logo
2 GDA officials booked for demanding bribe; 1 held

2 GDA officials booked for demanding bribe; 1 held

Hindustan Times2 days ago

A supervisor of the Ghaziabad development authority (GDA) has been held for allegedly demanding ₹2 lakh as bribe from a resident for approving construction of a private building in Muradnagar. Police said the anti-corruption team from Meerut, who nabbed the supervisor, has filed an FIR against him along with a junior engineer (JE). The bribe was allegedly demanded on behalf of the JE.
The incident came to light on a complaint by Muradnagar resident Surendra Kumar who bought a property on Rawli Road in November 2024 and later constructed a basement and some pillars. Kumar alleged that on May 28, the JE and the supervisor came to the site and asked him to stop work till some talks were held. When the complainant requested them to allow the construction, they demanded ₹2 lakh, without any negotiation, Kumar told the anti-corruption unit.
The FIR in this connection was lodged at Muradnagar police station under relevant sections of the Prevention of Corruption Act, 1988, and named supervisor Raj Kumar and junior engineer Ajit Kumar, as suspects.
The inquiry, prima facie, found that the allegations by the complainant were correct.
The investigating team planned to lay a trap and catch the suspects red-handed. On June 2, the supervisor arrived at a designated place in Muradnagar, and the complainant handed him a bag containing the money in cash. While the supervisor was taking the money from Kumar, the team nabbed him.
Investigators said he told them that he was collecting the amount as told by the JE as he left to attend some family emergency. 'The FIR names the supervisor and the JE, and the supervisor was arrested by the team of the anti-corruption unit. They also filed the FIR and will take up further investigation in the case,' Surendra Nath Tiwary, deputy commissioner of police (DCP) of rural zone, said.
When asked to comment on the allegations, GDA said the act by the staff has dented the image of the authority. 'In connection with the incident, the supervisor has been suspended with immediate effect, and a team will also take up disciplinary action and an inquiry. Meanwhile, senior officials have sought a report about allegations against the JE and will soon apprise the state government about the matter. Further required action will also be taken up,' Rudresh Shukla, media coordinator of GDA, said.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

CPI MP writes to president alleging misuse of governor's office in opposition-ruled states
CPI MP writes to president alleging misuse of governor's office in opposition-ruled states

Hindustan Times

time42 minutes ago

  • Hindustan Times

CPI MP writes to president alleging misuse of governor's office in opposition-ruled states

New Delhi, CPI Rajya Sabha MP P Sandosh Kumar on Friday wrote to President Droupadi Murmu alleging "misuse' of gubernatorial authority in the opposition-ruled states. Mentioning a recent incident in Kerala where a portrait of 'Bharat Mata' was used at an event at the Raj Bhavan, leading to a boycott of the function by a state minister, Kumar expressed serious concern over the "continued misuse of gubernatorial authority in the opposition-ruled states". Kumar said it was most recently reflected in the conduct of the Kerala governor during the Environment Day celebrations at the Raj Bhavan, where a "particular version of the Bharat Mata image" was displayed without consulting the state government. "The arbitrary imposition of a particular version of the Bharat Mata image – without consultation with the elected government – forced Agriculture Minister P Prasad to boycott the event," Kumar said. Claiming that it was not an isolated episode, the CPI leader said, 'We are witnessing a pattern where governors in states like Kerala and Tamil Nadu repeatedly act as political agents, converting Raj Bhavans into ideological outposts of the RSS, disregarding constitutional norms, federal principles and the mandate of democratically elected governments.' He alleged that the Kerala incident also "potentially contravened" the Emblems and Names Act, 1950, and the Prevention of Insults to National Honour Act, 1971, "by misusing national symbols for political or sectarian purposes". "The Bharat Mata image, originally envisioned by Abanindranath Tagore during the Swadeshi movement as a unifying emblem of anti-colonial resistance, has in recent years been altered and weaponised by an organisation notorious for its divisive politics. 'It is unacceptable that such reimagined and controversial symbols are now being forced upon official functions and public institutions, further polarising our society," Kumar alleged. The CPI leader urged the president to "take serious note of this trend and take immediate steps to ensure that governors do not overstep their constitutional mandate". The presence of a Bharat Mata portrait, allegedly associated with RSS 'shakhas', at a World Environment Day event at the Raj Bhavan in Thiruvananthapuram on Thursday led to the state government boycotting the programme. Kerala Agriculture Minister P Prasad, who boycotted the event, said while the state government respects Bharat Mata, using an image commonly associated with RSS 'shakhas' for an official function at the Raj Bhavan was 'unconstitutional'. In a statement issued by the Raj Bhavan, Governor Rajendra Vishwanath Arlekar said, "Whatever be the pressure from whichever quarters, there will be no compromise whatsoever on Bharat Mata."

USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India's longest railway tunnel: Senior Railway Official
USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India's longest railway tunnel: Senior Railway Official

India Gazette

time2 hours ago

  • India Gazette

USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India's longest railway tunnel: Senior Railway Official

Reasi (Jammu and Kashmir) [India], June 6 (ANI): The 272-kilometre-long Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, set to be inaugurated by Prime Minister Narendra Modi, is an electrified railway corridor that features 36 tunnels and 943 bridges. A key highlight is the Katra-Banihal section, where 97.42 km of the 111-km stretch passes either through tunnels or over bridges. This section also includes the T-50 tunnel, which, at around 13 km, is the longest railway tunnel in India. Speaking to ANI, Dilip Kumar, the Executive Director of Information and Publicity, Railway Board, stated that in the USBRL Project, the Katra-Banihal section, spanning over 111 kilometres, alone contains tunnels and bridges in the area of 97.42 km. 'Today, PM will dedicate the USBRL (Udhampur-Srinagar-Baramulla Rail Link) project to the nation. Besides this, PM will also inaugurate two important bridges, the world's highest railway arch bridge - Chenab bridge and India's first cable-stayed rail bridge, Anji bridge... This is a 272 km project, an electrified project under which we have built 36 tunnels, 943 bridges. The Katra-Banihal section will be especially known for bridges and tunnels because 97.42 km of this 111-km section will pass through either a bridge or a tunnel. This also has the longest tunnel of Indian railways, T50 - it is around 13 km in length,' Kumar said. He further said the Chenab Railway Bridge, which will also be inaugurated by the Prime Minister, is 359 metres high--35 metres taller than the Eiffel Tower. Describing the engineering significance of both bridges, Kumar said they have been specially designed to withstand earthquakes and strong winds. He said, 'The bridge across Chenab River is a historic engineering marvel, we have surpassed the Eiffel Tower (in height) and this bridge is 359 metres high... 35 metres taller than the Eiffel Tower and five times taller than Qutub Minar. A total of 29,800 metric tons of steel have been used on this bridge. It is located in seismic zone 5, but this has been built in a way that it can withstand even strong tremors. The bridge will remain intact even in strong Anji Bridge, the wind speed is around 225 kmph. So, that bridge has also been designed according to bridge has 96 cables and 849 metric tons of steel have been used in its construction, and 725 km long and 331 km high... These two bridges are unique in their own.' Explaining about the timings and facilities of the Vande Bharat trains that would also be flagged off by the Prime Minister, Kumar stated, 'The Railway has decided to ply two trains on this section (Udhampur-Srinagar-Baramulla Rail Link). Two Vande Bharat Express trains will ply from Shri Mata Vaishno Devi, Katra, to Srinagar every day. One train will leave at 8.10 am and the other at 1455 hours (2.55 pm). The train that leaves at 8.10 am will pass through Banihal and reach Srinagar around 11.10 am - in about 3 hours. The train that leaves at 1455 hours (2.55 pm) will reach Srinagar at 6 pm. Speaking of the opposite direction, the 26404 train will leave from Srinagar at 8 am every day and it will reach Shri Mata Vaishno Devi, Katra Station. The other train will leave at 2 pm from Srinagar and reach Shri Mata Vaishno Devi at 1705 hours (5:05 pm) every day. There will be eight coaches in the train, including executive class and chair car...' He praised the Modi government's efforts to improve railway connectivity in remote regions such as Jammu and Kashmir and the Northeast. He stated, 'If we speak of the Railway, in the last 11 years, several important projects have been completed. It is the vision of the PM to complete a project at the earliest when its foundation stone is laid. We are working as per that vision. This vision is reflected in the Pamban Bridge and the USBRL project. We are also working to connect the entire northeast, work to lay down a railway line till Aizawl, and the movement of trains will begin soon. Similarly, work is going on in the Sikkim project too. We have constructed a different tunnel to connect Karnprayag, which will turn out to be longer than T50. So, we are working simultaneously on remote and border areas where there was no railway connectivity until recently...' The PM is all set to flag off the Vande Bharat Express today on the Udhampur-Srinagar-Baramulla Rail Link (USBRL) from Katra to Srinagar. The 272 km long project is built at Rs 43,780 crore and includes 36 tunnels spanning 119 km and 943 bridges. The architectural marvel Chenab Rail Bridge, situated at a height of 359 meters above the river, is the world's highest railway arch bridge. It is a 1,315-metre-long steel arch bridge engineered to withstand seismic and wind conditions. A key impact of the bridge will be in enhancing connectivity between Jammu and Srinagar. Through the Vande Bharat train moving on the bridge, it will take just about 3 hours to travel between Katra and Srinagar, reducing the existing travel time by 2-3 hours. The Anji Bridge is India's first cable-stayed rail bridge that will serve the nation in a challenging terrain. The Prime Minister will also dedicate the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project to the nation. The 272 km long USBRL project, constructed worth around Rs 43,780 crore, includes 36 tunnels (spanning 119 km) and 943 bridges. The project establishes all-weather, seamless rail connectivity between the Kashmir Valley and the rest of the country, aiming to transform regional mobility and drive socio-economic integration. The Prime Minister will also flag off two Vande Bharat Express trains from Shri Mata Vaishno Devi Katra to Srinagar and back. They will offer a swift, comfortable, and reliable travel option for residents, tourists, and pilgrims, among others. (ANI)

Delhi court acquits former coal secy HC Gupta, 2 senior officials over Jharkhand block allocation ‘scam'
Delhi court acquits former coal secy HC Gupta, 2 senior officials over Jharkhand block allocation ‘scam'

Indian Express

time2 hours ago

  • Indian Express

Delhi court acquits former coal secy HC Gupta, 2 senior officials over Jharkhand block allocation ‘scam'

A Delhi court Friday acquitted former coal ministry officials H C Gupta (secretary), K S Kropha (joint secretary) and K C Samaria (coal allocation director) in a case linked to alleged irregularities in the allocation of the Mahuagarhi coal block in Jharkhand to the company M/s Jas Infrastructure Capital Pvt Ltd (JICPL). While the three men – represented by advocates Rahul Tyagi and Mathew M Phillip – were acquitted, Special Judge Sanjay Bansal of Rouse Avenue Court convicted the firm JICPL and its director Manoj Kumar Jayaswal. Arguments on their sentence will be heard on July 8. The allegations in the case were that JICPL had misrepresented various facts in its application and had fraudulently obtained the allocation of the coal block. Allegations against the public servants were that they had acted in a manner which was 'detrimental' to public interest and that they had allowed JICPL to 'misappropriate' nationalised natural resources. In December 2016, a trial court in Delhi had framed charges in this case for alleged offences under sections 420 (cheating), 468 (forgery for the purpose of cheating), 120 B (criminal conspiracy) of the Indian Penal Code (IPC) and under relevant provisions of the Prevention of Corruption Act. Initially, the Central Bureau of Investigation (CBI) had filed a closure report in this case in April 2014, stating that no case was made out against the accused. A detailed closure report was filed on October 14, 2014. The court had on November 20 that year disagreed with the CBI's conclusion and held that a case was made out for taking cognisance of the alleged offences against the accused. A Delhi court had in 2018 sentenced Gupta, Kropha and Samaria to three years' imprisonment in a case pertaining to alleged irregularities in the allocation of Moira and Madhujore (North and South) coal blocks in West Bengal to Vikash Metal and Powers Ltd. In 2017, the three were convicted in a case related to irregularities in the allocation of Thesgora-B Rudrapuri coal block in Madhya Pradesh to Kamal Sponge Steel and Power Ltd (KSSPL). Towards the end of its tenure, the UPA 2 government started being perceived as corrupt due to allegations connected with the 'coal scam'. A Comptroller and Auditor General (CAG) report had at the time pegged the loss to the exchequer at Rs 1.8 lakh crore. While 27 of the 54 cases being investigated by the CBI have been disposed of, the other half are still pending a decade later. With this case, the CBI has achieved 19 convictions. Three of its cases have ended in acquittals and two in discharge. In the aftermath of the alleged coal scam, on August 25, 2014, the Supreme Court cancelled the allocation of 204 coal blocks, deeming them illegal and arbitrary. Additionally, it also levied a penalty of Rs 295 per tonne of coal that had already been mined over the years. In his book titled Supreme Court and the Indian Economy, Pradeep S Mehta states that the apex court's decision increased the current account deficit by US$ 700 million due to additional coal imports. 'Around Rs 4.4 lakh crore was the estimated loss in royalty, cess, direct and indirect taxes, etc,' wrote Mehta, citing an SBI research report. Former Solicitor General of India Harish Salve had stated that the decision cost the economy 1 per cent of the GDP.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store