
Missing original caste census report throws govt's social justice plans into disarray
The revised report, submitted in 2023 by
Backward Classes Commission
led by K Jayaprakash Hegde, was based on select data from copies of the original Kantharaj Commission survey. The move has triggered sharp reactions and cast doubts over the authenticity of the entire exercise.
Hegde set off a political storm when he told reporters: "It is true the original data compiled under the Kantharaj Commission could not be located. We had to rely on a sample-based methodology to compile the current report. It was the only viable option given the circumstances."
The admission prompted an immediate backlash, with opposition leader R Ashoka asking how policy decisions can be based on a report that lacks the foundation of the original. "This is gross injustice to the people of Karnataka. The entire process is shrouded in mystery and lacks transparency," he said.
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Trade Bitcoin & Ethereum – No Wallet Needed!
IC Markets
Start Now
Undo
The JD(S) echoed the criticism, accusing the state govt of using the revised report for political advantage. "This revised report is nothing but a political tool to appease certain vote banks. The govt must come clean on the missing original report before taking up the revised one," the party said.
Adding to the controversy, a letter purportedly by Hegde to the govt in Nov 2023, circulating on social media, states that the sealed boxes containing the Kantharaj Commission's survey details were opened on Aug 26, 2021, in the presence of the commission's chairman, members, and the member secretary. While printed versions of the report were available, they lacked the member secretary's signature, and the original blueprint was missing.
"The officer concerned was directed to submit the blueprint immediately," the letter states. "The officer has submitted a reply stating that it is missing. Bringing this matter to the notice of the govt, I would seek how to proceed further and take action in this regard."
Despite calls for an investigation — especially since the original survey cost the state exchequer a staggering Rs 160 crore — the govt is yet to file a formal case and initiate a probe. "Even now, no one knows where the original report is," said an official.
Defending the revised report, home minister G Parameshwara said, "The data was compiled using a scientific approach. The commission has applied statistical techniques widely accepted in demographic studies. Sample-based surveys are legitimate when conducted correctly."
However, sociologist Dr BN Savitha cautioned against using such data for policymaking. "Sample surveys can offer insights but cannot replace a full-scale enumeration when dealing with something as sensitive and complex as caste data," Savitha said. "There is a risk that any caste-based restructuring based on this document may be challenged in court."
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
13 minutes ago
- Indian Express
What is the operational length of metro rail networks in Uttar Pradesh?
Metro Rail Network: India ranks third globally in operational metro rail network length and is on track to become the second largest Metro network in the world. The operational metro network has soared from 248 km across 5 cities (in 2014) to 1,013 km across 23 cities by May 2025, adding 763 km in just 11 years. The annual metro budget for the financial year 2025-26 is Rs 34,807 crore. During the ongoing Monsoon session of Parliament, Lok Sabha MP Dimple Yadav asked Minister of State (MoS) for Housing and Urban Affairs (MoHUA) Tokhan Sahu about the current operational length of metro networks in Uttar Pradesh and their average daily ridership, city-wise. She also sought details on the progress and expected completion timelines for ongoing projects such as Lucknow Metro Phase-2, Kanpur Metro corridors, and Agra Metro Phase-2, along with details of any cost overruns or delays. Responding to this on August 7 in Lok Sabha, the minister said that the total operational length of metro rail network in Uttar Pradesh is 147.446 km. He also added that the ministry has received proposal for Lucknow metro Phase-1B from Charbagh to Vasantkunj of 11.165 route km at a cost of Rs 5,801.05 crore with projected completion period of 5 years from date of sanction. 'The Kanpur Metro Rail Project of 32.38 route km at a cost Rs.11,076.48 crore and Agra Metro Rail Project of 29.4 route km at a cost of Rs.8,379.62 crore have already been sanctioned. UP Metro Rail Corporation Limited (UPMRCL), which is implementing agency for metro projects in Lucknow, Kanpur and Agra has informed that there is no cost overrun in these projects,' the minister stated. Details of current operational length of Metro rail network in Uttar Pradesh, average daily ridership, city-wise: (Source: As per written statement by MoS, MoHUA Tokhan Sahu in Lok Sabha on August 7, 2025.) Anish Mondal is a business journalist with over nine years of experience. He writes on diverse subjects such as Infrastructure, Railways, Roadways, Aviation, Politics, Market, Parliamentary affairs, Corporate earnings, General and International news etc. ... Read More


New Indian Express
13 minutes ago
- New Indian Express
Messi Kerala visit row escalates as govt, Argentine FA trade blame; Opposition alleges waste of Rs 130 crore
KOCHI: The Messi-in-Kerala dream has spiralled into a full-blown slugfest, with the Argentine Football Association (AFA) and the state government trading blame over the collapse of the plan. On Saturday, reports claimed AFA official Leandro Peterson had accused the Kerala government of breaching the contract, a charge dismissed by Sports Minister V Abdurahiman as 'baseless', insisting that if the team skipped the October visit, it would be the AFA in breach. The fresh twist has emboldened the Opposition Congress to go on the offensive, demanding that the government explain how a high-profile project, for which sponsors say they paid Rs 130 crore and the state spent lakhs on foreign trips, has spiralled into confusion, contract disputes and allegations of public money being wasted. Abdurahiman had dampened football lovers' hopes earlier this week, saying the visit by the Argentina team was 'unlikely' to happen as planned. As per some media reports, Leandro denied his side had breached the contract by postponing the tour to next year and instead pinned the blame on the Kerala government, though without detailing the alleged violations. The minister dismissed the reports and reiterated that Kerala was not interested in hosting the team next year. Govt should come clean, says Cong 'If Argentina fail to visit Kerala in October, we will see it as a breach of contract and a case of cheating. We are actively trying to bring the team here as per the contract. When a country signs the contract and accepts the money in this, what else do we have to say,' he told reporters in Malappuram.


New Indian Express
13 minutes ago
- New Indian Express
Be ye never so high, law is above you
A mechanical engineer by qualification, the 34-year-old grandson of former prime minister HD Deve Gowda and a former MP, Prajwal Revanna is now a convicted rapist and lodged in Bengaluru Central Prison as prisoner number 15528. On August 2, the MLA/MP court in Bengaluru sentenced Prajwal to life imprisonment and fined Rs 11 lakh for raping a 47-year-old domestic worker in Mysuru and recording the assault. Of the four rape and sexual abuse cases against him, this was the first case (rape) that led to trial and conviction. The fine will be paid as compensation to the survivor – a daily wage worker, who had the spine of steel and had withstood shame, agony, social ostracisation and fear of the backlash from the political elite. Pronouncing the maximum sentence of life imprisonment following his conviction in rape, Sessions Judge Santosh Gajanana Bhat, in his 466-page judgement, held that as an MP, Prajwal wielded his political and social dominance to violate a woman employed in his household, coercing her into silence through fear, shame, and manipulation. 'What are the safeguards against an arbitrary exercise of power?' The question posed in the judgement echoed through generational trauma of sexual exploitation of disempowered women by the rich and entitled. 'What would be the just compensation that can be awarded is a question that requires to be determined;' the tone of the verdict is as poignant as it is pertinent. Prajwal, a member of the 17th Lok Sabha from Hassan constituency – the heartland of Janata Dal (Secular) of his grandfather's making – was once the third youngest MP. He hails from the affluent, being the grandson of Deve Gowda – the Mannina Maga (son of the soil) – son of former Karnataka minister, HD Revanna and nephew of Union minister and former Karnataka chief minister HD Kumaraswamy. A graduate from Bangalore Institute of Technology, Prajwal discontinued his MTech course in Australia to help his grandfather with the 2014 Lok Sabha election from the JD(S) home turf – Hassan. The latter won the election.