PowerBall PLUS: A lucky player wins R28 million in latest draw
A LUCKY participant has won the PowerBall PLUS jackpot of R28,558,423.50, through their banking app.
The ticket was part of the PowerBall PLUS jackpot in Draw 1612, held on Tuesday (May 6).
The winning ticket was purchased via a banking app, with a wager of R67.50 and a manual selection.
Charmaine Mabuza, CEO of ITHUBA, said she is excited as this was the reason PowerBall Plus was created.
'It's truly fulfilling to witness the PowerBall PLUS doing exactly what it was designed to do —offering players a second chance to win big. This win highlights the convenience and security of playing the National Lottery through banking apps. We are thrilled for the winner and remain committed to delivering a world-class lottery experience through continuous innovation and accessibility,' said Mabuza.
One participant matched five numbers in Division 2, winning over R180,000, while 18 others matched four numbers plus the PowerBall in Division 3, each taking home over R6,000.
The POST
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

IOL News
an hour ago
- IOL News
City of Tshwane saves millions by insourcing construction services
The City of Tshwane will save millions of rand in architectural fees by outsourcing these services for projects like the building of the Lusaka Clinic in Mamelodi. Image: Supplied In a bid to save the City of Tshwane millions of rand, the multiparty Mayoral Committee has approved a proposal mandating all city construction projects to utilise the city's internal professional services, which are part of the Physical Development Services section within the Department of Economic Development and Spatial Planning. 'The insourcing of these services for new building design projects, alterations, additions, and as-built documentation has already begun to save the City of Tshwane millions of rand in fees that would otherwise have been outsourced,' Councillor Sarah Mabotsa said. She added that the Physical Development Services of the Department of Economic Development and Spatial Planning is staffed by qualified architectural professionals, quantity surveyors, and building works inspectors. They are equipped to manage projects from inception through to completion. She explained that until now, some city departments have contracted these services externally, resulting in high consultant costs for the city and often leading to inconsistent quality and misalignment with city-wide standards. 'By insourcing these services, the City of Tshwane will reduce expenditure and also ensure standardised project quality and protect municipal interests,' Mabotsa said. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad Loading According to her, savings of about 10% to 20% on external consulting fees are typically achieved on smaller projects of up to R500,000 in value, and on larger projects (of R20 million or more), savings are usually between 7% and 15% of the project cost. 'This insourcing has already saved the city R16.6 million on recent projects. The initiative to mandate insourcing of these services going forward will save the city many more millions,' she said. For the projects of the Stinkwater Social Development Centre (a R51 million project), Gazankulu Clinic (a R26.5 million project), Rayton Clinic (a R24 million project) and the Soshanguve Clinic (a R18.5 million project), architect fees of R3.6 million, R1.9 million, R1.7 million and R1.5 million were saved on each project respectively. Other projects under way or in planning, which the Physical Development Services section is assisting with, like the R50 million Mabopane Social Development Service and R61 million Lusaka Clinic, will see savings in architectural fees of R3.5 million and R4.4 million respectively. 'Doing our work faster and at less cost to ratepayers means that we reduce our spending and can do more with our available budgets,' Mabotsa said.

TimesLIVE
2 hours ago
- TimesLIVE
GM to invest $4bn in three US facilities as it ramps up petrol-powered vehicles
General Motors said on Tuesday it is planning to invest about $4bn (R70,766,400,000) over the next two years at three US facilities in Michigan, Kansas, and Tennessee as it moves to boost production of petrol-powered vehicles amid slowing EV demand. The company said it will begin production of petrol-powered full-size SUVs and light-duty pickup trucks at its assembly plant in Orion Township, Michigan, in early 2027. Orion Assembly was previously slated to build electric trucks starting next year. The move calls into question GM's plan to end the production of petrol-powered cars and trucks by 2035. It was welcomed by the White House, which has imposed significant tariffs on imported vehicles to pressure carmakers to move more production to the US. In March, GM CEO Mary Barra met with US President Donald Trump to talk about investment plans and told the president GM needed relief from California emissions and federal fuel economy requirements to expand US production, sources told Reuters. Trump is set to sign legislation on Thursday to rescind California's 2035 zero-emission vehicle rules. "No president has taken a stronger interest in reviving America's once-great car industry than President Trump, and GM's investment announcement builds on trillions of dollars in other historic investment commitments to make in America," said White House spokesperson Kush Desai said. GM's Fairfax assembly plant in Kansas is set to start building the all-electric Chevrolet Bolt by the end of this year, and GM said it will also build the petrol-powered Chevrolet Equinox starting in mid-2027.


Daily Maverick
8 hours ago
- Daily Maverick
Paying more, getting nothing — the Nelson Mandela Bay ward whose capital budget was slashed to zero
'I have been a ward councillor for 25 years and this has never happened to me,' said DA caucus chief whip Gustav Rautenbach. The capital budget for Lorraine and its surrounding suburbs — which makes up Ward 8 — has been slashed from R1.2-million to zero in the draft budget scheduled for discussion and a vote on Thursday. It is one of four DA-led wards in the metro that have been allocated no capital budget — and there is no mechanism for residents to appeal against the decision. The DA caucus chief whip, Gustav Rautenbach, said on Tuesday that there were rumours that the ward might still receive about R500,000 — but this had not been confirmed. Ratepayers are facing increases of 5% for property rates, 5.50% for water, 5.50% for sanitation and 6% for refuse collection, as well as a 12.8% increase in electricity prices if it is approved by the National Energy Regulator of SA. Last year, Ward 8 used its capital allocation to tar and repair part of Circular Drive, a major arterial road. But for the next year, Rautenbach said, there would be no capital allocation. 'It is very problematic,' he said, 'because this means that the Integrated Development Plan and the budget are not talking to each other. 'I think it is important to note that this doesn't mean that no potholes will be filled or no sewage spills will be fixed,' he said. 'That would come from the operational budget.' However, it does mean that no big new projects will be scheduled for the ward in 2025. 'We contribute millions to the municipal treasury,' said Rautenbach. 'Parts of this ward are old and must be replaced. How is that fair?' Lorraine has 122 townhouse complexes with around 3,000 houses, in addition to freestanding homes. 'I would say there are about 21,000 residents who live here,' said Rautenbach. Two of the main roads in the area, Dijon Road and Luneville Road, require major work. 'We don't even have an office,' said Rautenbach. 'We don't have a community hall, and we have no recreational facilities.' He said they had received only R100,000 for a humanitarian fund, like all other wards in the metro. Short-sighted 'This is very short-sighted from the municipality,' he said. 'Because it should be clear that the only direction in which Gqeberha can grow is in this westerly direction. 'I am very upset. Residents are making their contributions, and they are getting nothing.' Three other wards are facing the same outcome. However, Ward 41, represented by Luyanda Lawu, the mayoral committee member for safety and security, is set to receive about R48-million in the upcoming budget and R42-million and R37-million, respectively, for the next two financial years. The ward has several informal settlements that need major infrastructure projects. Last week, the budget was once again 'noted' in the council as Nelson Mandela Bay Executive Mayor Babalwa Lobishe said negotiations around ward allocations were ongoing. According to the budget document, the metro faces 'significant challenges' with the new budget, including: A declining collection rate; The poor financial performance of the electricity service, which now operates at a huge deficit; Escalating electricity and water losses that are at unacceptably high levels; Allocation of the required operating budget provision for newly created infrastructure and facilities, with a consequential impact on the level of property rates and tariff increases; Allocation of the required budget provision for the rehabilitation and maintenance of infrastructure; Underfunded mandates, such as the Library Services, negatively affect the municipality's budget; and Financial commitments emanating from previous council decisions, such as the insourcing of security guards, which become an ongoing cost on the municipality's payroll. DM