
GJEPC targets Saudi Arabia to grow gems and jewellery exports
With its jewellery market projected to nearly double from $4.56 billion in 2024 to $8.34 billion by 2030, Saudi Arabia is fast emerging as a key destination for contemporary and luxury jewellery, the GJEPC said.
A young, urban population and a dynamic retail environment are driving demand for 18K and 21K plain gold, diamond-studded jewellery, and premium design-led products, it added.
Under this backdrop, GJEPC has announced to organise SAJEX 2025– The Saudi Arabia Jewellery Exposition from 11 to 13 September 2025 at Jeddah Superdome. It will be the first dedicated B2B gem & jewellery show in the Kingdom of Saudi Arabia. Two curtain raiser events have been held in Jeddah on 6 July and Riyadh on July 8, 2025 with the support of the Ministry of Commerce & Industry, Government of India, the Embassy of India in Riyadh; the Consulate General of India in Jeddah; and the Dubai Jewellery Group.
'SAJEX, positioned as 'The World Gem and Jewellery Fair,' marks the beginning of a long-term partnership between India and Saudi Arabia in the jewellery sector,' GJEPC said.
India, as the global hub for jewellery manufacturing, will showcase its craftsmanship, design, and manufacturing expertise at this platform which will feature over 200 leading exhibitors across over 250 booths from India, Saudi Arabia, UAE, Turkey, Hong Kong, and Lebanon.
The event will witness over 2,000 international buyers, and the product showcase will span diamond and coloured gemstone-studded jewellery, 18kt, 21kt, and 22kt plain gold jewellery, platinum jewellery, lab-grown diamond jewellery, gifting collections, along with latest jewellery technology.
Suhel Ajaz Khan, Ambassador of India to the Kingdom of Saudi Arabia said, 'India and Saudi Arabia share a strategic and deep-rooted relationship, and SAJEX reflects this evolving bond. This initiative opens new avenues for bilateral partnerships, drives cultural exchange through craftsmanship, and contributes meaningfully to Saudi Arabia's Vision 2030 goals.'
Fahad Ahmed Khan Suri, Consul General of India in Jeddah said, 'SAJEX 2025 is more than just an exhibition — it is a symbol of the growing partnership between India and Saudi Arabia.'
Kirit Bhansali, Chairman, GJEPC, said, 'With India as a leading global supplier of gems and jewellery, exporting $32 billion annually, and Saudi Arabia's jewellery market projected to nearly double to $8.34 billion by 2030, this partnership is set to reshape the industry and set new benchmarks for collaboration, innovation, and growth across the region and beyond.'
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
14 hours ago
- Time of India
10-year low for new coal mines masks climate risk of planned projects
Due to a robust slate of planned projects that would jeopardise global targets to cut greenhouse gas emissions, finds a new report by energy think tank Global Energy Monitor (GEM) 'Still digging 2025: Tracking global coal mine proposals'. The report estimates that new coal mine proposals could emit as much as 15.7 million tonnes of methane emissions or about 1.3 billion tonnes of carbon dioxide equivalent (CO2e). Although the new analysis notes a 46 per cent decline in new coal mine additions for 2024 compared to 2023, new coal mine proposals on the table for close to 2,270 million tonnes per annum of coal production capacity could risk global net zero targets. China, India, Australia and Russia comprise nearly 90 per cent, 1,942 million tonnes per annum (Mtpa) of all proposed mine developments globally, with a majority (1,350 Mtpa) of this capacity located in China. India ranks a distant second globally in proposed coal mining capacity, with 329 Mtpa currently under development. Of this, 163 Mtpa remains in the early planning stage. Approximately 90 Mtpa has been permitted, and 75 Mtpa is already under construction. Although the rollout has slowed, the decline falls short of what is necessary to align with the Paris Agreement . When fully developed, these mines would emit an estimated 15.7 million tonnes of methane annually. Without an adequate mitigation plan, these proposed coal mine projects would keep methane emissions well above net-zero targets. Data in the Global Coal Mine Tracker show production capacity at newly operating mines totalled 105 million tonnes (Mt) in 2024, marking the lowest level since 2014 and a 46 per cent decline from 193 Mt in 2023. The decline is largely attributed to India and China, where the slowdown was marked by delays in expansion approvals, the inherently lengthy nature of coal mine development phases, and a potential easing of supply pressures following a surge in capacity additions over the previous two years. However, coal developers are once again ramping up production plans, pursuing over 850 new mines, expansions, and recommission projects across 30 countries. Thirty-five mine extension projects are also under consideration. Nearly 90 per cent of this proposed capacity is located within just a few countries. China leads by a wide margin, accounting for 1,350 million tonnes per annum (Mtpa) of proposed capacity. India follows with 329 Mtpa. Australia ranks third with 165 Mtpa, while Russia and South Africa also host significant developments, at approximately 98 Mtpa and 73 Mtpa, respectively. In total, 2,270 Mtpa of coal mine capacity is under development worldwide, posing a significant risk of increased methane emissions, a potent greenhouse gas with over 80 times the warming potential of carbon dioxide over a 20-year period. Without abatement measures, methane emissions from proposed coal mines would add to the already substantial emissions from existing operations—currently estimated by GEM at 58.9 Mt annually. This rise in proposed coal mine capacity also contradicts scenarios from international bodies to cut mine output in order to align with the goals of the Paris Agreement on climate change . The International Energy Agency and United Nations have both proposed cuts to production at coal mines ranging from 39 per cent to 75 per cent by 2030, compared to 2020 production levels of roughly 7,607 Mt. The current pipeline of coal mines in development would only widen this gap. Dorothy Mei, Project Manager of the Global Coal Mine Tracker at Global Energy Monitor, said, 'The canary is literally and figuratively in the coal mine. Without drastically scaling back plans for new mine capacity, the world could see a massive rise in potent methane emissions that would make it all but impossible to reach the goals of the Paris Agreement.'


Time of India
15 hours ago
- Time of India
Saudi Arabia raises Saudization goals again, targets now as high as 80% in some sectors
Private firms with five-plus employees in pharmacy and engineering roles, and three in dentistry, must meet new Saudization rates/Representative Image TL;DR: From July 27, 2025, Saudization rates rise across pharmacy (35–65%), dentistry (starts at 45%), and technical engineering (30%) sectors in Saudi Arabia. Updated quotas apply to private-sector establishments with specified company sizes and minimum salary thresholds (SAR 7,000–9,000). The reform is backed by incentives and procedural guidance issued by the Ministry of Human Resources and Social Development ( MHRSD ) to meet Vision 2030 goals. As part of its Vision 2030 employment initiative, Saudi Arabia's Ministry of Human Resources and Social Development (MHRSD) has raised Saudization targets in healthcare and technical engineering sectors. The updated quotas took effect on July 27, 2025, covering professions such as pharmacy, dentistry, technical engineering, and accounting impacting 269 roles across entities nationwide. Sectoral breakdown of new Saudization rates 1. Pharmacy 35% for community pharmacies and medical centres 65% for hospital pharmacy operations 55% for other pharmacy-related roles Mandates apply to establishments with five or more pharmacy staff, requiring a minimum monthly salary of SAR 7,000 per Saudi employee as per Saudi Gazette. 2. Dentistry 45% Saudization from July 27, rising to 55% in mid-2026 Applies to facilities with three or more dentists, with an entry threshold salary of SAR 9,000 per month for quota counting. 3. Technical Engineering 30% Saudization required in establishments with five or more technical engineers, effective July 27, 2025 Minimum salary requirement: SAR 5,000 per month. Healthcare professions (Earlier phase) As of April 17, 2025, Saudization rates for four health professions were enforced: Radiology: 65% Medical lab: 70% Therapeutic nutrition: 80% Physiotherapy: 80% These apply initially in major cities, expanding nationwide by October 17. Minimum wages: SAR 7,000 for specialists, SAR 5,000 for technicians. Implementation mechanisms & support MHRSD has released procedural guides and compliance instructions on its official website to clarify employer obligations, quota calculations, and penalties. Independent supervisory agencies oversee sector compliance: Ministry of Health for pharmacy & dentistry Ministry of Municipal Affairs & Housing for engineering roles. Eligible companies can utilize Human Resources Development Fund (HADAF) programs for recruitment, training, and retention of Saudi talent. Why this matters Accelerates Saudi employment : Focuses localization on strategic, skilled roles that historically relied on foreign workers. Supports Vision 2030 goals : Saudization policies are key to reducing unemployment, increasing national workforce participation and diversifying the economy. Incentivises compliance : Penalties for non-adherence are balanced by support programs to ease transition. Saudi Arabia's updated Saudization targets signify a decisive step toward greater national workforce engagement in high-value sectors. With quotas now enforced in pharmacy, dentistry, engineering, and healthcare, employers must restructure recruitment practices quickly and strategically. Backed by Vision 2030 and supported by HRSD through practical guidance and financial incentives, these measures are poised to reshape private-sector employment while maintaining regulatory compliance and market competitiveness. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Taylor Swift Goes Natural, Here's How She Really Looks The Noodle Box Undo FAQ 1. When do these changes take effect? Pharmacy, dentistry, and engineering quotas begin July 27, 2025, with dental quotas rising further in 2026. Healthcare professions launched earlier on April 17, 2025,expanding nationwide by October. 2. Which sectors are impacted? 269 roles across pharmacy, dentistry, medical laboratories, physiotherapy, therapeutic nutrition, accounting, and technical engineering. 3. What penalties exist for non-compliance? Firms can face Fines and non-renewal of licenses, enforced by HRSD and partner ministries. 4. Are there salary thresholds for inclusion? Yes, roles must meet minimum monthly salary levels (SAR 7,000–9,000) to count toward Saudization quotas. 5. How does this tie into national strategy? Saudization is central to Vision 2030, aimed at reducing unemployment (now at ~7.1%, below original 8% target) and expanding Saudi private-sector participation.


Time of India
18 hours ago
- Time of India
10-year low for new coal mines masks climate risk of planned projects
BATHINDA: Newly-opened coal mine capacity in 2024 hit the lowest level in a decade, but the downturn could be short-lived due to a robust slate of planned projects that would jeopardise global targets to cut greenhouse gas emissions, finds a new report by energy think tank Global Energy Monitor (GEM) 'Still digging 2025: Tracking global coal mine proposals'. Tired of too many ads? go ad free now The report estimates that new coal mine proposals could emit as much as 15.7 million tonnes of methane emissions or about 1.3 billion tonnes of carbon dioxide equivalent (CO2e). Although the new analysis notes a 46% decline in new coal mine additions for 2024 compared to 2023, new coal mine proposals on the table for close to 2,270 million tonnes per annum of coal production capacity could risk global net zero targets. China, India, Australia and Russia comprise nearly 90%, 1,942 million tonnes per annum (Mtpa) of all proposed mine developments globally, with a majority (1,350 Mtpa) of this capacity located in China. India ranks a distant second globally in proposed coal mining capacity, with 329 Mtpa currently under development. Of this, 163 Mtpa remains in the early planning stage. Approximately 90 Mtpa has been permitted, and 75 Mtpa is already under construction. Although the rollout has slowed, the decline falls short of what is necessary to align with the Paris Agreement. When fully developed, these mines would emit an estimated 15.7 million tonnes of methane annually. Without an adequate mitigation plan, these proposed coal mine projects would keep methane emissions well above net-zero targets. Data in the Global Coal Mine Tracker show production capacity at newly operating mines totalled 105 million tonnes (Mt) in 2024, marking the lowest level since 2014 and a 46% decline from 193 Mt in 2023. Tired of too many ads? go ad free now The decline is largely attributed to India and China, where the slowdown was marked by delays in expansion approvals, the inherently lengthy nature of coal mine development phases, and a potential easing of supply pressures following a surge in capacity additions over the previous two years. However, coal developers are once again ramping up production plans, pursuing over 850 new mines, expansions, and recommission projects across 30 countries. Thirty-five mine extension projects are also under consideration. Nearly 90% of this proposed capacity is located within just a few countries. China leads by a wide margin, accounting for 1,350 million tonnes per annum (Mtpa) of proposed capacity. India follows with 329 Mtpa. Australia ranks third with 165 Mtpa, while Russia and South Africa also host significant developments, at approximately 98 Mtpa and 73 Mtpa, respectively. In total, 2,270 Mtpa of coal mine capacity is under development worldwide, posing a significant risk of increased methane emissions, a potent greenhouse gas with over 80 times the warming potential of carbon dioxide over a 20-year period. Without abatement measures, methane emissions from proposed coal mines would add to the already substantial emissions from existing operations—currently estimated by GEM at 58.9 Mt annually. This rise in proposed coal mine capacity also contradicts scenarios from international bodies to cut mine output in order to align with the goals of the Paris Agreement on climate change. The International Energy Agency and United Nations have both proposed cuts to production at coal mines ranging from 39% to 75% by 2030, compared to 2020 production levels of roughly 7,607 Mt. The current pipeline of coal mines in development would only widen this gap. Dorothy Mei, Project Manager of the Global Coal Mine Tracker at Global Energy Monitor, said, 'The canary is literally and figuratively in the coal mine. Without drastically scaling back plans for new mine capacity, the world could see a massive rise in potent methane emissions that would make it all but impossible to reach the goals of the Paris Agreement.'