while Gujarat scored 87.8, outperforming it in digital systems and fund disbursals. Teacher Education and Training: Chandigarh scored 85.7 (Utkarsh), but Kerala crossed into the Daksh category with 91.4, indicating stronger professional development standards. Access: Chandigarh slipped slightly from Daksh to Utkarsh (72.4 out of 80). Puducherry retained Daksh, reflecting stronger gains in enrolment and early learning participation. No domain-level top grade: Chandigarh did not achieve Daksh (top grade) in any individual domain, while Kerala and Delhi each did so in one.

CM Orders Gadchiroli Airport Survey, Pushes For Timely Land Acquisition
CM Orders Gadchiroli Airport Survey, Pushes For Timely Land Acquisition

Time of India

time23 minutes ago

  • Time of India

CM Orders Gadchiroli Airport Survey, Pushes For Timely Land Acquisition

Nagpur: Chief minister Devendra Fadnavis on Thursday ordered an immediate obstacle limitation surface (OLS) survey for the proposed Gadchiroli airport, directing the district collector to submit a detailed proposal. The instruction came during a high-level review meeting on land acquisition for major infrastructure projects, held in Mumbai. Fadnavis further instructed the runway at Akola Airport to be extended to 2,400m apart from envisioning a modern, large-scale terminal for the city. He emphasised the need for comprehensive planning for air connectivity in Kolhapur, Karad, Akola, Gadchiroli, and Chhatrapati Sambhajinagar. Stressing the need for strict adherence to timelines, Fadnavis said, "No project should stall due to land acquisition delays. All agencies must work in mission mode with quality and structured coordination." He cautioned that delays lead to steep cost escalations and insisted that each agency follow the pre-defined schedule meticulously. Fadnavis also reviewed the progress of multiple critical projects, including the Nagpur-Gondia, Nagpur-Chandrapur, and Bhandara-Gadchiroli expressways, directing officials to finalise their alignment using the Gati Shakti portal to ensure minimal forest land diversion. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 2 & 3 BHK Homes Near Padur, OMR Starting @ ₹72.50 Lakh* TVS Emerald Undo For the Wardha-Gadchiroli and Wardha-Nanded railway lines, the CM set a 15-day deadline to complete land acquisition. Fadnavis further instructed that the Virar-Alibaug corridor's Morbe-Karanja section, which passes through mangrove and forest zones, should begin its approval processes immediately, and that administrative clearances should proceed simultaneously to save time. He also asked the finance department to allocate Rs12,000 crore for land acquisition of the Shaktipeeth Expressway. Other directives included submission of a proposal to integrate the Wadhwan-Igatpuri expressway under the Sagarmala scheme, and completion of the Selu land acquisition in Parbhani district for the Jalna-Nanded expressway within 15 days. The CM also called for provision of Rs53,354 crore for land acquisition related to 11 major infrastructure projects across the state. Top bureaucrats present included Revenue ACS Rajesh Kumar, PWD ACS Manisha Mhaiskar, Forest ACS Milind Mhaiskar, Transport and Ports ACS Sanjay Sethi, Finance ACS OP Gupta, Urban Development ACS Aseemkumar Gupta, and MSRDC MD Anil Gaikwad.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store