
CM Gupta announces approval for tunnel between Shiv Murti and Nelson Mandela Rd
New Delhi: Delhi chief minister Rekha Gupta announced on Sunday that the national capital has started reaping the benefits of the double engine govt as the Centre has approved a 5-km tunnel.
This tunnel is expected to balance the traffic between south Delhi and NCR.
The tunnel, stretching from Shiv Murti–Mahipalpur (Dwarka expressway) to Nelson Mandela Road (Vasant Kunj), will reduce congestion on multiple routes and create a signal-free corridor.
The CM said that after a recent meeting with Union minister Nitin Gadkari, several projects worth Rs 24,000 crore, aimed at streamlining traffic and reducing pollution in Delhi and its adjoining areas, were approved.
Among them is the 5-kilometre tunnel, which will be constructed by the National Highways Authority of India (NHAI) at an estimated cost of Rs 3,500 crore.
The tunnel will have two underground tubes — one each for up and down traffic. Each tube will have three lanes. The tunnel will also have electro-mechanical systems, ventilation, fire safety, CCTV surveillance, control rooms, emergency exits and cross-passages.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Giao dịch vàng CFDs với mức chênh lệch giá thấp nhất
IC Markets
Đăng ký
Undo
She said that the construction of the tunnel will significantly ease traffic congestion on Nelson Mandela Road (Vasant Kunj), Mahipalpur and Rangpuri. It will also reduce the traffic load on Dhaula Kuan, Rao Tula Ram Marg, and National Highway 48 in the Mahipalpur area.
South Delhi MP Ramvir Singh Bidhuri said that the tunnel will be a blessing for people in the area as it will offer a direct, signal-free atlernative between south Delhi, Dwarka and Gurgaon.
The tunnel is expected to help in eliminating traffic jams on NH-48 during peak hours.
This tunnel will be a key connector between central/east Delhi and multiple major expressways and highways, including the Delhi Expressway (NE-5), NH-44, NH-10, Delhi-Jaipur Highway (NH-48), and Delhi-Dehradun Expressway (NH-709B) via the Urban Extension Road (UER) and Dwarka Expressway, Bidhuri said. This will lead to smoother traffic across these routes and a significant reduction in pollution levels, he added.
The chief minister said that all technical and formal requirements for the project are in their final stages, and work is expected to start early next year. Calling this project the "foundation for the Delhi of the future," Gupta said that the tunnel will give a new direction to Delhi's infrastructure and bring relief to millions.
"We are committed to making Delhi congestion-free and clean," she said.
The tunnel project ends at the upcoming intersection at Shiv Murti on the Delhi-Gurgaon Expressway. Officials said those heading towards Gurgaon can take the left turn to join the expressway, while others can seamlessly get on to the Dwarka Expressway to head towards Manesar or Chandigarh.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
14 minutes ago
- Time of India
Maharashtra IT department emerges as primary cloud service provider for govt departments
Pune: Maharashtra's Information Technology Corporation Ltd (MahaIT) has become the main cloud service provider for govt departments. Senior state IT officials confirmed that several departments have already began migrating their data to MahaIT's cloud platform, marking a strategic shift in the state's data management approach. Tired of too many ads? go ad free now "It is a win-win situation — departments gain peace of mind regarding data safety and security, while we strengthen our capabilities in cloud services," said an official. The move has come in the aftermath of a major controversy earlier this year when MahaIT filed a criminal complaint against a private cloud vendor and its directors over alleged extortion and threats to delete sensitive govt data. The FIR accused the firm of breaching contract terms and blocking access to services for eight departments after invoicing for undelivered services. The matter escalated to Bombay High Court, which directed affected departments to transfer their data to MahaIT's cloud. Launched under Maharashtra's 2018 public cloud policy — the first of its kind in India — the state mandated all govt departments to store data on cloud platforms, opening a Rs 200 crore opportunity for cloud service providers. However, concerns over security and vendor reliability have since prompted a greater push for in-house cloud solutions. Currently, MahaIT is in discussion with multiple departments to broaden cloud adoption on its platform, aiming to consolidate govt data under a single, secure service provider. Many departments, such as the state registration department, the agriculture department, and many others, have shifted to cloud. "There are several departments that are already using cloud services. We will reach out to all departments and put across our services,'' an IT official added.


Economic Times
19 minutes ago
- Economic Times
RBI's next interest rate cut action likely in December
Reserve Bank of India may keep interest rates steady in August. However, further reduction is expected later this year. This follows a larger-than-expected cut aimed at boosting economic growth. Most institutions anticipate a rate cut in either October or December. The central bank will also lower the cash reserve ratio to inject liquidity. These measures surprised the markets. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads The Reserve Bank of India (RBI) is expected to hold interest rates in August but possibly make yet another reduction later this year, following its greater-than-expected cut on Friday aimed at bolstering growth.A poll by ET showed that eight out of 10 institutions expect a rate cut either in October or December while two do not expect any reduction until December. All participants expect a pause in August. Nomura is the only participant anticipating a25 bps rate cut in the October and December policy reviews. The next meeting of the RBI Monetary Policy Committee (MPC) is scheduled for August 4-6. A basis point is 0.01 percentage RBI announced a 50 bps reduction in the key repo rate to 5.50% — against expectations of a 25 bps cut — and shifted its stance to 'neutral' from 'accommodative'.Since then, economists and market participants have been debating the extent of further rate cuts that the central bank may take and by when, given governor Sanjay Malhotra's statement that monetary policy was left with limited space to support growth after having reduced the repo rate by 100 bps since February. He added that the future course of action by the MPC will be data other factors could come into play later in the year. 'The combination of a 50 bps repo rate cut and a shift in stance to neutral is a signal that the space for policy easing has been largely exhausted,' Nomura said. 'However, the policy outlook depends on the macro outlook. Beyond an August pause, we expect the easing cycle to continue and still see 5.00% as the terminal rate.'Possible uncertainties include the June-September monsoon, US tariffs and their impact on growth and the potential for inflation to come in below projections. Despite challenges, there's room for further reduction in the RBI's repo rate, most participants said. The monsoon made landfall earlier than scheduled and while the weather office has said it will be above normal, there's been a lull in rain in some parts of the country since then. Other areas have been hit by severe RBI will also lower the cash reserve ratio by 50 bps to 3% in phases, starting September, to infuse Rs 2.5 lakh crore liquidity in the system. Both measures — the extent of the rate cut and the CRR reduction — caught the markets off guard. 'Everything that had been forecast for this calendar year happened in one policy,' a bond trader said, reflecting the market's mood after the June 6 monetary policy the governor's statement on the limited space to support growth, some economists said the RBI is not just responding to short-term data, but is also aiming to help the Indian economy grow at its full potential. Malhotra has said that the aspiration is to grow at 8%, more than 6.5% projected by the central bank for FY26.


Time of India
23 minutes ago
- Time of India
New JERC rules push power dept to plan for demand, prevent shortages
Panaji: To improve electricity reliability, the Joint Electricity Regulatory Commission (JERC) has notified guidelines to help power distribution companies plan power purchases better and avoid shortages. These rules, known as the Joint Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025, are designed to ensure that there is enough electricity available to meet the growing demand, especially during peak seasons like summer. According to the guidelines, electricity distribution agencies like the Goa electricity department will be required to forecast how much power will be needed on a monthly, seasonal and yearly basis. Department officials must plan for any gaps in power requirements and contract additional power if needed. This will help avoid sudden power cuts or blackouts during high-demand periods, the guidelines stated. 'Peak demand (in MW) shall be determined by considering the average load factor, load diversity factor, seasonal variation factors for the last three years, and the load forecasts (in MWh) obtained,' the guidelines said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Capital Gains Exemptions for Seniors SmartAsset Learn More Undo Failure to plan power requirements leading to power cuts could result in penalties, according to the notified guidelines. These penalties cannot be passed on to the consumers. It is expected to hold the Goa electricity department accountable and prevent mismanagement. The new rules also make it mandatory for electricity providers to publicly share how much power they are buying or selling. This data must be uploaded to their websites regularly. Consumers will now be able to access information on power availability, giving them greater visibility into how their electricity is being managed. These guidelines also apply to state transmission companies and full, open access consumers that are connected to the power grid. The JERC guidelines push for improved coordination among power companies, load management centres, and govt bodies. All electricity providers will have to work together to share data on power demand, availability and consumer usage patterns. The Goa electricity department will have to set up two dedicated teams — one for long-term planning and another to manage day-to-day electricity buying and selling of power. These teams will be responsible for ensuring there is no gap between demand and supply, the guidelines said.