
Summerside's latest budgets put cash into 'planning for growth,' with major investments
With the theme Planning for Growth, the budget gives priority to infrastructure improvements, economic development and long-term sustainability, the municipality said in a news release.
P.E.I.'s second-biggest city is projecting a balanced budget, with total revenues and expenses of $76.7 million, which includes the operation of city-owned utilities.
Capital spending has increased significantly from last year's $71.2 million, with the biggest addition — $11 million — going toward the city's East-West Housing Corridor project.
The project will eventually connect Water Street East with Ryan Street in the city's north end. Officials have said the development will ease traffic and open up enough land for developers to build up to 2,000 new housing units.
Other major infrastructure investments include:
$3.7 million for water system upgrades
$1.4 million for street resurfacing
$404,000 for fire and police equipment upgrades
$130,000 for downtown revitalization and public art initiatives
$762,000 for roof and rooftop air handling system at City Hall
$291,000 for sidewalk construction and replacement
$355,000 for boardwalk remediation
The budget is supported by key revenue sources, including $12.7 million from government transfers, $12.1 million from property taxes and $3.7 million from wind energy sales.
Summerside councillors will vote on the budget at a council meeting on March 27.
Electricity, water rates up; taxes unchanged
While property tax rates will remain the same, the combined rate for water and sewer services will increase by about 5.5 per cent, from $76.32 last year to $80.75.
Electricity rates have also gone up in line with an increase in Maritime Electric rates that took effect March 1. Domestic service has a $24.57 monthly service charge and energy rates of $0.1723 per kWh for the first 2000 kWh and $0.1375 per kWh for the remainder.
Investment in Summerside Electric
Meanwhile, the city continues to reinvest in its own electrical utility, which generates about $31.6 million in revenue.
The Summerside grid will see a $4.6 million investment to enhance safety, security and reliability, as well as to ensure a sustainable and dependable power supply for residents and businesses, the news release said.
The city's power supply faced a series of challenges last month following a failure at Maritime Electric's Sherbrooke substation. While the city generates about 60 per cent of its electricity through renewable sources like solar and wind, it depends on Maritime Electric's transmission grid to receive the power Summerside Eletric buys from New Brunswick Power.
A mobile transformer brought in from Newfoundland was installed to stabilize the system, but the city is calling for a permanent solution from Maritime Electric.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


National Observer
4 days ago
- National Observer
What kind of Canada do we want to build?
When the prime minister and premiers recently met in Saskatoon, it was Trump's attacks that brought them together. As wildfires forced tens of thousands to evacuate in Alberta, Saskatchewan, Manitoba and Ontario, the first ministers gathered to discuss the nation-building projects Canada needs. Driving into town through the smoke, they passed our billboards: a wildfire fighter facing a smoke-filled sky with the message 'Don't Let Canada Burn. Connect Canada's Clean Power. Build the East-West Electricity Grid. ' Crisis has a way of sharpening choices between falling back on what you know and evolving into what you can be. Canada must retool our economy to withstand US economic pressure and the escalating fossil-fuel-driven climate disasters. There are loud voices calling for us to react by building new pipelines, trampling Indigenous rights and deluding ourselves about climate pollution. Instead, we must build to last. We can strengthen our communities with clean, affordable energy. We can steward some of the world's vast remaining forests. We can cut pollution, grow good jobs that can't be offshored and build our economy on security, not volatility. The economic future will belong to countries that can supply affordable, clean power for their economies, writes Jamie Biggar In doing so, we'll position ourselves to be leaders in the clean electricity transition that's building momentum. Despite political backsliding in the US, demand for clean electricity technology is booming because it's cheaper, faster to deploy and safer for communities. In China, EV car sales grew 40 per cent in 2024 alone, and now 1 in 4 cars sold worldwide in 2025 will be electric. Global oil demand will peak this decade. According to the International Energy Association, annual global investment in clean energy and electricity infrastructure is now fully double the global investment in fossil fuels. In 2026, the $26T European Union market will introduce a carbon tariff, putting real costs on any carbon-intensive imports from countries that fall behind. The economic future will belong to countries that can supply affordable, clean power for their economies. We have a choice: invest in infrastructure that sets Canada up to thrive for the next fifty years, or double down on costly projects designed for a world that is slipping away. Clean, reliable electric power is the future because it cuts risks, costs and pollution alike. Since clean electricity is where the world is going, we are fortunate to have incredible resources and leaders across the country. Canada's largest operating battery storage facility opened in Ontario just before the first ministers' meeting — a project conceived by the Six Nations of the Grand River Development Corp, with a 70 per cent Indigenous workforce. One of the most powerful nation-building, Trump-proofing projects is an East-West electricity grid that moves clean power when it's needed. Since the 1960s, we have built our electricity grids North-South to export power to the US. We've neglected East-West connections that would unite our country and boost our economy. It's time to change that. Consider Alberta and BC. Alberta has world-class wind and solar potential. BC has massive hydroelectric capacity. Connecting their grids means clean Alberta power will flow to BC when the wind blows and the sun shines. When the wind dies down and day turns to night, then BC's power will flow back to Alberta. That's a system built to last. Nova Scotia is another case in point. The province has vast offshore wind potential — enough to send power across Eastern Canada, including the markets and manufacturing centres of Quebec. But without links between the provinces, that energy won't reach the places it's needed. This isn't just about megawatts. It's about the country we want to build. Do we want short-term projects that lock us into pollution and geopolitical risk, or long-term infrastructure that strengthens Canada's independence and economic staying power? It also means meaningful partnership with Indigenous communities whose lands and rights are too often trampled when governments rush major projects. True partnership, based on consent, is moral, constitutional and smart. It leads to better designed projects, fewer delays and shared prosperity. At its best, Canada is a country built on evolving agreements between nations — Indigenous and non-Indigenous. We can live up to that vision by ensuring Indigenous peoples are full partners in building a clean energy future — indeed, they have been leading in the field in Canada for years. Prime Minister Carney is right that we are making decisions in a 'hinge' moment for the country. We're deciding what kind of projects we will fund and fast-track. We can keep pouring public money into unneeded pipelines. Or, we can build the infrastructure to connect our clean power and secure our long-term prosperity. Don't let Canada burn. Canada needs energy that's built to last: clean, reliable and built in partnership with the communities that host it.


CTV News
7 days ago
- CTV News
Community groups rally against condo development proposed for edge of east Toronto ravine
Community groups held a rally on Aug. 11 to oppose a proposed condo development at the northern edge of Glen Stewart Ravine. Chanting 'Protect our Ravine!', dozens of east-end residents and supporters gathered along Kingston Road on Monday morning to loudly express their opposition to a development proposed for a property on the northern edge of Glen Stewart Ravine. A developer wants to build an 11-storey condominium on the site, which borders the 11-acre greenspace just west of Beech Avenue. Proposed development site near Glen Stewart Ravine Gabriele Homes Ltd. wants to build an 11-storey condo develoment at this site. Considered by many as a beauty of the Beach, Glen Stewart Ravine runs from Kingston Road to Queen Street East, between Main Street and Victoria Park Avenue. 'There is an incredible amount of biodiversity in this beautiful piece of quiet that we find in the middle of the city, and, and it's really important that we protect these spaces,' said Jennifer Pilkington, of the group Protect Our Ravines. This revised proposal comes 10 years after a smaller-scale version was first submitted to the city. The developer, Gabriele Homes Ltd., now wants to construct 99 housing units and ground-level retail. The proposed project is five storeys higher than the six permitted as of right, and is without the standard setback on the ravine side. Glen Stewart Ravine development proposal Gabriele Homes Ltd. wants to build an 11-storey condo development at the northern edge of Glen Stewart Ravine. 'It'll set a precedent for every other developer that wants to encroach on our ravines and public spaces. … there has to be a line drawn somewhere,' added Floyd Ruskin, also from Protect Our Ravines. Group member Michael Genin said the developer is 'so off base' with what they're proposing, and it has 'really riled up a lot of people.' This week, the city will be sitting down with Gabriele Homes Ltd. and Toronto and Region Conservation Authority for the first of three mediation sessions. The goal is to broker an agreement on the application, which will otherwise go to an Ontario Land Tribunal hearing next year at the request of the developer. 'We requested mediation to facilitate a collaborative discussion to respond to City Staff's and the communities' concerns. We feel this is the best way to manage ecological integrity and sensitivities of this development while generating new homes to help address our cities housing crisis,' Gabriele Homes Ltd. told CTV News Toronto in a written statement. Glen Stewart Ravine condo rally Community groups held a rally on Aug. 11 to oppose a proposed condo development at the northern edge of Glen Stewart Ravine. Beaches-East York Coun. Brad Bradford, meanwhile, said 'balancing with the ecological integrity of the Glen Stewart ravine is very important.' 'That's why there's policies in place from the Toronto Region Conservation Authority that dictates setbacks from the ravine to protect it. That's going to be very important, as this application works through the cycle to make sure that we can protect those setbacks, protect the ravine, and still provide opportunities for the type of housing that we need to see here in Toronto,' he said. The Protect Our Ravines group insists they are not anti-development – just that this location is not the place for this project. With files from CTV News Toronto's Natalie Johnson


CTV News
06-08-2025
- CTV News
Saskatoon is ending the free ride at city-operated EV charging station
One of the city-operated EV charging stations that was subsidized under a pilot program. City Hall will no longer cover the cost to charge up an electric vehicle at two of its leisure centres. On Tuesday, the city's environment, utilities and corporate services committee voted to end a pilot program and begin charging users $5.35 per hour at city-operated electric vehicle (EV) charging stations at Lakewood Civic Centre and Lawson Civic Centre. 'I don't think taxpayers should be subsidizing costs on people who choose to buy a Tesla,' Ward 4 councillor Troy Davies said. The two-year pilot was launched in May 2023 with no user fees to support community EV adoption. The pilot experienced 'consistent growth in usage and received positive user feedback,' according to a city report. Get the CTV News app for Saskatoon area breaking news alerts and top stories But administrators say non-EV users voiced concerns over fairness and publicly funding the chargers for roughly $21,400 per year with no return. The report said EV drivers are often seen as more financially stable and not in need of subsidized services. 'We've completed the pilot, and now I think it's time to take the training wheels off and let it grow,' Mayor Cynthia Block said in support of charging to charge. Exceeding recommendations from administration, councillors voted to recoup all costs associated with running the stations. Administration presented five options, which ranged from stopping the program, continuing with no user fee, implementing a user fee of $2 per hour, or continuing with a fee of $3 per hour. Administration recommended a $3 per hour fee, which would recover roughly 56 per cent of the costs. But councillors went with the fifth option presented — the $5.35 per hour, fully cost recovered option. 'I'd say an average SUV for charging at $5 an hour is $40,' Davies said. 'If I'm filling up an SUV with gas, it's probably 60 to 70.' If approved by city council, the city could implement the new fee in one to two months. A report on the progress is due back in one year. The city said the pilot program resulted in an estimated reduction of about 30 tonnes of carbon dioxide.