logo
Kelana Jaya LRT back on track at 11.10am after morning disruption

Kelana Jaya LRT back on track at 11.10am after morning disruption

Malay Mail6 hours ago

KUALA LUMPUR, June 9 — The Kelana Jaya Line Light Rail Transit (LRT) service, which experienced delays due to a track switch disruption between the Pasar Seni and Bangsar stations, resumed full operations at 11.10am today after initial repair works were completed.
Rapid Rail Sdn Bhd, in a statement, said its engineering team completed the preliminary repair works at 10.56am and conducted tests on the track system and components to ensure the line could operate per safety standards.
'Nevertheless, the engineering and operations teams will continue to monitor train movements throughout the operating hours to ensure the Kelana Jaya Line runs smoothly.
'Full repair works will be carried out after operating hours to reduce disruption to passengers. A thorough investigation is also underway to identify the root cause of the issue to prevent a recurrence,' the statement said.
Rapid Rail also thanked the passengers for their patience throughout the disruption.
This morning, Rapid Rail announced that the Kelana Jaya LRT Line experienced schedule delays following a track switch disruption between Pasar Seni and Bangsar stations.
The issue was detected around 5.30am, resulting in trains heading from Pasar Seni to Bangsar towards Putra Heights having to be operated manually. — Bernama

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Woman feared drowned in Pahang after car plunges into Sungai Triang, swept by strong currents
Woman feared drowned in Pahang after car plunges into Sungai Triang, swept by strong currents

Malay Mail

time4 hours ago

  • Malay Mail

Woman feared drowned in Pahang after car plunges into Sungai Triang, swept by strong currents

KUANTAN, June 9 — A woman is feared drowned after the car she was in started moving suddenly and plunged into the river before being swept away by strong currents in an incident at Sungai Triang near Bandar Baru Bera, earlier this afternoon. A spokesman for the Pahang Fire and Rescue Department of Malaysia (JBPM) said they received an emergency call regarding the incident at 1.58pm before a team from the Triang Fire and Rescue Station rushed to the location. He said they received information from witnesses at the scene that the woman, 31, was in the area with her husband and one-year-old daughter for a fishing activity. 'At the time of the incident, the victim was inside a Perodua Bezza car with her child while her husband was fishing nearby when the vehicle suddenly moved towards the river. 'The victim's husband managed to save their child who was inside the car, but the woman is believed to have been swept away by the strong current while trying to save herself,' he said when contacted today. He added that a search and rescue (SAR) operation is actively underway involving 11 personnel, comprising six members from the Triang Fire and Rescue Station and five members of the Water Rescue Team (PPDA) from the Bukit Angin Fire and Rescue Station. — Bernama

Kelana Jaya line LRT up and running at 11.10am after disruption
Kelana Jaya line LRT up and running at 11.10am after disruption

Malaysian Reserve

time4 hours ago

  • Malaysian Reserve

Kelana Jaya line LRT up and running at 11.10am after disruption

THE Kelana Jaya Line Light Rail Transit (LRT) service, which experienced delays due to a track switch disruption between the Pasar Seni and Bangsar stations, resumed full operations at 11.10 am today after initial repair works were completed. Rapid Rail Sdn Bhd, in a statement, said its engineering team completed the preliminary repair works at 10.56 am and conducted tests on the track system and components to ensure the line could operate per safety standards. 'Nevertheless, the engineering and operations teams will continue to monitor train movements throughout the operating hours to ensure the Kelana Jaya Line runs smoothly. 'Full repair works will be carried out after operating hours to reduce disruption to passengers. A thorough investigation is also underway to identify the root cause of the issue to prevent a recurrence,' the statement said. Rapid Rail also thanked the passengers for their patience throughout the disruption. This morning, Rapid Rail announced that the Kelana Jaya LRT Line experienced schedule delays following a track switch disruption between Pasar Seni and Bangsar stations. The issue was detected around 5.30 am, resulting in trains heading from Pasar Seni to Bangsar towards Putra Heights having to be operated manually. — BERNAMA

Kelana Jaya LRT back on track at 11.10am after morning disruption
Kelana Jaya LRT back on track at 11.10am after morning disruption

Malay Mail

time6 hours ago

  • Malay Mail

Kelana Jaya LRT back on track at 11.10am after morning disruption

KUALA LUMPUR, June 9 — The Kelana Jaya Line Light Rail Transit (LRT) service, which experienced delays due to a track switch disruption between the Pasar Seni and Bangsar stations, resumed full operations at 11.10am today after initial repair works were completed. Rapid Rail Sdn Bhd, in a statement, said its engineering team completed the preliminary repair works at 10.56am and conducted tests on the track system and components to ensure the line could operate per safety standards. 'Nevertheless, the engineering and operations teams will continue to monitor train movements throughout the operating hours to ensure the Kelana Jaya Line runs smoothly. 'Full repair works will be carried out after operating hours to reduce disruption to passengers. A thorough investigation is also underway to identify the root cause of the issue to prevent a recurrence,' the statement said. Rapid Rail also thanked the passengers for their patience throughout the disruption. This morning, Rapid Rail announced that the Kelana Jaya LRT Line experienced schedule delays following a track switch disruption between Pasar Seni and Bangsar stations. The issue was detected around 5.30am, resulting in trains heading from Pasar Seni to Bangsar towards Putra Heights having to be operated manually. — Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store