logo
2025 Suzuki GSX-8R launched in India at Rs 9.25 lakh: What's new

2025 Suzuki GSX-8R launched in India at Rs 9.25 lakh: What's new

Time of India2 days ago

Suzuki Motorcycle India has launched the new Suzuki GSX-8R in the Indian market. The fully faired
middleweight sports tourer
is now OBD2B compliant, and there are no changes in terms of pricing, components, or equipment. The bike continues to be priced at Rs 9.25 lakh (ex-showroom), and Interested customers can book the bike online or by visiting their nearest dealership. Deliveries are expected to begin soon.
Talking about the engine, the bike is powered by a 776cc, twin-cylinder,
liquid-cooled petrol engine
with a 270-degree crank that puts out 81.8bhp of power at 8,500rpm and 78Nm of torque at 6,800rpm. It gets a six-speed gearbox with a bi-directional quick-shifter. Features-wise, it comes with LED headlights and taillights, an LCD digital cluster, three levels of traction control, three ride modes, ABS, and more.
The GSX-8R is based on a steel chassis paired with Showa suspension components, including an upside-down front fork and a rear monoshock. Braking duties are taken care by 310 mm twin discs up front and a 240 mm single disc at the rear. It runs on 17-inch alloy wheels wrapped in Dunlop RoadSport 2 radial tyres. The bike also continues to be offered in three colour options - Metallic Triton Blue, Metallic Matte Sword Silver, and Metallic Matte Black.
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Buy Brass Idols - Handmade Brass Statues for Home & Gifting
Luxeartisanship
Buy Now
Undo
Defender's most Towering version: India plans, electric Defender and more | TOI Auto
Design-wise, the Suzuki GSX-8R integrates aggressive supersport styling with functional sport-touring features, positioning itself as a versatile middleweight motorcycle. At front, it has a twin-pod LED headlamp is mounted within a sculpted fairing that aligns smoothly with the fuel tank, forming an aerodynamic silhouette. Sharp bodywork, raised clip-on handlebars, and clean lines contribute to a modern yet practical design, suggesting both performance and everyday usability.
Discover everything about the
automotive
world at
Times of India
.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Financial sector regulators to work on universal KYC
Financial sector regulators to work on universal KYC

Economic Times

time24 minutes ago

  • Economic Times

Financial sector regulators to work on universal KYC

Financial sector regulators, led by the RBI, are developing a universal KYC framework with the CKYCR to streamline verification processes. Nirmala Sitharaman urged regulators to ensure seamless KYC experiences for citizens and expedite refunds of unclaimed amounts through district-level camps. The FSDC also discussed strengthening cybersecurity and implementing budget announcements related to KYC simplification for NRIs, PIOs, and OCIs. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads New Delhi: Financial sector regulators, including the Reserve Bank of India , will look at a universal know your customer (KYC) framework and develop systems with the Central Know Your Customer Registry (CKYCR) to promote the inter-usability of records and avoid multiple minister Nirmala Sitharaman in a meeting of the Financial Stability and Development Council (FSDC) in Mumbai on Tuesday urged the financial sector regulators to take proactive steps to ensure that citizens have a seamless experience with the KYC processes across the financial a statement, the finance ministry said the FSDC also considered strengthening the cyber resilience framework of the Indian financial sector through a financial sector-specific cybersecurity FSDC also discussed issues relating to formulating a strategy for implementing the past decisions and the budget announcements, which included prescribing common KYC norms, simplification and digitalisation of the KYC process, including digital onboarding for non-resident Indians (NRIs), PIOs and OCIs in the Indian securities FSDC has representation from the Reserve Bank of India (RBI), the Insurance Regulatory and Development Authority of India (Irdai), the Securities and Exchange Board of India (Sebi), the Pension Fund Regulatory and Development Authority (PFRDA) and officials from the finance and corporate affairs urged the regulators and departments to expedite the process of refund to rightful owners of unclaimed amounts by holding special district-level also emphasised that interest of common citizens be kept in mind and therefore expeditiously refund the claims of the rightful claimants, the statement unclaimed amounts comprise deposits in banks, unclaimed shares and dividends managed by IEPFA and unclaimed insurance and pension funds with Irdai and PFRDA, drive is to be conducted in coordination with RBI, Sebi, MCA, PFRDA and Irdai along with banks, pension agencies and insurance finance ministry statement noted that the FSDC also deliberated on the emerging trends from the domestic and global macro-financial situation and stressed the need to be vigilant."The council recognised the need for proactive efforts to mitigate potential risks to financial stability while adopting adequate safeguards for the financial system's resilience," it said.

Police declare no-parking zone around Mall of Asia in Bengaluru
Police declare no-parking zone around Mall of Asia in Bengaluru

Time of India

time38 minutes ago

  • Time of India

Police declare no-parking zone around Mall of Asia in Bengaluru

Bengaluru: Considering the regular traffic jams and minor accidents around Mall of Asia at Byatarayanapura on Ballari Road due to haphazard parking by visitors, police have declared the roads in front of and behind the shopping area as a 'no-parking zone'. According to the order issued on May 31 by the then police commissioner B Dayananda, the no-parking zone starts from the service road at Byatarayanapura Junction to GKVK Agricultural University's double road and the Railway Parallel Road behind the mall. The total length of the no-parking zone is around 1,300 metres. The notification was based on the proposals from assistant commissioner of police (traffic, northeast) and inspectors of Hebbal and Sanjaynagar traffic police stations. The commissioner, in his order, stated that thousands of people visit the mall every day. Due to high parking fees inside the mall and the time it takes to enter and exit the commercial building, people park their vehicles on the service road of BB Road in front of the mall, double road on the right side of Railway Parallel Road/GKVK Agricultural University, which is the road behind Mall of Asia, causing traffic congestion. "Following the order, in the initial 10 days, we used wheel locks on vehicles parked on these roads. It was half effective, so we started towing vehicles. Towing is not a regular occurrence… A private vehicle is hired when needed," said joint commissioner of police (traffic) MN Anucheth. Motorists will only be fined Rs 500 for parking in the no-parking zone. Measures are being taken to install no-parking boards at multiple places on these roads. So far, over 30 two-wheelers and over 10 cars have been towed, the officer added. Bengaluru: Considering the regular traffic jams and minor accidents around Mall of Asia at Byatarayanapura on Ballari Road due to haphazard parking by visitors, police have declared the roads in front of and behind the shopping area as a 'no-parking zone'. According to the order issued on May 31 by the then police commissioner B Dayananda, the no-parking zone starts from the service road at Byatarayanapura Junction to GKVK Agricultural University's double road and the Railway Parallel Road behind the mall. The total length of the no-parking zone is around 1,300 metres. The notification was based on the proposals from assistant commissioner of police (traffic, northeast) and inspectors of Hebbal and Sanjaynagar traffic police stations. The commissioner, in his order, stated that thousands of people visit the mall every day. Due to high parking fees inside the mall and the time it takes to enter and exit the commercial building, people park their vehicles on the service road of BB Road in front of the mall, double road on the right side of Railway Parallel Road/GKVK Agricultural University, which is the road behind Mall of Asia, causing traffic congestion. "Following the order, in the initial 10 days, we used wheel locks on vehicles parked on these roads. It was half effective, so we started towing vehicles. Towing is not a regular occurrence… A private vehicle is hired when needed," said joint commissioner of police (traffic) MN Anucheth. Motorists will only be fined Rs 500 for parking in the no-parking zone. Measures are being taken to install no-parking boards at multiple places on these roads. So far, over 30 two-wheelers and over 10 cars have been towed, the officer added.

Meet fails to find consensus on Metro alignment in Thiruvananthapuram; state govt opts for further consultation
Meet fails to find consensus on Metro alignment in Thiruvananthapuram; state govt opts for further consultation

Time of India

time38 minutes ago

  • Time of India

Meet fails to find consensus on Metro alignment in Thiruvananthapuram; state govt opts for further consultation

Thiruvananthapuram: The long-pending Metro rail project in the state capital has hit another roadblock, as the high-level meeting chaired by chief minister on Wednesday failed to finalise the alignment. Tired of too many ads? go ad free now Instead, the state govt decided to constitute an advisory committee to consult stakeholders on the various alignment proposals, effectively pushing the project back to square one. According to sources, the decision to form the committee was taken after multiple stakeholders presented differing alignment suggestions, complicating the planning process. The committee will be formed under the leadership of the chief secretary. It will examine related matters and submit its recommendations. The committee will include the secretaries of revenue, finance, local self-govt and transport departments. Kochi Metro Rail Limited (KMRL), the implementing agency of the project, presented six alignment options during the meeting. However, Shashi Tharoor, MP, who participated online, also submitted his alignment proposals, prompting the chief minister to recommend further stakeholder consultation before moving forward. In a post on social media platform X, Tharoor wrote, "Had a very constructive online meeting this morning (Wednesday), chaired by the Chief Minister @pinarayivijayan, to discuss plans for a Metro in Thiruvananthapuram, something I have been clamouring for ever since becoming an MP." He added that an advisory committee would be formed to evaluate the proposals. "Our vision for the Metro must be to anticipate the needs of generations yet unborn," Tharoor posted. Tired of too many ads? go ad free now "I am confident that, with the right approach, we can make Thiruvananthapuram an ideal capital city for the 21st century," he added. Meanwhile, KMRL chief Loknath Behera described the meeting as positive and expressed hope that a final decision would be made soon. "A presentation about the alignments of the proposed Metro rail in Thiruvananthapuram was completed. Now, the govt has to take a final decision," he told TOI. Once the alignment is finalised, it will be handed back to KMRL to revise the detailed project report (DPR) originally prepared by Delhi Metro Rail Corporation (DMRC). The DPR's executive summary was submitted to the state govt in Feb 2024. The finance department gave its approval to the project earlier this year. After the chief minister's nod, the project will be sent to the state cabinet for final clearance. In the 2025-26 state budget, the govt announced that preliminary work on the Metro would begin within the year. However, alignment disputes continue to stall progress. The transport department earlier rejected DMRC's original alignment, citing impracticalities and suggested an alternative route beginning at Kazhakkoottam instead of Pallipuram on NH 66. As per the previous cost estimate prepared by DMRC, the project will cost Rs 11,560.8 crore. The KMRL proposed a conventional Metro in Thiruvananthapuram instead of a light Metro, which was initially proposed. It was earlier said that DMRC would submit the report to the KMRL in Jan last year, which would in turn submit it to the state govt by the end of Jan after reviewing it. However, it was delayed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store