Nirmala Sitharaman backed consumption over capex. But guess who's making billions
Four months after Finance Minister Nirmala Sitharaman's Union Budget appeared to pivot policy focus towards consumption, the real winners in the market have emerged from an unlikely corner: capital goods.
ADVERTISEMENT Despite a budget speech that dialed back aggressive infrastructure spending in favour of easing middle-class tax burdens and supporting household demand, capital expenditure stocks have not only held their ground but have outperformed. The BSE Capital Goods Index has soared 10% since Budget Day, trouncing the Nifty India Consumption Index, which managed a muted 3% rise, and even outperformed the Nifty 50's 5% climb.
The rally in capital goods stocks has added a staggering Rs 1.85 lakh crore in market value. Leading the pack is Hitachi Energy India, with a 54% surge. Defence heavyweights like Bharat Dynamics (up 49%), BEL (33%), and HAL (26%) have also posted stellar returns. Other notable gainers include Schaeffler India, BHEL, Kaynes Tech, SKF India, GMR Airports, Suzlon Energy, and Inox Wind—all of which have clocked double-digit gains.
Meanwhile, the consumption story hasn't lived up to the Budget's optimism. The Nifty India Consumption Index has underperformed broader markets. Varun Beverages and Colgate-Palmolive have posted double-digit declines.'The mix of cheaper starting prices, accelerating earnings, and stronger order pipelines explains why capital goods stocks have outperformed consumption,' Anoop Vijaykumar, Head of Equity at Capitalmind Mutual Fund told ET Markets.He pointed to multi-year high order books at engineering firms and the RBI's OBICUS survey showing manufacturing capacity utilisation at 75.4% in Q3 FY25—the highest in six years—as signs that the industrial engine is firing on all cylinders.
ADVERTISEMENT
Also read | Sensex will hit 1.5 lakh by 2030 & 3 lakh by 2035! Raamdeo Agrawal makes big prediction
'Policy support for railways, defence, renewables and the PLI 2.0 schemes has not slowed; these programmes are multi-year and continue. Meanwhile, the consumption complex faces a softer near-term backdrop: rural volumes are only just turning positive, urban discretionary demand is normalising after two strong years, and the sector entered Budget season on richer valuations,' Vijaykumar added.
ADVERTISEMENT Dhiraj Relli, MD & CEO of HDFC Securities, echoed the sentiment, calling the capital expenditure revival a "multi-year" phenomenon. 'Between FY21 and FY25E, private sector capex has grown at 19.8% CAGR. The momentum is likely to intensify in FY26, driven by domestic manufacturing, continued government infrastructure initiatives, and healthy corporate balance sheets,' he said.On the flip side, Relli flagged that consumption faces headwinds from 'sluggish urban demand, delayed rural recovery, and persistent inflation.' While tax reductions and early signs of rural revival offer a glimmer of hope, margin pressure and steep valuations may limit upside.
ADVERTISEMENT So is the capex story here to stay? Vijaykumar believes it is. 'The central government has already budgeted over Rs 11 lakh crore of infrastructure spending for FY26, while states and CPSEs have pencilled in similar growth. Private sector intent is also strengthening with new project announcements rising in double digits,' he said. With healthy corporate balance sheets and a banking system ready to fund fresh investments, 'the investment cycle is broadening rather than peaking.'Venugopal Manghat, CIO – Equity at HSBC Mutual Fund, is selectively bullish within capex. 'We like power, manufacturing and defence over roads and railways. Ongoing liquidity infusion by RBI, expected rate cuts, and regulatory easing should support NBFCs and banks,' he noted.On the consumption front, Manghat is cautious on staples. 'The sector has seen disruption from tech and new formats. With higher disposable incomes, households are shifting toward aspirational and discretionary spending,' he said. He sees greater opportunity in small-cap consumer discretionary plays, citing low penetration and a large unorganised-to-organised transition in the space.
ADVERTISEMENT The scorecard since the Budget is clear: while policy seemed to back the consumer, the market has placed its bets on industrial India. And for now, capex is delivering the returns.
Also read | Neither largecaps, nor smallcaps! India Inc's Q4 result season belongs to the middle order
(Disclaimer: Recommendations, suggestions, views and opinions given by the experts are their own. These do not represent the views of the Economic Times)
(You can now subscribe to our ETMarkets WhatsApp channel)
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
3 hours ago
- Time of India
BEL joins Tata Electronics to develop indigenous electronics, chip solutions
New Delhi: In line with the government's vision for self-reliance, navratna defence PSU Bharat Electronics Limited (BEL) on Friday announced a collaboration with Tata Electronics towards the development of indigenous electronics and semiconductor solutions. The memorandum of understanding (MoU) is a significant step forward for BEL and Tata Electronics in jointly exploring end-to-end solutions to meet domestic requirements., BEL said in a stock exchange filing. BEL and Tata Electronics will explore end-to-end collaboration in areas such as semiconductor fabrication (Fab), Outsourced Semiconductor Assembly and Test (OSAT), and design services. The goal is to meet BEL's present and future needs for advanced components, including Microcontrollers (MCUs), Systems-on-Chip (SoCs), Monolithic Microwave Integrated Circuits (MMICs), and other processors. The MoU was signed by Manoj Jain, Chairman and Managing Director, BEL, and Randhir Thakur, CEO and Managing Director, Tata Electronics, at Bombay House, Tata Group's headquarters in Mumbai. Both companies will also endeavour to develop optimum manufacturing solutions for BEL's products through knowledge sharing, best practices and other resources. Tata Electronics is a prominent global player in the electronics manufacturing industry with fast-emerging capabilities in Electronics Manufacturing Services, Semiconductor Assembly and Test, Semiconductor Foundry, and Design Services. Meanwhile, BEL reported an 18 per cent growth in net profit to Rs 2,127 crore for the January-March quarter of financial year 2024-25 compared with the corresponding figure of Rs 1,797 crore in the same period of the previous year. The company's revenue from operations came in at Rs 9,150 crore, which was a 7 per cent increase over the Rs 8,564 crore reported in the same period of the previous financial year. BEL's board of directors have recommended a final dividend of Rs 0.90 per equity share for the financial year 2024-25. In April, the defence PSU signed a contract with the Indian Air Force valued at Rs 593.22 crore for providing maintenance services for the Akash Missile System to kick off the new financial year 2025-26.


News18
11 hours ago
- News18
DA Arrears: When Will Central Govt Employees Receive 18-Month Frozen Amount?
Last Updated: The arrears pertain to 3 installments of DA hikes -- spanning the period from January 2020-June 2021 -- which were frozen as part of fiscal tightening measures during the pandemic. DA Hike: The long-standing demand for the restoration of 18 months of dearness allowance (DA) and dearness relief (DR) arrears has once again come to the forefront, as central government employees continue to press for the release of the frozen dues. The issue was raised afresh during the 63rd meeting of the Standing Committee of the National Council of the Joint Consultative Machinery (NC-JCM), held on April 23, 2025. The staff side of the NC-JCM strongly reiterated its demand for the payment of arrears that were withheld during the COVID-19 pandemic. The arrears pertain to three installments of DA/DR hikes — spanning the period from January 2020 to June 2021 — which were frozen as part of fiscal tightening measures during the nationwide crisis. The government has maintained that the fiscal burden resulting from the pandemic and various financial welfare schemes introduced during the crisis made it infeasible to release the withheld amount. The government noted that the economic fallout of COVID-19 extended beyond FY 2020-21, impacting budgetary decisions in subsequent years. This is not the first time that the staff side has raised the issue. Ahead of the Union Budget 2025, representatives of the NC-JCM had written to Finance Minister Nirmala Sitharaman, urging the government to consider releasing the pending arrears, citing both financial justice and rising living costs for employees and pensioners. DA Revision Mechanism Disrupted During COVID-19 Under normal circumstances, DA for government employees and DR for pensioners are revised twice a year—in January and July — based on changes in the Consumer Price Index (CPI). However, amid the uncertainty caused by COVID-19, the government froze DA hikes for 18 months, impacting nearly 50 lakh central government employees and over 60 lakh pensioners. Although DA hikes were resumed from July 2021 onwards, the frozen installments were never retrospectively paid, leading to consistent demands for their restoration by employee unions and staff federations. 8th Pay Commission Formed, But Clarity Awaits The demand for arrears has gained further attention in light of the government's approval of the 8th Pay Commission in January 2025. Scheduled to be implemented from January 1, 2026, the Commission is expected to overhaul salary, pension, and allowance structures for central government employees. However, despite its approval, the Commission's Terms of Reference (ToR) and the official appointment of its members are still pending. This has added to the uncertainty over whether employee concerns — including the unresolved DA arrears — will find a place in the new Commission's mandate. 'We expect the Terms of Reference to get the government's nod soon. It should be approved at the earliest," Shiv Gopal Mishra, secretary of the Staff Side of NC-JCM, has said in a recent statement to NDTV Profit. No Timeline Yet for Arrears Restoration While the demand for the release of DA/DR arrears continues to gather steam, no official commitment or timeline has been announced by the government so far. For now, employee unions remain hopeful that the matter will be addressed either through the 8th Pay Commission process or via separate financial consideration by the Centre. Until then, the 18-month DA/DR freeze remains an unresolved chapter in the post-pandemic financial landscape for lakhs of central government employees and pensioners. First Published: June 06, 2025, 14:49 IST


India.com
11 hours ago
- India.com
Rs 21700 crore weapon: India to get much stronger as this project..., bad news for Pakistan, China due to...
Rs 21700 crore weapon: India to get much stronger as this project..., bad news for Pakistan, China due to... A leading Indian defence company — Bharat Electronics Limited (BEL), known for making Akashteer — is once again making headlines by playing a crucial role in Project Kusha – an initiative to develop a powerful air defence system like the Russian-made S-400. The ambitious project aims to neutralise aerial threats like missiles, suicide drones, and aircraft attacks. Notably, Project Kusha is led by the Defence Research and Development Organisation (DRDO). As a development partner, BEL is working closely with the DRDO and sharing its insights to the design and production of crucial subsystems like – radars and control systems. BEL Chairman and Managing Director Manoj Jain, during the company's March quarter earnings call, confirmed that BEL is jointly developing several components of Project Kusha. 'We are jointly developing many components of Project Kusha,' he said. Project Kusha: Prototype Phase To Begin Soon As per reports, the prototype phase of Project Kusha is likely to begin in the coming months with BEL is working to build the first working model within 12-18 months. Once developed, the system will undergo severe trials and testing which will take 1-3 years. A decision on the system integrator(s) is yet to be made. BEL expressed confidence in their selection, should the authorities opt for two integrators. Project Kusha is designed to fill the gap between India's MR-SAM (Medium-Range Surface-to-Air Missile), and Russian-made S-400. MR-SAM has a range of 80 km, whereas S-400 covers up to 400 km. Project Kusha: Three Types Of Interceptor Missiles India plans to deploy a three-tiered missile defence system by 2028-2029. This system will comprise interceptor missiles with ranges of 150km, 250km, and 350km, intended for use by both the Indian Air Force and Navy. Project Kusha: Standout Feature Kusha's major feature includes its ability to intercept high-speed anti-ship ballistic missiles (ASBMs) which can travel at speeds of Mach 7, as per a report by Project Kusha: High-Speed Naval Defence Project Kusha's key feature is a naval adaptation of the M2 missile, capable of intercepting anti-ship ballistic missiles (ASBMs) travelling at speeds up to Mach 7 (approximately 8,645 km/h). This capability provides crucial protection for naval vessels against high-speed, sea-based missile attacks. Project Kusha: Strengthening India's Air Defence Another key feature of the project includes its ability to work smoothly with existing systems such as IAF's Integrated Air Command and Control System (IACCS) and Russian made S-400 missile system. Project Kusha can achieve an 80 percent single-missile kill rate. It can exceed 90 percent when using multiple missiles simultaneously. Once inducted, the system will enhance India's layered air defences against any aerial threat. Project Kusha: Budget-Backed and Battle-Ready It is worth mentioning that the project was approved by the Cabinet Committee on Security in 2022. The budget of the project was Rs 21,700 crore. The budget was sanctioned to build five squadrons for the IAF. Another major feature of the project is its naval version, which is capable of destroying anti-ship ballistic missiles (ASBMs). With this the Indian Navy will have a powerful tool to protect its frontline warships. This new system will enhance the navy's defences by complementing existing systems like Barak-8 and the Naval Ballistic Missile Defence System, creating a more robust overall defence.