logo
Marmota expands drilling program at high-grade SA gold target

Marmota expands drilling program at high-grade SA gold target

The Age11 hours ago
Marmota Limited has extended its maiden drilling program at its proven gold-mineralised Greenewood prospect in the northwestern part of the company's extensive multi-commodity Gawler Craton tenements in South Australia.
It now plans to drill about 12,500 metres at an average downhole depth of 90m to deliver a maiden campaign far surpassing all the previous drilling metres put into the Greenewood prospect.
The company has so far completed 61 holes in July for 5108m, with the drilling crew averaging about 284m per day. Marmota expects to continue the program for a further four to five weeks.
The company flagged its drilling proposal and launched its new program in early July, following a detailed review of Greenewood's historic data.
'Marmota's Gawler gold project is progressing beautifully. We are delighted to carry out our maiden program at the nearby Greenewood gold deposit.'
Marmota Limited chairman Dr Colin Rose
The review found that gold mineralisation was discovered at the prospect during ASX-listed Tyranna Resources' 2016 reverse circulation drilling campaign to follow up anomalous gold results from a 2003 rotary air-blast (RAB) drilling program.
Tyranna drilled the prospect further in 2017 and 2018, before moving away from gold to pursue lithium in Angola. Marmota acquired Tyranna's South Australian gold assets in 2020-2021.
Tantalisingly, Marmota's reappraisal of the old gold assays during its recent data review unveiled some serious hits in Tyranna's reverse circulation drill tests. These include a best run in one hole of 1 metre assaying 53 grams per tonne (g/t) gold within a wider interval of 14m at 6g/t gold.
A second hole hit 1m going 37g/t gold within a wider interval of 22m at 4g/t gold, while a third hole nailed 1m running 21g/t gold in a broader interval of 13m at 3.4g/t gold. A fourth hole bored through a further 1m interval assaying 29g/t within a 5m intercept going 10g/t gold.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

AusSuper's Manuell on why big super funds need to be active investors
AusSuper's Manuell on why big super funds need to be active investors

AU Financial Review

time7 hours ago

  • AU Financial Review

AusSuper's Manuell on why big super funds need to be active investors

Australia's $4.1 trillion superannuation system is a fantastic tax-effective productivity war chest, but are those responsible for overseeing it shirking their duty to the country by passively allocating it to companies based on index position and size? That's the cracking question from AustralianSuper's Shaun Manuell, the country's biggest active equities' investor, who oversees $97 billion worth of Australian shares, or an estimated 3.2 per cent of the ASX.

MRL completes shift into lime and cement
MRL completes shift into lime and cement

Herald Sun

time7 hours ago

  • Herald Sun

MRL completes shift into lime and cement

Don't miss out on the headlines from Stockhead. Followed categories will be added to My News. Mayur Resources changes name to Pacific Lime and Cement as it becomes a PNG supplier of building and industrial materials Company will focus on delivering high-quality lime, cement and downstream building products Future expansion will include concrete production, castings, bricks, pavers, and other building products Mayur Resources has rebranded itself as Pacific Lime and Cement to reflect its successful transition from a resource developer into an integrated supplier of building and industrial materials in Papua New Guinea. The move to focus on the delivery of high-quality lime, cement and downstream building products is timely given that the country's cement demand is projected to grow significantly in 2026. It also comes as the PNG Government flagged its interest in reducing or eliminating cement imports. Minister for International Trade and Investment Richard Maru said in June 2025 that cement is 'essential in building our nation'. 'Our rebrand to Pacific Lime and Cement reflects our transformation into an integrated industrial materials company focused on nation-building in Papua New Guinea,' managing director Paul Mulder said. 'The new name positions us clearly in the market as a supplier of cement, quicklime, and processed building products, underpinned by our own quarry, processing, power, water, and international wharf infrastructure, all within our dedicated Special Economic Zone. 'The CCL Project is poised to become PNG's first vertically integrated downstream manufacturing hub, enabling the country to be self-sufficient in critical industrial materials like cement and quicklime. 'Through the SEZ, the platform is set to expand further downstream into concrete production, castings, bricks, pavers, and other building products, stimulating further economic and social development.' Mayur Resources (ASX:MRL) expects to commence trading on the ASX under the ticker PLA pending completion of administrative requirements. Strategic direction Originally incorporated in 2011 to pursue strategic development opportunities in PNG, the company has evolved to focus on building materials, renewable energy, and other nation-building initiatives. Early construction is already underway at the company's CCL (Central Cement and Lime project) and a final investment decision is imminent. Location and SEZ of the Central Cement and Lime project. Pic: Pacific Lime and Cement CCL sits just 25km north of the capital Port Moresby and will feature a co-located quarry, plant site and deep draft wharf to enable very low operating costs while providing direct access to both seaborne domestic and export markets. The fully permitted Stage 1 lime development will be capable of delivering >400,000tpa of quicklime and hydrated lime from two kilns to generate EBITDA of ~US$34.5m annually. Stage 2 will involve the construction of two additional kilns. Meanwhile, the cement development will be integrated with the lime project and export wharf facilities. This targets production of 1.65Mt of clinker, which makes up the bulk of cement. CCL also has Special Economic Zone status, which was verified by the PNG government in June 2025 to be legally valid and very much in full force. This SEZ provides fiscal benefits such as tax relief and duty exemptions for downstream processing operations. The company adds that while lime and cement remain the core focus, it will not limit itself in its consideration of complementary initiatives in renewable energy, battery minerals, nature-based carbon, and broader industrial development that contribute to long-term nation-building in PNG. Originally published as Mayur turns over new leaf with Pacific Lime and Cement rebrand

Paladin Energy shares lose 11pc as Langer Heinrich guidance misses expectations
Paladin Energy shares lose 11pc as Langer Heinrich guidance misses expectations

West Australian

time8 hours ago

  • West Australian

Paladin Energy shares lose 11pc as Langer Heinrich guidance misses expectations

Shares in the most shorted stock on the Australian Securities Exchange have plunged after output targets at its African uranium mine disappointed again. Perth-based Paladin Energy lost 11.3 per cent of its value on Wednesday despite posting a 33 per cent rise in quarterly production from its Langer Heinrich mine in Namibia. Paladin cranked out 993,843 pounds of triuranium octoxide — a uranium compound — compared with 745,484lb during the prior quarter. The average realised price of Langer Heinrich's radioactive product dropped $US69.9/lb to $US55.6/lb, while production costs declined from $US40.60/lb to $US37.50/lb. Output forecasts for the current financial year caused investors to flee. Production for the financial year is expected to sit between 4 million and 4.4 million pounds of U3O8 with costs between $US44/lb and $US48/lb. Costs were higher and output lower than what analysts had pencilled in. Paladin's management pinned the result on higher-than-expected mining and blasting expenses plus grade variability in its stockpiled ore. The poor result was good news for Paladin's legion of short sellers, who effectively profit when the company's share price tanks. The portion of Paladin's stock controlled by short sellers is 16.8 per cent, according to Australian Securities and Investments Commission data. It became the most shorted stock on the ASX last month, taking the unwanted mantle from fellow uranium miner Boss Energy. Paladin's shares are down 8.1 per cent so far this year and 39.8 per cent compared to 12 months ago. Paladin is currently facing two class action lawsuits related to production guidance provided last year. It is alleged the company contravened continuous disclosure rules and had engaged in misleading or deceptive conduct. Paladin told the ASX in June last year Langer Heinrich would pump out 4mlb to 4.5mlb of its uranium compound for the 2025 financial year. Quarterly production was well below expectations in October, sparking a 15 per cent share price collapse.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store