Hundreds of CommBank customers unable to send money transfer or pay people
The issue affected transfers from CommBank accounts and took several hours before the services were restored about 2pm.
Customers who tried to transfer money between their account or pay people using PayID or BSB and an account number from the app received an error message, 'Something's gone wrong. Try again a little later.'
Payments made at an ATM through the outage were unaffected.
An update on the bank's website said the issue affecting some transfers had now been fixed.
'We are sorry for the inconvenience. Thank you for your patience,' the statement said.
More than 400 customers reported a problem with fund transfers and online banking on Down Detector.
Frustrated customers commented it was the second time the outage had occurred in the past month.
'Transfers are down again,' one person commented.
'Transferring funds doesn't work and sending doesn't work and the question bot (is) down,' another person said.
'Second time in about a month Commonwealth Bank has gone down,' a person said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

News.com.au
40 minutes ago
- News.com.au
Geelong city milk bar conversion like living ‘in a five-star hotel'
Bags of mixed lollies are a distant memory at a former Geelong milk bar that's emerged from an award-winning conversion as a luxury inner city home. Developer Bill Votsaris oversaw the transformation of the prominent heritage building at the corner of Malop and Swanston streets after saving it from years of neglect. He's now seeking a buyer for one of two premium townhouses within the landmark 1852 bluestone building. Jellis Craig Geelong listing agent Marcus Falconer said the $1.8m property set the benchmark for luxury living in Geelong's city centre. A private rooftop terrace with an indoor bar and servery is the crowning glory of the surprising two-bedroom residence. 'There are not too many people that would invest the money in saving that kind of history,' Mr Falconer said. 'It's SJB Architects, which are renowned as being one of Victoria's premier architectural firms, so the attention to detail and the quality of the fixtures and fittings is of a standard that is probably unparalleled in the Geelong market. 'This is the kind of home for a professional that wants to feel like they are in a five-star hotel.' The building, which was most recently home to Fan's Milk Bar, was described as being in 'very dire' condition when Mr Votsaris bought the property. His efforts to restore its original Victorian-era facade as part the conversion earned the project a 2024 Geelong Heritage Award. Thoughtfully retained original bluestone and red brick details are also incorporated into the interior design. A high-end kitchen featuring an integrated Liebherr fridge/freezer and Gaggenau induction cooktop, ovens and a coffee machine, is the centrepiece of the ground floor open-plan living zone. A private north-facing courtyard offers an alternative outdoor entertainment area, while a wide tandem garage accommodates two cars. Mr Falconer said the townhouse provided an attractive alternative for premium apartment buyers seeking easy access to the waterfront, Eastern Gardens and the CBD. 'This is one for people that perhaps don't want to be part of a body corporate and run the risk of big fees,' he said. 'It's one where everything has been done.'

ABC News
an hour ago
- ABC News
Delay in choosing COP31 host city poses challenge to Adelaide's preparations
Adelaide is ramping up preparations for next year's major UN climate summit despite not yet being named the host city, with experts warning that the uncertainty could pose logistical and diplomatic challenges. The South Australian government has allocated more than $8 million to prepare for COP31 and had anticipated that a host nation could be chosen as early as November last year. But Australia remains locked in a diplomatic stalemate with Türkiye over hosting rights for the November 2026 event, with the rival bidding nation yet to drop out. UN climate chief Simon Stiell has urged the two countries to resolve the impasse, saying a decision "needs to be made very quickly" both for logistical reasons and to ensure a negotiating agenda can be agreed on. "The delay in making that decision is unhelpful to the process — we need clarity," he told a Smart Energy Council Summit two weeks ago. Lasting about a fortnight, COP31 will bring together tens of thousands of delegates — including heads of state — to thrash out new climate agreements and track progress on the old ones. The "Conference of the Parties" is the main decision-making body of the United Nations Framework Convention on Climate Change (UNFCCC). It includes representatives from all 198 countries that are party to the convention. But with only 15 months until the summit, the scope for organising an "ambitious" negotiating agenda is shrinking, according to Dr Wesley Morgan, research associate at the Institute for Climate Risk and Response at UNSW. "There would still be very much expectations that Australia has an ambitious agenda showing the world how to transition away from fossil fuels to the clean energy industries of tomorrow. "The runway is getting shorter, but Australia very much can still achieve a very ambitious summit." COP31, Dr Morgan added, would be Australia's "biggest event since the 2000 Olympics in Sydney". He said it was not unprecedented for a host nation to be chosen only 12 months out. Australia remains "in the box seat" for COP31, Dr Morgan said, noting that it has majority support from its regional UN grouping — the Western European and Others Group. He said Australia needs to reach an arrangement with Türkiye to convince them to drop out, as the hosting rights decision is made by consensus, not a vote. September's meeting of the UN General Assembly looms as the next potential decision point, Dr Morgan said. If not then, a decision "would definitely need to happen" this November at COP30 in Belém, Brazil. "There are provisions if there continues to be a stalemate, but let's hope it doesn't get to that point," he said. Climate Change and Energy Minister Chris Bowen said last week that the UNFCCC process is "pretty opaque in terms of how a dispute gets resolved between two countries". He said Australia's bid has "overwhelming support" but there is still work to do. The South Australian government says it is continuing to prepare for COP31, which Premier Peter Malinauskas has described as "unlike anything we [South Australia] have ever hosted before". The government set aside more than $8 million in June's state budget for COP31 preparations, with those funds gradually being expended despite no decision on a host city. SA Police also has a dedicated COP31 preparation team that has grown to 18 police officers, Police Commissioner Grant Stevens said last week. "We can't afford to wait for the UN to make a decision regarding the host city," he told ABC Radio Adelaide. Commissioner Stevens said if Adelaide does host COP31, SA Police will be "borrowing resources from every police jurisdiction around Australia and New Zealand" to manage security and event management. Total COP attendance — comprised of delegates, observer groups and media — has fluctuated between 20,000 and 70,000 people over the past five years, according to the UNFCCC. Adding to the security challenge is the likely presence of dozens of world leaders. Sam Dighton, CEO of the Committee for Adelaide think tank, said security preparations were ""clearly ... a challenge for an event of this scale". "But we know that government is preparing both at a federal and state level, preparations are underway to deal with this certainly also from an emergency services perspective," he said. The Adelaide Convention Centre will host the bulk of COP31 events if Australia is chosen, with the government flagging that a "designated secure zone and public event area" will form part of the hosting arrangements. The premier has previously said the Convention Centre takes bookings four years in advance, creating another time challenge. "For the poor people that I have imposed this on, it is actually terrifying," he told a budget estimates committee in June. "They have got no choice but to get to work under the assumption that we may get this. "If we do not find out until later in the year, hypothetically, that we get it, then the window will almost be too small for us to start to do any preparatory work." On Wednesday the Premier said the government had "no choice" but to get on with preparations as this was "pretty much the next biggest event in a single city outside of the Olympics". "We start those preparations not presumptively, but pragmatically," he said. "Given that if we want to host the event as well as we know we can, that we're not caught out by a late decision ... about which country is going to host the event." Mr Malinauskas said "the best thing that can happen here" is a quick decision on hosting rights. "Because then it allows for the respective host city and country to get on with the task," he said. "I just hope there's a resolution soon."

ABC News
an hour ago
- ABC News
Harden residents await property repairs six months after freak storm
Ros Stewart watched her business crumble before her eyes just moments after a hailstorm began to lash a small town in southern NSW. "Within five minutes, we were trying to dodge roof tiles that were falling down," she said. The February storm at Harden, north of Canberra, lasted just under one hour. It dropped 40 millimetres of hail and 70mm of rain. It caused widespread destruction to the town, leaving several homes uninhabitable. Months later, some locals are still waiting for their insurance payouts to be approved. Ms Stewart said the gym she ran was still unusable. She and her husband Glenn were forced to move the business to a council-owned location down the street, causing a significant financial loss. "We've got about 10 pieces of equipment down there because its floors are wooden and it can't take the weight of the equipment," Ms Stewart said. She said prior to the storm, they would have more than 50 clients a day. She said the number had reduced to about 10. Ms Stewart said she received a payout about two weeks ago after months of back and forth with her insurer, AIG Australia. "We've got about a third of what we were hoping for, or what we thought we would be entitled to," she said. Ms Stewart said she was hoping to re-open at the original site towards the end of the year, nearly 12 months after closing the doors. She said that was "unbelievably ridiculous". AIG declined to comment when contacted by the ABC. Liam Walter, who handles extreme weather response claims at the Insurance Council of Australia (ICA), said there had been "a bit of frustration" from Harden residents over getting claims processed. He said more than 500 claims for damage from the February storm had been lodged, with about half now closed. "The event that happened here [involved] quite significant, serious damage, so replacing roofs and replacing water damage, it does take a bit of time," he said. "Those that are still open at this point, it will be complexity of the claim, the different types of materials, the different types of repairs will dictate." The ICA, alongside several insurance providers, recently visited Harden to meet with customers over their claims. Twelve properties were left uninhabitable in the wake of the storm, with nine still under repair. Six of them were businesses. "It's always a little bit more challenging to get the volume of repairers and the volume of materials to areas outside the big metro spots," Mr Walter said. He said it was too early to say whether insurance premiums would rise in Harden after the weather event. Hilltops Council general manager Anthony O'Reilly, whose area includes Harden, said the storm caused almost $6 million in damage. A natural disaster was declared, allowing access to grant funding. "We are receiving the majority of that funding from the state government for emergency works and essential works," Mr O'Reilly said. He said several organisations in Harden had to be relocated, including the Rural Fire Service, Flexicare Service and a local pre-school. "It's sad, it's disappointing, you want the community to be vibrant," he said.