logo
Why China has ramped up construction work on Pakistan's Mohmand dam

Why China has ramped up construction work on Pakistan's Mohmand dam

Indian Express21-05-2025

Amid India-Pakistan tensions, China is accelerating the pace of work on the Mohmand dam in Pakistan's northwestern Khyber Pakhtunkhwa province, according to a recent report in the South China Morning Post.
China has funded several infrastructure projects in Pakistan in recent years, including for the China-Pakistan Economic Corridor portion of its Belt and Road Initiative (BRI). On Saturday (May 17), state broadcaster Chinese Central Television (CCTV) reported that concrete filling on the dam had begun, marking 'a critical construction milestone and a phase of accelerated development for this national flagship project of Pakistan'.
The SCMP report noted that the statement followed India's announcement of suspending the 1960 Indus Waters Treaty with Pakistan in the aftermath of the April 22 Pahalgam terror attacks. What is the significance of the Mohmand dam in this context? We explain.
The Mohmand dam is being constructed on the Swat river, which originates from the glaciers of the Hindu Kush mountains. It is a perennial river, flowing through picturesque valleys and mountains, and later joining the Indus.
The project in question is located on the river, about 5 km upstream of the Munda Headworks (a structure that diverts water flow) in the Mohmand Tribal District. It will have a height of 213 metres and a capacity of 1.239 million acre-feet.
According to the Pakistan Water and Power Development Authority's website, its main objectives are to mitigate the risk of floods, irrigate agricultural land of 16,737 acres, generate hydropower and improve the socio-economic conditions of the local population. Work on the project began in 2019, with an initial proposed completion date of December 2025.
Once complete, it will generate 2,862 Gigawatt hours of power annually. The SCMP report said it would also supply 300 million gallons of drinking water every day to Peshawar, the capital of Khyber Pakhtunkhwa.
At present, it assumes significance given the suspension of the Indus Waters Treaty. In this river system, India is the upper riparian state (from where the water flows), while Pakistan is the lower riparian state. Under the 1960 agreement, water from all the Eastern Rivers (Sutlej, Beas and Ravi) was available for the 'unrestricted use' of India, while Pakistan got the Western Rivers (Indus, Jhelum, and Chenab).
David Michel, a Senior Fellow of the Global Food and Water Security Program at the Center for Strategic and International Studies (CSIS), detailed the dependency Pakistan has on the Indus River system.
He wrote, 'Over three-quarters of the country's annually available renewable water resources come from outside its borders, almost entirely from the Indus… Major cities such as Karachi and Lahore rely upon the river—or on groundwater aquifers that the Indus helps replenish—for their drinking water… The Indus system waters more than 90 percent of the nation's crops. Similarly, Pakistan generates one-fifth of its electricity from hydropower. Every one of the country's 21 hydroelectric plants is located in the Indus Basin.'
Notably, India cannot immediately stop water from flowing downstream to Pakistan because it lacks the infrastructure to store water within its borders. Building such structures could take at least several years. In the past, Pakistan has objected to some proposed dams and storage projects on the Indian side, claiming they contravened the treaty's provisions. However, India's decision has underlined the vulnerability of Pakistan's water resources.
Beyond the geopolitical aspect, the Indus is known to change its course drastically between dry and wet seasons, contributing to devastating floods. On the other hand, regions such as Sindh have faced droughts in some years. Controlling the water flow can thus help efficiently manage water resources.
And where does China come in?
While China has urged restraint from both parties amid the recent India-Pakistan tensions, it enjoys longstanding military and economic ties with Pakistan. For China, cultivating a deeper relationship with Pakistan matters in the context of countering Indian influence in the region.
Another key China-funded hydro project in Pakistan is the Diamer-Bhasha dam, which is proposed to be constructed in Pakistan-occupied Kashmir (PoK) despite India's objections. 'We have consistently conveyed our protests and shared concerns with both Pakistan and China on all such projects in the Indian territories under Pakistan's illegal occupation,' MEA spokesperson Anurag Srivastava said in 2020.
It faced funding issues early on, with the Imran Khan-led government launching a crowdfunding project in 2018 that eventually failed. A 2020 PTI report said that China then came to the rescue. 'Chinese state-run firm China Power holds 70% and the Frontier Works Organisation (FWO), a commercial arm of the Armed Forces of Pakistan, 30% share in the consortium that will build the dam,' it said.
Khan inaugurated the construction in July 2020, saying it would be the 'biggest dam in Pakistan's history'. It was supposed to have a capacity to generate 18,097 GWh annually.
However, the project faced multiple problems after clearing the initial financing hurdle. As recently as March, Dawn reported a sit-in protest by the locals, whose demands included land rehabilitation and free electricity generated by the project.
Another issue for China is that the ambitious CPEC is yet to result in major economic gains, even more than a decade after its launch. Several projects are yet to be completed, or have stopped due to multiple roadblocks, including attacks on Chinese engineers by Baloch militants and the larger political and economic instability in Pakistan. And yet, Pakistan's strategic importance for China ensures its continued support.
Rishika Singh is a Senior sub-editor at the Explained Desk of The Indian Express. She enjoys writing on issues related to international relations, and in particular, likes to follow analyses of news from China. Additionally, she writes on developments related to politics and culture in India.
... Read More

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Rly hauled up for providing filthy train to BSF: 4 officials axed
Rly hauled up for providing filthy train to BSF: 4 officials axed

Hans India

time33 minutes ago

  • Hans India

Rly hauled up for providing filthy train to BSF: 4 officials axed

Railway Minister Ashwini Vaishnaw on Wednesday suspended four officials and ordered an inquiry after the BSF accused the railways of providing a filthy, rickety and unhygienic 'special' train from Tripura to transport around 1,200 troops to be deployed in Jammu and Kashmir for the Amarnath Yatra. Sources at the BSF headquarters in Delhi said jawans of the paramilitary force were shocked to see the poor condition of the coaches, which were 'full of cockroaches, broken seats and windows and dirty toilets with no water and strewn with human excreta'. Videos of the rundown and filthy train, shot by some BSF jawans, went viral on social media, triggering outrage over the treatment of security forces, as many online users took potshots at the Narendra Modi dispensation that swears by national security and soldiers. 'It was so shameful that the railways provided a special train with horrible conditions inside. Apparently, the train was not used for months. The jawans would have fallen sick had they travelled in it. Our top brass took up the matter with senior railway officials and asked them to provide a better train, or the troops would not travel,' said a BSF official. The troops were part of the central force reinforcements being sent to Jammu and Kashmir to boost security for the annual Amarnath Yatra scheduled from July 3 in the aftermath of the Pahalgam terror attack. Sources said around 1,200 BSF troops, drawn from 13 companies, were scheduled to board a special train on June 6 for Jammu Tawi from Udaipur in Tripura. The train was supposed to make a few stops in between for more troops to board from Assam and Bengal. 'The train was, however, made available three days later (June 9) even though the jawans were supposed to be deployed by June 12 as per the directions of the Union home ministry. When some troops entered the train, they were shocked to see the horrific condition inside. It was filthy, full of cockroaches, with broken seats and windows and dirty toilets strewn with human excreta. There was no water inside the washroom,' said the BSF official.

Auto sector pushes 3-step plan to cut China dependence for rare earth magnets
Auto sector pushes 3-step plan to cut China dependence for rare earth magnets

Economic Times

time2 hours ago

  • Economic Times

Auto sector pushes 3-step plan to cut China dependence for rare earth magnets

Indian automakers are facing potential supply disruptions of rare earth magnets due to China's export controls, impacting production of critical components for both electric and conventional vehicles. To mitigate this, the industry has proposed a three-pronged strategy to the government, including local assembly incentives, recycling initiatives, and diversification of import sources. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads ( Originally published on Jun 12, 2025 ) Squeezed for supplies, automakers have made a three-pronged suggestion to improve supplies of rare earth magnets over the next three years to reduce dependence on Indian auto industry made a presentation to the ministry of heavy industries last week detailing strategies to attain self-sufficiency in supply chains It suggested incentives for Indian companies to start local assembly of rare earth magnets, recycling of used magnets and outreach to resource-rich countries such as Australia, Vietnam, Chile, and Peru to secure a longer 3-10 years phase, they have proposed incentives to be introduced for large industrial players to set up manufacturing units for rare earth magnets with backward integration for raw parts makers are likely to run out of stock of rare earth magnets early next month, which is likely to affect production of about a dozen critical components that go into electric vehicle motors as well as vehicle speed detection and automatic gear shifting announced export controls on medium and heavy rare earth-related items with a view to 'safeguarding national security' on April 4 in response to US President Donald Trump's accounts for about 70% of global rare earth metals mining and nearly 90% of production.'The goal should be to ensure that India develops not only downstream capabilities but also upstream processing infrastructure', automakers said in the presentation, a copy of which was reviewed by ET.'Financial and policy support must be provided to encourage public private partnership,' to build a complete domestic value chain, it would include incentives for encouraging local mining and production of heavy rare earth magnets. However, till the time local mining, ore magnet production arrangements are done, the government must undertake measures to arrange for import from non-China based sources like Vietnam, Brazil, Russia, among the near-term, though, the industry has said that the Indian government engages with counterparts in Beijing to relax export restrictions and help in expediting export control licenses so that automobile production in the country is not disrupted.'While those making electric vehicles will be particularly impacted, the restriction eventually will affect all companies as these magnets are used in several key components including in electric power steering, parts for engine cooling and sensing exhaust gas concentration, engine spark ignition, among others,' said a senior industry executive on condition of anonymity,While some parts makers in Europe recently got approvals to source rare earth magnets, their Indian arms are yet to get a go-ahead from the Chinese ministry of issue is complicated by the tense business and political relationship between India and China, experts said. As many as 35 Indian component makers import rare earth magnets from its latest report CareEdge Ratings said delays in rare earth elements (REE) shipments for Indian auto OEMs may impact electric, Internal Combustion Engine (ICE) and hybrid vehicle production starting July 2025, particularly higher-end models that depend on REE-based technologies.'Automakers might need to shift focus to mid-range or base models to address supply disruption. However, China's recent decision to temporarily allow REE exports to top US automakers offers hope for resolving the impasse for Indian companies as well', the ratings agency said in a note Thursday.

Rayzon Solar to file draft papers for Rs 1,500-cr IPO
Rayzon Solar to file draft papers for Rs 1,500-cr IPO

Economic Times

time2 hours ago

  • Economic Times

Rayzon Solar to file draft papers for Rs 1,500-cr IPO

Solar panel manufacturer Rayzon Solar Ltd is planning to file its draft papers with markets regulator Sebi by the end of the month, as it prepares for about Rs 1,500-crore initial public offering (IPO), people familiar with the plan said on Friday. ADVERTISEMENT The Surat-based company has already roped in top investment banks to manage the public offering. According to the people familiar with the plan, the company is looking to raise funds through fresh issuance of equity shares and proceeds are expected to be used for for its expansion plans. An email to Rayzon Solar seeking confirmation of the draft papers filing and IPO details did not elicit a response. The company is considering to enter the public market at a time when the domestic solar manufacturing industry is gaining traction, driven by import curbs, and rising global interest in non-China supply chains. Founded in 2017, Rayzon Solar has emerged as one of the fastest-growing solar PV module manufacturers in the country. As per its website, the company has grown from an initial installed module manufacturing capacity of just 40 MW to 6,000 MW, across two facilities in Karanj and Sava, Gujarat, and is likely to expand further. In March, the company raised around Rs 138 crore through private placement of equity shares. PTI

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store