
DUBAI GAMES 2025 Expands Global Reach with Key Partnerships
Held under the patronage of His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai, the event will run from 20 to 23 February 2025 at Dubai Festival City.
Key partners include the Dubai Sports Council, Dubai Electricity and Water Authority (DEWA), First Abu Dhabi Bank (FAB), M42, C4, Al-Futtaim Automotive, Al-Wasl Group (Viya), and adidas. Official sponsorship comes from DP World, with DAMAC Group and Emarat as diamond partners.
His Excellency Saeed Mohammed Al Tayer, MD & CEO of DEWA, emphasized the event's role in fostering a culture of sports and healthy living, aligning with the UAE's Year of Community initiative. Saeed Hareb, Secretary General of Dubai Sports Council, highlighted the championship's evolution into a global sporting phenomenon.
Marwan bin Essa, Director of DUBAI GAMES, stated, 'These partnerships strengthen Dubai's status as a leading global sports hub, inspiring excellence and community engagement.'
The event will feature over 240 teams competing across categories such as Battle of the Government, Battle of the Community, Battle of the Cities, and Battle of the Juniors, with a prize pool exceeding AED 3.1 million. The championship kicked off on 1 February with the Battle of the Community pre-qualifications, followed by the Battle of the Juniors on 8 February.
News Source: Dubai Media Office
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Dubai Eye
6 hours ago
- Dubai Eye
Hatta hydroelectric plant begins power export trial to Dubai grid
Dubai Electricity and Water Authority (DEWA) has announced the start of trial operations of electricity export from the pumped-storage hydroelectric power plant in Hatta to Dubai. The plant will have a production capacity of 250 megawatts (MW), a storage capacity of 1,500 megawatt-hours, and a lifespan of up to 80 years. The peak electricity demand in Hatta is approximately 39 MW, and the surplus will be exported to Dubai. The project is designed to generate electricity using water stored in the Hatta Dam and the upper dam with a turnaround efficiency of 78.9 per cent. It uses the potential energy of water stored in the upper dam, converting it into kinetic energy as it flows through a 1.2-kilometre subterranean tunnel. This kinetic energy rotates the turbines, converting mechanical energy into electrical energy, which can be supplied to DEWA's grid within 90 seconds to meet demand. To store energy, clean power generated at the Mohammed bin Rashid Al Maktoum Solar Park will be used to pump water back to the upper dam, converting electrical power into kinetic energy in the process. Saeed Mohammed Al Tayer, MD and CEO of DEWA visited the plant and was accompanied by Nasser Lootah, Executive Vice President of Generation (Power & Water) at DEWA; Khalifa Al Bedwawi, Project Manager; and the project team. Al Tayer affirmed that the project is in line with the vision and directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President, Prime Minister and Ruler of Dubai, to achieve comprehensive and sustainable development across the Emirate of Dubai. It also supports the Dubai Clean Energy Strategy 2050 and the Dubai Net-Zero Carbon Emissions Strategy 2050, which aim to provide 100 per cent of Dubai's total energy production capacity from clean sources by 2050. During the visit, Al Tayer toured the power generation station building, which was constructed 60 metres underground, and was briefed on the operation of the station's two main water valves, each weighing approximately 110 tonnes. He also inspected the station's command and control centre and witnessed an operational test of the water pumping and power generation. The visit included the upper dam, built by DEWA as part of the project, with a total water surface area of 210,000 square metres. The dam comprises two compressed concrete walls: a main wall 72 metres high and 225 metres long, and a side wall 37 metres high. The upper dam has a storage capacity of around 5.3 million cubic metres (1,166 million gallons) of water. Al Tayer highlighted that the hydroelectric power plant in Hatta, with an investment of approximately AED1.42 billion, is part of DEWA's efforts to diversify energy production from renewable and clean sources in Dubai. These include technologies such as solar photovoltaic panels, concentrated solar power, and energy storage in batteries.


Zawya
9 hours ago
- Zawya
Powerful new documentary spotlights world's largest humanitarian logistics hub in Dubai
First six months of 2025 saw AED179.2M of humanitarian aid distributed from Dubai Humanitarian across 81 countries, reflected in its Humanitarian Logistics Databank Dubai, UAE – Dubai Humanitarian, the world's largest humanitarian logistics hub, has unveiled a new documentary, Coming Together: The Dubai Humanitarian Story - a gripping behind-the-scenes look at the premier disaster response facility. From devastating floods in Pakistan to the escalating conflict in Gaza, the film captures real-time coordination between United Nations agencies, international NGOs, and government partners. It reveals how Dubai Humanitarian's 150,000 sqm of warehouses - donated by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai - enables life-saving supplies like vaccines, health kits, and clean water to reach crisis zones within hours. The documentary highlights the critical role of partners including the UN World Food Programme and UNHCR, and government logistical partners like Dubai Customs and Emirates Airline, whose close collaboration ensure relief efforts are swift, seamless, and scalable. Their combined expertise in customs clearance, logistics, and airlift capacity has proven vital in overcoming the most complex humanitarian challenges and ensuring response and aid are provided in record time. This new documentary also underscores the human stories behind the headlines - of aid workers, customs officials, and airline crews working as one to deliver hope. 'Dubai Humanitarian is more than a logistics hub - it's a global lifeline,' said Giuseppe Saba, CEO, Dubai Humanitarian, 'This film shows what's possible when the world comes together, and when the UAE leads with purpose.' Saba added: '2025 continues to bring extraordinary global challenges. Working alongside our UN partners and other relief organisations, in just the first half of the year Dubai Humanitarian facilitated the delivery of over AED 179.2 million in aid to 81 countries across the globe, with the need for shelter and health aid being particularly striking. We remain steadfast in our commitment to stand with our international humanitarian community in safeguarding the most vulnerable.' Head of the United Nations Office for the Coordination of Humanitarian Affairs (UN OCHA) UAE, Sajeda Shawa, said: 'We need to make sure humanitarian aid is delivered based on humanitarian principles - with no discrimination and with equality. Being the voice of those who have no voice is not a luxury - it's a responsibility, an honour and a life calling.' Dubai Humanitarian's one of a kind, AI-powered Humanitarian Logistics Databank enables real-time analytics, demand forecasting, and stock visibility across time zones. It helps aid agencies anticipate needs, avoid price spikes, and prepare for seasonal surges, such as monsoon-related shelter demand in Bangladesh. Dubai's strategic location, just 10 minutes from Jebel Ali Port and Al Maktoum Airport, allows humanitarian cargo to reach two-thirds of the world's hazard-prone population within 4 to 8 hours. As the databank expands to 11 hubs, aid will be increasingly sourced locally, reducing carbon emissions and delivery times. The powerful behind the scenes documentary premiers on World Humanitarian Day, 19 August, on the Dubai Humanitarian YouTube channel Dubai Humanitarian aid in numbers (Jan to Jun 2025) $48.8m Aid worth $48,867,298 distributed from Dubai Humanitarian. 81 Aid sent to 81 countries. $14m Health Aid: This included $13,969,276 worth of health accessories, medical equipment, pharmaceutical items and more. $1m Water and Sanitation Aid: The demand for water and sanitation aid included $733,297 worth of water supply items, ranging from buckets and containers to Jerry Cans. $15m Shelter Aid: Almost a third of all aid was allocated to shelter. This included 937,377 pieces of camping and field equipment, from tents to winterisation kits $208.1m Stock value available at Dubai Humanitarian in June 2025. 25 During the first half of 2025, key moments included the 25th Dubai Humanitarian airlift for Gaza. The April operation delivered 56.8 metric tonnes of critical medical supplies worth over $1million (AED4.3million), provided by the World Health Organization (WHO), to El Arish Airport in Egypt. About Dubai Humanitarian: Dubai Humanitarian, formerly known as the International Humanitarian City, is the largest humanitarian hub in the world. Established in 2003 by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the United Arab Emirates and Ruler of Dubai, it was created to proactively support the efforts of the international humanitarian community. As the only non-profit, independent humanitarian free zone authority, Dubai Humanitarian is home to a diverse community of around 80 members, including United Nations agencies, non-profits, non-governmental organizations, and commercial companies. Together, they work to advance humanitarian and development efforts worldwide. Benefits of the Humanitarian Logistics Databank To countries in need of aid: Real-time analytics and 24/7/365 visibility of aid levels – daily updates provides accurate data, especially convenient across time zones and saves phone calls Enhanced co-ordination and faster identification of aid partners – countries requiring aid have access to detailed data, including which members from UN World Food Programme to UNICEF within Dubai Humanitarian have how much of each product, so they can approach them direct for support, knowing their current stock levels To Dubai Humanitarian-based aid agencies: Prepare more effectively by anticipating aid demand – as aid flows can be tracked over time, through its ongoing AI backed data analysis, Dubai Humanitarian can advise aid agencies when demand will likely peak and aid levels will run low. For example, during the August monsoon season in Bangladesh, Dubai Humanitarian identified the higher annual demand for tents and blankets. Aid agencies at Dubai Humanitarian can then build up stocks ahead of time Avoid price spikes – By building up stock ahead of demand spikes, aid agencies can manage stocks more effectively and purchase aid ahead of price surges. To Dubai Humanitarian Anticipate storage needs - Dubai Humanitarian continually analyses its data to understand changing demand for different types of aid. By recognising the increase in health product demand in the early years of the databank, Dubai Humanitarian were able to expand its cold storage solutions and were then more prepared for the Covid-19 response as a result. Global sustainability Reducing travel distances and carbon emissions - Due to Dubai's strategic geographic position on the path between Middle East, Asia and Africa, and Dubai Humanitarian being located only 10 minutes away from the Jebel Ali seaport and Al Maktoum airport, it enables the humanitarian community to reach, within 4-8 hours, two-thirds of the world population living in hazard-prone areas. Future view: locating local aid – As the databank grows to include up to 11 hubs, countries and organisations in need will be able to effectively locate their closest available aid, reducing travel time and emissions, with aid able to travel by road and sea rather than air.


TAG 91.1
11 hours ago
- TAG 91.1
Hatta hydroelectric plant begins power export trial to Dubai grid
Dubai Electricity and Water Authority (DEWA) has announced the start of trial operations of electricity export from the pumped-storage hydroelectric power plant in Hatta to Dubai. The plant will have a production capacity of 250 megawatts (MW), a storage capacity of 1,500 megawatt-hours, and a lifespan of up to 80 years. The peak electricity demand in Hatta is approximately 39 MW, and the surplus will be exported to Dubai. The project is designed to generate electricity using water stored in the Hatta Dam and the upper dam with a turnaround efficiency of 78.9 per cent. It uses the potential energy of water stored in the upper dam, converting it into kinetic energy as it flows through a 1.2-kilometre subterranean tunnel. This kinetic energy rotates the turbines, converting mechanical energy into electrical energy, which can be supplied to DEWA's grid within 90 seconds to meet demand. To store energy, clean power generated at the Mohammed bin Rashid Al Maktoum Solar Park will be used to pump water back to the upper dam, converting electrical power into kinetic energy in the process. Saeed Mohammed Al Tayer, MD and CEO of DEWA visited the plant and was accompanied by Nasser Lootah, Executive Vice President of Generation (Power & Water) at DEWA; Khalifa Al Bedwawi, Project Manager; and the project team. Al Tayer affirmed that the project is in line with the vision and directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President, Prime Minister and Ruler of Dubai, to achieve comprehensive and sustainable development across the Emirate of Dubai. It also supports the Dubai Clean Energy Strategy 2050 and the Dubai Net-Zero Carbon Emissions Strategy 2050, which aim to provide 100 per cent of Dubai's total energy production capacity from clean sources by 2050. During the visit, Al Tayer toured the power generation station building, which was constructed 60 metres underground, and was briefed on the operation of the station's two main water valves, each weighing approximately 110 tonnes. He also inspected the station's command and control centre and witnessed an operational test of the water pumping and power generation. The visit included the upper dam, built by DEWA as part of the project, with a total water surface area of 210,000 square metres. The dam comprises two compressed concrete walls: a main wall 72 metres high and 225 metres long, and a side wall 37 metres high. The upper dam has a storage capacity of around 5.3 million cubic metres (1,166 million gallons) of water. Al Tayer highlighted that the hydroelectric power plant in Hatta, with an investment of approximately AED1.42 billion, is part of DEWA's efforts to diversify energy production from renewable and clean sources in Dubai. These include technologies such as solar photovoltaic panels, concentrated solar power, and energy storage in batteries.