logo
Meghalaya rolls out solar power for schools, PMAY homes

Meghalaya rolls out solar power for schools, PMAY homes

Time of India15-07-2025
1
2
Shillong: In a push for renewable energy expansion in Meghalaya, the Meghalaya New & Renewable Energy Development Agency (MNREDA) has started solar power installations at 63 BharatNet-1 sites across the state.
These installations span govt schools, integrated child development services centres (ICDS), and community halls, with an aim to ensure sustainable and reliable power for BharatNet infrastructure and enhance digital connectivity in rural areas.
According to the agency, solarisation is underway at 22 govt lower primary schools. Additional installations are in progress at eight secondary schools, four ICDS centres, and 29 community halls.
"Under the CM's solar mission, solarisation of 125 lower primary schools has begun in East Garo Hills district — covering 72 schools with 1.1 kVA systems and 53 schools with 2.2 kVA systems. A similar initiative is set to launch in East Jaintia Hills district, targeting 123 schools with the same system configuration," read a statement by the agency.
The agency also announced household electrification efforts under the Pradhan Mantri Awas Yojana (PMAY) in Mylliem block of East Khasi Hills district, where hybrid solar inverter systems are being installed for 492 beneficiaries (352 with 0.85 kVA systems and 140 with 1.7 kVA systems). In North and East Garo Hills, installations will benefit 354 households (253 with 0.85 kVA and 101 with 1.7 kVA systems).
"These initiatives reflect the government's ongoing commitment to inclusive rural development through clean energy access, contributing to improved livelihoods and digital empowerment," the agency stated.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Mumbai Metro-1: How City's 1st Line Became Centrepoint Of Smooth East-West Travel Over 11 Years
Mumbai Metro-1: How City's 1st Line Became Centrepoint Of Smooth East-West Travel Over 11 Years

News18

timea day ago

  • News18

Mumbai Metro-1: How City's 1st Line Became Centrepoint Of Smooth East-West Travel Over 11 Years

Last Updated: Mumbai Metro Blue Line: What is the route of Versova-Andheri-Ghatkopar Mumbai Metro-1? Is it connected to other Metros? How and where? What is ticket fare? Explained Mumbai Metro Line 1: Mumbai Metro Line 1 or Metro One, the city's first east-west corridor, completed 11 years of operation this July. The 11.4-km Versova-Andheri-Ghatkopar (VAG) corridor has transported over 111 crore passengers, as of July. 'On its 11-year run, Mumbai Metro One has made more than 12.66 lakh train journeys…," operator Mumbai Metro One Private Limited (MMOPL) said. Ghatkopar has seen almost 30 crore travellers, Andheri 23 crore and Saki Naka 11 crore since its launch. The Mumbai Metro-1 Blue Line started operations on June 8, 2014, with inauguration by then CM Prithviraj Chavan. It is said to have the eighth highest passenger density of any metro line in the world. There are a total of 64 curves on the line, with the steepest curve being 107 metres (351 ft). It was built at a cost of Rs 2,356 crore. Metro One was designed as an alternative to the roads and railways on public-private-partnership (PPP) between Reliance Infrastructure and the Mumbai Metropolitan Region Development Authority (MMRDA). Metro One offsets over 67,000 tonnes of CO₂ annually, an impact comparable to planting over 3 million trees. The line has also been recognised with over 40 prestigious awards for its service, innovation, and environmental contributions, according to MMOPL. On this Children's Day, young adventurers boarded the Metro and had a ride full of laughter and wonder! 🚇✨ #ChildrensDay #MetroFun #HappyRides #LittleExplorers #KidsOnTheMetro #JoyfulJourneys#ChildhoodAdventures #MetroMagic #HappyLittleTravellers #MetroJoy … — Mumbai Metro (@MumbaiMetro01) November 15, 2024 Mumbai Metro-1: How many trains does it operate? Week-day ridership: 500,000 (highest 5.47 lakh) Train trips operated: 12,66,973 (more than 1.2 million) Cumulative kilometres covered: 1,45,21,256 What are Mumbai Metro-1 timings? First Train: 5:30 AM from both Versova and Ghatkopar. Last Train: 11:25 PM from Versova and 11:50 PM from Ghatkopar. What is the frequency of Mumbai Metro-1? Around 4 minutes during peak hours with 444 trips. Around 8 minutes during non-peak hours. 11th Foundation Day of Mumbai Metro One 🎉Towards greater achievements, stronger connections, and continuous success!Here's to the journey so far — and the exciting path ahead. 🚇💙 #MMO11Years #FoundationDay #UrbanMobility #StrongerTogether #MetroAnniversary #ConnectingMumbai … — Mumbai Metro (@MumbaiMetro01) June 8, 2025 Mumbai Metro-1: What is the route? What are the stations? Mumbai Metro-1 provides connectivity between the eastern and western suburbs to Western & Central Railway. It has 12 stations – Versova, DN Nagar, Azad Nagar, Andheri, Western Express Highway, Chakala (J B Nagar), Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar. It facilitates smooth and efficient interchange between suburban rail system and Metro trains at Andheri and Ghatkopar Stations. How has Metro-1 helped Mumbai? It has reduced the journey time from 71 minutes to 21 minutes, between Versova and Ghatkopar. Provides rail-based access to the MIDC, SEEPZ and commercial developments. Is Metro-1 connected to other Metro lines? Metro-1 connects to other Metro lines. Here's how: Line 2A (Dahisar East to DN Nagar): At D N Nagar Line 7 (Dahisar East to Andheri East, which runs along the Western Express Highway from Dahisar to Gundavali): At Western Express Highway Is it easy to switch lines from Metro-1? Remember you need to exit one line and buy a separate ticket or tap your NCMC smart card for the next line. Here's how easy the switch is: 1. DN Nagar (Line 1)-Andheri West (Line 2A): There's a covered connector / skywalk linking DN Nagar station (Line 1) directly to Andheri West station (Line 2A). Commuters exit Line 1, cross the skywalk, and enter Line 2A platform at the other end—no street crossing needed. The walk is short and sheltered, typically under 5 minutes. 2. Western Express Highway (Line 1)-Gundavali (Line 7): These stations are connected by a 58 metre foot overbridge (FOB) built by MMRDA, linking the two platforms directly. Walking distance is about 58 metres, so roughly 1 minute for most people. 3. Marol Naka (Line 1)-Line 3 (Aqua Line): At Marol Naka, Line 1 (elevated) and Line 3 (underground) serve the same location but do not share a direct internal connector. You must exit one station, walk externally on footpaths, and enter the other station separately. This walk is around 500 metres, about 5–7 minutes depending on crowd and path condition. Path quality can vary—some say footpaths may be narrow or uneven, especially around major roads. Why Metro-1 matters in office journey in all directions: From Ghatkopar, Dahisar or Borivli to BKC or Worli Metro-1 is a key connector in your journey from Ghatkopar or Mumbai suburbs, Dahisar or Borivli East to Worli. Ghatkopar to Worli: Taking a local Central Railway train, you can get off at Ghatkopar station. It is interconnected to the Ghatkopar Metro station. For those coming from Western Railway or the harbour line, the interchange is at LIC Andheri. If your office is in Andheri or Versova, the Metro line takes you directly to the spot. If you want to go to Worli, from Marol Naka (Metro-1), you can go to BKC or Worli using Metro-3. If your destination is Dahisar, you need to get off at Western Express Highway (Metro-1), walk for five minutes to reach Metro 7. Dahisar East to Worli: Take Metro-7 and get off at Gundavli. Change over to Metro-1's (Versova-Andheri-Ghatkopar) Western Express Highway station. It is a five-minute walk between Metro 7 and Metro-1 through a 58-metre foot overbridge. Using Metro-1, travel towards Ghatkopar and get off at Marol Naka. Change over to the underground Metro-3 which will take you to BKC or further to Worli. Coming from an area in the vicinity of Dahisar, you can board Metro-7 at any of these stations: Dahisar East, Ovaripada, National Park, Devipada, Magathane, Poisar, Akurli, Kurar, Dindoshi, Aarey, Goregaon E (Interconnect Mumbai Metro-6: Pink Line), Jogeshwari E, Shankarwadi, and Gundavali (Earlier Andheri East, Interconnect Mumbai Metro-1 — Blue Line and Mumbai Metro: 7A – Red Line). Metro 7A is the southern extension of the operational Metro Line 7 from Andheri (East) to Dahisar (East). Borivli West to Worli: Take Metro-2A from Borivali West and get off at Andheri West. Change over to Metro-1's DN Nagar station. Using Metro-1, travel towards Ghatkopar and get off at Marol Naka. Change over to the underground Metro-3 and head to BKC or further to Worli. Stations on Metro 2A are — Dahisar (East), Anand Nagar, Kandarpada, Mandapeshwar-I C Colony, Eksar, Borivali (West), Pahadi Eksar, Kandivali (West), Dahanukarwadi, Valnai, Malad (West), Lower Malad, Pahadi Goregaon, Goregaon (West), Oshiwara, Lower Oshiwara, Andheri (West). Once Metro-3 is connected to Colaba, the journey will become even smoother. 🚇 तुम्ही सुरळीत प्रवास करण्यास तयार आहात का? 🎫📲 मुंबई मेट्रो वनच्या व्हॉट्सॲप तिकीटामुळे तुम्हाला लांब रांगेत उभे राहण्याची गरज नाही. कुठूनही तुमचे डिजिटल तिकीट बुक करा. हे खूप सोपे आहे. तुमच्या सोयीसाठी तिकीट फक्त एका क्लिकच्या अंतरावर आहे!🌟 #WhatsAppTicketing #EasyTravel … — Mumbai Metro (@MumbaiMetro01) December 20, 2023 How can you get tickets for Mumbai Metro-1? There are various options: 1. Paytm App: Tickets are mobile QR codes; no need for physical smart cards. Payment via UPI, cards, etc., within Paytm. 2. At the station: Single Journey Ticket (SJT) or Return Journey Ticket (RJT) available. Token/Vending Machines (TVMs/AVMs): Accept cash, UPI, debit/credit cards at stations. Ticket Selling Officers (TSO): Counters also issue paper QR tickets for single or return trips. 3. WhatsApp Ticketing (Line 1 support): Line 1 also supports WhatsApp-based ticket purchases. Send 'Hi" to +91 96700 08889 for a ticket link and QR code. 4. All automatic fare collection (AFC) gates on Line 1 stations have been upgraded to accept NCMC-compliant cards, alongside the older closed-loop metro cards. You can now tap a single Mumbai 1 card at entry and exit gates for travel on Metro Line 1. Points to remember while buying tickets QR tickets (single or return journey) expire within the same operational business day and cannot be refunded or canceled once issued The 'Mumbai 1' app presently supports Line 2A and 7 only and does not support booking for Line 1; Paytm remains the go-to app for Line 1 bookings. What are the fares for Mumbai Metro-1? In case of line 1, fare range is Rs 10-40. Is Mumbai Metro-1 connected to other public transport? Bus: Brihanmumbai Electric Supply and Transport (BEST) buses serve all Metro-1 stations, offering last-mile connectivity across Andheri, Juhu, Ghatkopar, Sakinaka, and Kurla areas. Major stations like Andheri, Western Express Highway (WEH), Ghatkopar, and Saki Naka have dedicated bus stops or depots nearby. Common BEST routes near Metro-1 stations include: 202, 254, 340, 371, 375 (Ghatkopar area) 186, 340, 392, 496 (Andheri area) 419, 433, 472, 505 (Sakinaka and Marol areas) Railway: Andheri Station (Western Line): Walkable via skywalk to Andheri Metro station. Ghatkopar Station (Central Line): Connected via elevated walkway to Ghatkopar Metro. These are the two primary rail-to-metro interchanges on Line 1 and are among the busiest. Autorickshaws and taxis: Auto rickshaw stands are available at almost all Metro-1 stations. Prepaid taxi counters are available at Andheri and Ghatkopar. App-based cab pick-up zones (Uber, Ola) are common but can be congested during peak hours. top videos View all Will Metro-1 be connected to upcoming/planned lines? Line 2B (Extension of Line 2A): It runs from DN Nagar (Line 1's terminal) further east toward Mandale. While Line 2B starts from DN Nagar, passengers on Line 1 will continue changing at DN Nagar itself—a built interchange. No new physical connector is planned; existing interchange facility will suffice. Line 6 (Pink Line): Connects Jogeshwari-Vikhroli; intersects with Line 1 only indirectly—no direct interchange is planned at this time. Line 3 (Aqua Line): Already connects at Marol Naka. Line 4 / 4A / 10 / 11 / 12 / 13 / 14: These future lines fall under Metro 4 and its extensions (Lines 10 & 11), Metro 5/12, Metro 7/9, and other corridors. At Ghatkopar, Line 1 meets Line 4. Line 11 (Wadala-CSMT) would intersect Metro 4, but no integration with Line 1 is part of that plan as of now. Line 8 (Gold Line Airport Express): This airport-to-airport line (CSMIA Terminal 2 to Navi Mumbai International Airport) is approved. No direct interchange with Line 1 is planned for now. About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Maha Mumbai Metro Operation Corporation Ltd Mumbai metro Mumbai Metro Rail Corporation news18 specials view comments Location : Mumbai, India, India First Published: July 28, 2025, 17:25 IST News cities » mumbai-news Mumbai Metro-1: How City's 1st Line Became Centrepoint Of Smooth East-West Travel Over 11 Years Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Jammu & Kashmir: 679 houses completed under PMAY in Bhaderwah
Jammu & Kashmir: 679 houses completed under PMAY in Bhaderwah

Time of India

time2 days ago

  • Time of India

Jammu & Kashmir: 679 houses completed under PMAY in Bhaderwah

BHADERWAH : The Centre has completed 679 houses under the Pradhan Mantri Awas Yojana ( PMAY ) in Jammu and Kashmir 's Bhaderwah, the Block Development Officer said. The implementation of the PMAY in Jammu and Kashmir 's Bhaderwah mirrors the government's steadfast commitment to ensuring housing for all. In the financial year 2023-24, 718 beneficiaries were identified, and 679 houses have already been completed, marking a significant milestone in rural infrastructure and welfare. Bhaderwah Block Development Officer Yasir Ahmed Wtold ANI, "The completion of 679 houses in a single financial year under PMAY is a testament to our team's dedication and the government's vision of 'Housing for All'. Special focus was given to poor and tribal families who were living in unsafe and unhygienic conditions. Today, many of them have permanent homes with proper facilities, which has significantly improved their standard of living." "We are committed to ensuring 100 per cent saturation of eligible beneficiaries in the coming months," the officer added. Homeless people are getting homes in the hilly terrains of Bhaderwah under the PMAY. This flagship rural housing scheme has dramatically improved the lives of underprivileged families, particularly those from economically weaker sections, by fulfilling their long-held dream of owning a home. For residents like Shahdi Lal, a 66-year-old daily wage labourer from Bhaderwah, the scheme has been life-changing. Shahdi Lal told ANI, "Earlier, I had faced many problems while living in a dilapidated mud wall house with my children and family, particularly during thunderstorms and the rainy season. However, with the government's help, I have now acquired a new house under the PMAY. I thank Prime Minister Narendra Modi and the district administration for providing us with a pucca house." "At my age, it was no longer possible to build a house with my limited income as a labourer. PMAY has provided a lifeline in the form of a resilient home that withstands the severe cold. It has changed the quality of life for my family," he said. As the region continues to benefit from the focused implementation of welfare programs, Bhaderwah stands as an example of how effective governance can bring about lasting, grassroots-level transformation.

70 anganwadis in DK to start KG this year
70 anganwadis in DK to start KG this year

Time of India

time3 days ago

  • Time of India

70 anganwadis in DK to start KG this year

Mangaluru: As many as 70 anganwadi centres in Dakshina Kannada have been permitted by the state govt to start LKG/UKG at their premises from this academic year. Of these, a total of 20 have been sanctioned to Mangaluru Rural, and 13 each in Bantwal and Sullia taluks. The department of women and child welfare commenced preliminary arrangements with the supply of smart TVs and books specifically designed for kindergarten. The official launch of the initiative will be held on Oct 2, the day when the Integrated Child Development Services (ICDS) programme is celebrating its 50th anniversary. The ICDS programme started in 1975. Usman A, deputy director of the women and child development department, said that Dakshina Kannada currently has a total of 2,131 anganwadis. Out of them, 70 anganwadis have been selected, which have their own buildings and are in good condition. The selected anganwadis have been provided with smart TVs and books. The syllabus is also in digital format, and will be displayed through the smart TVs. "Some sanctioned anganwadis have already started operating. However, the official launch is scheduled for Oct 2," he explained. A total of seven books have been supplied—three for pre-primary-1 or LKG, three for pre-primary-2 or UKG, and one for the teacher. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Elegant New Scooters For Seniors In 2024: The Prices May Surprise You Mobility Scooter | Search Ads Learn More Undo Children aged 4-5 years will be enrolled in pre-primary-1, and those aged 5-6 in pre-primary-2. There will not be any special grant from the govt to run this initiative. Usman said that the existing anganwadi teachers will be trained for the kindergarten. "They are yet to be trained, and we have not received any communication on the same," Usman said. Usman said that there was no opposition from nearby SDMCs of govt schools, which also have a similar setup to start the kindergarten in anganwadis. "The demand from anganwadis is growing to allow them to start kindergarten. We have received several requests," he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store