
Horowhenua District Council Adopts Annual Plan
They say goals without plans are just wishes, which certainly rings true in Local Government.
Horowhenua District Council moved a step closer to achieving its goals for the next year when it adopted its Annual Plan and set fees and charges for 2025/26 at a Council meeting on 14 May.
The Annual Plan is Year 2 of the Long Term Plan 2024-2044, so it builds on the work and feedback Council received from the community during consultation last year. Council made the decision to not consult on the Annual Plan 2025/26 in December 2024 due to it closely following the budget and plan for year 2 of the LTP that was adopted in June 2024. The Local Government Act recognises that where Councils are sticking with the Long Term Plan and not making significant or material changes, consultation is not needed.
When talking about rates and rates increases, the analogy of a 'pie' is often used. The size of the pie represents the rates income for next year, and the slices of the pie represent the average rates increase per ratepayer. When adopting the Annual Plan on 14 May, Council agreed the size of the pie.
On 25 June, when the most up to date data on the number of rating units, valuation of new rating units and new houses is received by Council, it will set the rates and the pie will be sliced based on the total number of rating units at that date.
Confirmed in the Annual Plan is a 10.2% increase in the total rates or size of the pie, which is smaller than the 11.6% forecast in the LTP. Residents who are connected to water and wastewater services will see a higher increase as the majority of our cost increases (just over 85%) this year are related to providing water and wastewater services.
Therefore, residents who are not connected to water and wastewater services will see a much lower increase this year. Council is one step closer to giving that clarity to the community.
Rates at a property level will be agreed in June. You will be able to see your estimated rates for 2025/26 from 3 June at ratesinformation.horowhenua.govt.nz.
Mayor Bernie Wanden says the Annual Plan is an important tool for Council and the community alike as they look to the future together.
'It's a challenging process, balancing the wants and needs of the district with affordability, but we believe we have struck a good balance and we have remained committed to what we promised in the Long Term Plan,' he says.
'We've tried our absolute best to reduce the rates rise while still investing in core infrastructure and delivering a wide range of services, ensuring this remains a great place to live, work, and play.'
Council also set the fees and charges for 2025/26. Fees and charges ensure costs are fairly split between users and the rest of the community. For example, we charge for the use of a public pool to help pay for some of the costs of running it.
Legally, the proposed Food Act and Resource Management Act related fees had to be consulted on. Council asked the community for feedback on these, as well as all other proposed fees, and three submissions were received.
Minor changes to the proposed fees and charges presented to Council in December 2024 were recommended.
The entry fee for Shannon Pool was adjusted from $2.10 to $2 following community feedback. With restricted payment options available at the facility and users paying with cash, rounding the fee to a whole dollar makes it more practical and convenient for the community.
The Foxton Pools fee was changed from $5.70 to $5.60 to align with charges at the Levin Aquatic Centre.
The full list of adopted fees and charges for 2025/26 will be advertised to the public before coming into effect on 1 July 2025.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Scoop
14 hours ago
- Scoop
Consultation Underway On Proposed Model For Future Delivery Of Water Services
Press Release – Queenstown Lakes District Council QLDC Property & Infrastructure General Manager, Tony Avery said Council had carefully assessed a range of different models available, as part of central governments Local Water Done Well plan to address Aotearoa New Zealands water infrastructure … Consultation on Queenstown Lakes District Council's (QLDC) proposal to establish a Water Services Council Controlled Organisation (WSCCO) for the future delivery of water services in the district is now underway, as required by the Local Government (Water Services Preliminary Arrangements) Act 2024 (WSPA Act). The proposal is to establish a Council Controlled Organisation specifically created to manage and deliver drinking water, wastewater, and stormwater services in the future. QLDC Property & Infrastructure General Manager, Tony Avery said Council had carefully assessed a range of different models available, as part of central government's Local Water Done Well plan to address Aotearoa New Zealand's water infrastructure challenges. 'As previously shared, we wanted to ensure the model put before the public considered financial implications for consumers amongst several other factors, given the QLDC Long Term Plan (LTP) 2024-2034 is already projecting costs to increase significantly,' said Mr Avery. 'We're now encouraging residents of the Queenstown Lakes District to get involved, carefully read through the consultation document and assessments we've undertaken on the matter, and give us feedback.' The proposed WSCCO would be fully owned by QLDC, but the organisation would be governed by its own independent specialist board and management. QLDC would be the only shareholder and would appoint board members based on the skills and experience needed for proper governance of the new organisation. Intended legislation by central government would prevent any WSCCO from being privatised which means that the proposed WSCCO would remain wholly owned by QLDC, and the organisation would not be able to pay a dividend. Council would set the organisation's strategic priorities and establish measures to ensure it performs to expectations, while the Commerce Commission would use various regulatory tools to ensure water charges are fair, cost-reflective, and transparent. The other shortlisted option evaluated was for QLDC to continue to deliver water services in-house, recognising that changes would need to be made to enable Council to respond to the new regulatory environment if such a model was progressed with. An in-house model would be similarly subject to the Commerce Commission regulatory requirements. In addition to cost to households, the WSCCO and the in-house model were assessed on their ability to attract and retain staff, adapt to changing requirements, maximise value and minimise waste, effectively and efficiently manage water services, and deliver to community priorities. Mr Avery said public feedback was imperative to informing Council's decision on the best option to deliver high quality, resilient, sustainable, and reliable water services in the future. 'Drinking water, stormwater, and wastewater services all cost the ratepayer a significant amount of money, and under all scenarios, including in Council's current Long-Term Plan, water charges are projected to increase substantially,' said Mr Avery. 'I would urge all residents to take the time to understand Council's proposal and the alternative, what this would mean for the future, and to have a say before feedback closes on Sunday 29 June 2025.' A detailed consultation document on QLDC's proposed future water services delivery model and a feedback form are available online at QLDC Councillors agreed to consultation on the proposal to establish a WSCCO at the Full Council meeting on Thursday 29 May 2025.


Scoop
15 hours ago
- Scoop
Council Teams Up With Palmerston North And Rangitikei To Deliver Water Services
Horowhenua District Council will join Palmerston North City Council and Rangitikei District Council to deliver water services and recognises Whanganui District Council and Ruapehu District Council as potential willing partners. Today's decision is projected to save the average Horowhenua household between $195 and $300 per year by 2027/28. The Government's Local Water Done Well policy requires all councils to decide how they will continue to deliver safe, reliable water services sustainably into the future, either alone or in partnership with other councils. Taking into account feedback from public consultation, elected members unanimously voted today to form a Joint Water Services Organisation with the two other councils, and leave the door open for Whanganui and Ruapehu to join if their respective councils vote in favour of this option. The Water Services Organisation will manage resources across councils, enabling lower operating costs and improved efficiency which will generate the estimated annual savings. It will also be able to borrow up to five times the amount it generates from water services charges through the Local Government Funding Agency, which is almost twice as much as Council can currently borrow. This means that the cost of increased investment in water infrastructure can be spread across the lifetime of the assets. 'Scale does matter and I am confident we have made the right decision. It's important we take a long-term view of water services delivery and while I acknowledge while this is a crucial milestone, it is only the start of a challenging journey ahead,' says Horowhenua Mayor Bernie Wanden. 'I know some councils including Kāpiti and Manawatū have decided to go it alone rather than join forces with their neighbours. 'But our analysis – which was rigorous –convinced us that we can provide more sustainable water services by teaming up with other councils. 'And in the long term it will be cheaper for ratepayers too.' The next step is for the councils to work together to produce a Water Services Delivery Plan, which must be submitted to the Government by 3 September 2025. 'I'd like to acknowledge our hard-working Local Waters team, which just celebrated its first six months operating and maintaining our water assets and services,' says Chief Executive Monique Davidson. 'They are doing an excellent job for the community and will continue to do so as we work through the many decisions, we need to make about how the new water services organisation will work. In other words, for now it is business as usual.' Ruapehu District Council and Whanganui District Council will decide on their preferred Water Services Delivery Model at their respective Council Meetings on 25 and 26 June. Modelling suggests that if all five councils formed a Water Services Organisation, savings of over $300m could be achieved over 30 years.


Scoop
19 hours ago
- Scoop
Wellington's Te Ngākau Civic Precinct
Wellington City Council's elected members have been briefed on the latest progress in Te Ngākau Civic Precinct. The precinct is now nine months away from reopening, with a city-wide celebration planned for March 2026 when Te Matapihi ki te Ao Nui – the Central Library - reopens its doors. The reopening event will reflect the City Council's partnership with mana whenua and the creative community, drawing Wellingtonians from all walks of life into the new building with music, art, performances and interactive experiences. Precinct Properties and the Council are negotiating a deal to activate the former CAB/MOB site while Precinct Properties completes all the necessary design and planning work for a new building. The activation space will be brought to life with art, retail, and hospitality offerings. The site will be activated for up to five years, while Precinct does its due diligence on the new building. City Council Chief Operating Officer James Roberts says it's essential to activate the area in a creative way until construction begins. "We'll use this opportunity during the planning phase to create a vibrant and exciting new space right in the heart of our city." He says the intent for the new development on the site remains the same – a five-star green building that includes retail, hospitality, co-working, and office space, alongside civic and cultural spaces. The agreement with Precinct Properties will be considered by the Council's Environment and Infrastructure Committee in August. Te Whare Whakarauika Town Hall continues to make good progress, with the refurbishment of the Town Hall itself, plus the construction of the new annex building, due to be completed by July 2026. The design of the annex has evolved following engagement with groups including NZSO, NZSM, WellingtonNZ, Heritage New Zealand Pouhere Taonga and Council regulatory teams. It will provide the main entrance to the Town Hall and feature front-of-house facilities including three bars, toilets, and offices. The Town Hall will re-open in early 2027. Other key parts of the precinct are also due to be completed in time for the March 2026 reopening of Te Matapihi ki te Ao Nui, including City Gallery maintenance and strengthening work, civic basement strengthening, and Te Ngākau Civic Square landscaping and redevelopment. The City Council head office move to 68 Jervois Quay will also be underway in early 2026, bringing the Council back to the Te Ngākau neighbourhood to play a key role in the area's revitalisation. The Te Ngākau Precinct Development Plan is currently being refined with input from the Wellington architecture community via a new urban design panel. The development plan will provide the blueprint for completing the precinct in future years, as the Council's funding and priorities permit. The plan is due to be finalised in July 2025.