logo
Kathipara model flyover to come up on Trichy-Madurai NH: Nehru

Kathipara model flyover to come up on Trichy-Madurai NH: Nehru

Time of India18-05-2025

Trichy: The state govt is working closely with the National Highways Authority of India (
NHAI
) to construct a cloverleaf type flyover on the Trichy-Madurai national highway (NH) to avoid traffic congestion at Panjapur where several new infrastructure including Tidel Park and a new wholesale market are proposed, municipal administration minister K N Nehru informed on Saturday.
The minister was in Trichy to lay foundation stones for new projects and commission completed infrastructure in Trichy corporation limits to the tune of 70 crore.
"The new flyover proposed at Panjapur will be 3.5km long and shall have six lanes. District administration has surveyed and handed over the land required. The flyover to be built by NHAI will be similar to the Kathipara flyover in Chennai. Simultaneously, work for a four lane semi-ring road between
Trichy-Madurai NH
and Trichy-Karur NH is progressing," Nehru said.
NHAI's official sources acknowledged the development and added that a detailed project report (DPR) for the new flyover is progressing and all viable options including cloverleaf model are explored.
Reacting to questions on the status of Maris RoB (Fort Station) and Trichy railway junction RoB (stage II) developments, the minister said that the state govt's scope of works have been completed in both projects, and only Southern Railway has to expedite its scope of work.
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
많이 빠진 치아, 인천에서 33만원으로 다시 시작할 수 있습니다
플란치과
더 알아보기
Undo
"Metro proposal for Trichy city is still under discussion, a survey will commence soon. The expansion of Trichy corporation by amalgamating nearby village panchayats as a part of pan state proposal is being finalized. Ward delimitation will be taken up, objections to the expansion have been sought," Nehru added.
Earlier, the minister laid the foundation stone for phase II of IBT link road at 68 crore.
IBT Link Road Phase II:
Total length: 2.1km
Elevated length: 1.1km
From: Woraiyur
To: Kudamurutti
Width: 10m
Cost: Rs68 crore
Duration: 1.5 years

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...
Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...

India.com

time3 hours ago

  • India.com

Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...

Good news for people going to airport from East Delhi... tunnel to connect Delhi-Meerut Expressway and Gyarah Murti, it is... (Picture for representation purpose) In order to provide relief from traffic jams in Delhi and to reduce the traffic load coming from East Delhi or South Delhi to the Ring Road, Pragati Maidan and Lutyens Zone, the Gyaara Murti (Dandi March Statue) located at the Delhi-Meerut Expressway and Sardar Patel Marg T-junction will be connected by a tunnel of about 7-8 km. New plan for relief from traffic jam At the same time, the proposed elevated corridor from near INA to the airport under Barapullah Phase-4 is another important project. The purpose of the flyover construction is to smoothen the traffic to the airport for commuters from Lutyens Delhi and East Delhi. A few days ago, a high-level meeting was held between Road Transport and Highways Minister Nitin Gadkari and Delhi government ministers. What is the complete plan of the government During this time, the officials of the ministry presented a plan to decongest Delhi through parts of different national highways and new projects . In the future, the government has planned a 128 km long project, on which an estimated expenditure of Rs 23,850 crore is expected. During the meeting, many traffic problems in Delhi were also mentioned, one of which was mentioned in front of the Subroto Park police post near Dhaula Kuan. NHAI has shifted the police post from here and demanded 1300 square meters of land so that a 3-lane wide service lane can be built to go towards Narayana.

Wipro renews Metro AG partnership for additional two years
Wipro renews Metro AG partnership for additional two years

Business Standard

time4 hours ago

  • Business Standard

Wipro renews Metro AG partnership for additional two years

Wipro announced the extension of its partnership with Metro AG, an international food wholesaler, for an additional two years to provide digital services across cloud, data, application development, and AI-enabled IT support services. The company has been working with Metro since 2021 as a strategic IT partner, driving a change management program that has seamlessly transformed the companys entire IT landscape and significantly improved the efficiency of business operations. Aligning with Metros cloud-first strategy, and partnering with multiple hyperscalers, Wipro has successfully completed the migration of 80 percent of Metro's on-premise infrastructure to the cloud. The transformation has significantly increased the companys ability to respond to customer needs with agility and speed, enhanced cyber resilience, and helped Metro reduce its carbon footprint. As part of the extended engagement, Wipro will continue to support Metros digital transformation, leveraging the power of cloud, advanced analytics, automation, and Gen-AI-powered solutions. This will be carried out in close collaboration with Metro's internal teams, ensuring alignment with business priorities. Khaled Bagban, CIO of METRO, said, Our partnership with Wipro has helped us strengthen our IT landscape and ensure stable, reliable operations. Operational stability is critical to our core business, and this partnership plays a key role in maintaining that foundation. As we transition to the public cloud, we are creating a more flexible and scalable environment that supports our Core growth strategy at METRO. Looking ahead, we will continue to prioritize secure services and operational efficiency to enable long-term business success." Ann-Kathrin Sauthoff-Bloch, regional head and managing director Germany and Austria, Wipro, said, This extended engagement with Metro AG underscores our commitment to driving AI-powered innovation, operational excellence, and strategic growth for our clients in the food wholesale sector. This is a testament to our consultative approach and the deep collaboration we undertake with our clients to keep driving their innovation with our AI-powered solutions. We look forward to accompanying Metro on this next step of their transformation journey. Wipro is a leading AI-powered technology services and consulting company focused on building innovative solutions that address clients most complex digital transformation needs. The companys consolidated net profit jumped 6.43% to Rs 3,569.60 crore on 0.83% increase in net sales to Rs 22,504.20 crore in Q4 FY25 over Q3 FY25. The scrip advanced 1.41% to end at Rs 254.85 on the BSE.

For tunnel road tech, BBMP engineers visit Vizag, set to land in Kashmir next
For tunnel road tech, BBMP engineers visit Vizag, set to land in Kashmir next

New Indian Express

time4 hours ago

  • New Indian Express

For tunnel road tech, BBMP engineers visit Vizag, set to land in Kashmir next

BENGALURU: A team from the engineers' wing of BBMP has started visiting other Indian cities where tunnel road projects are being executed. This is to assess and adopt the best practices to execute the first phase of the 18-km-long tunnel road in Bengaluru. The cabinet on June 5, 2025 approved the construction of the north-south tunnel road corridor under the Build-Own-Operate-Transfer (BOOT) model. Deputy Chief Minister and Bengaluru in-charge minister DK Shivakumar has been insisting on the project, claiming that it will decongest the city. The first phase will be taken up at a cost of Rs 17,000 crore. The team recently visited Visakhapatnam to study the New Australian Tunnelling Method (NATM) that is being used by the NHAI to build the 464-km tunnel road reaching Raipur. The BBMP team is going next to Kashmir to understand the tunnel projects there. 'We went to Vizag to understand NATM, the land required and the time it takes as compared to other regular methods. The existing technology used by BMRCL cannot be adopted for the road project as the diameter of the tunnel boring machine for the Metro rail project is 5.6 metre, while the road project requires at least 14.6 metre,' BBMP Chief Engineer BS Prahalad told TNIE. Understanding different models is essential when executing the project in Bengaluru, where land acquisition and cost is a concern, he said. 'We need to understand each of the tunnelling methods before coming to a conclusion. So far nothing has been finalised,' he added. The visits and the preparatory work is going on at a time when citizens and experts have demanded that the project be dropped and the public transport system be strengthened. They pointed out that what is being done in other cities cannot be replicated here without a thorough analysis. BBMP sources said that instead of studying the technology, the engineering team should look at the feasibility and requirements of other cities and compare them to Bengaluru. But that is not being done, they added. Prof Ashish Verma, a mobility expert from IISc, said, 'Studies and various models prepared by us have shown that public transport is better when compared to the tunnel road. It is not a feasible project in the long run.'

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store