
RTA awards $217m contract for Al Qudra street development
Dubai's Roads and Transport Authority (RTA) has awarded the contract worth AED798 million ($217.2 million) for Al Qudra Street Development Project.
The project is designed to optimise traffic flow, improve mobility for residents and visitors throughout the emirate, and support Dubai's ongoing urban development and population growth.
According to RTA, the project extends from the intersection of Al Qudra Street with Sheikh Mohammed bin Zayed Road, continuing through Sheikh Zayed bin Hamdan Al Nahyan Street, and reaching Emirates Road.
It encompasses the development of several interchanges, the construction of bridges totalling 2,700 metres, and the expansion of the existing street by 11.6 km.
The project is set to enhance the street's capacity and decrease travel time from 9.4 minutes to 2.8 minutes. It will also cater to residential and development areas, benefiting an estimated population of 400,000 residents and visitors.
Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of the RTA, said: "Al Qudra Street Development Project is one of the major projects undertaken by RTA to enhance the vertical (East-West) road network. It extends from the intersection of Al Qudra Street with Sheikh Mohammed bin Zayed Road, passing through Sheikh Zayed bin Hamdan Al Nahyan Street, and continues up to Emirates Road."
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Trade Arabia
3 days ago
- Trade Arabia
RTA announces new project for Al Wasl Road upgrade
Dubai's Roads and Transport Authority (RTA) has announced the launch of an integrated project for the upgradation of Al Wasl Road. The development spans 15 km, from the intersection with Umm Suqeim Street to the junction with 2nd December Street. According to RTA, the scope of work involves the upgradation of six intersections, comprising enhancements to one junction and the construction of five tunnels totalling 3,850m. The street will be widened from two to three lanes in each direction, it stated. The project is expected to reduce travel times along Al Wasl Road by 50% and increase capacity from 8,000 to 12,000 vehicles per hour in both directions, it added. Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of the RTA, said: "Al Wasl Road Development Project forms part of a master plan developed by the RTA to upgrade the road network in the area, which also includes enhancements to Umm Suqeim and Al Safa Streets." "These projects are designed with a focus on creative and aesthetic elements, incorporating dedicated pedestrian walkways, cycling tracks, boulevards, and vibrant urban public spaces that promote community interaction. The plan also features decorative landscaping and the creation of dynamic urban environments," he stated. "The project serves a vital district that offers a broad array of modern tourism and lifestyle destinations, including beaches, luxury hotels, fine dining venues, and residential neighbourhoods, home to over one million residents," he added. According to him, the project involves the development of Al Wasl Road from its intersection with Umm Suqeim Street to its junction with 2nd December Street, spanning a total length of 15 km. The street will be widened from two to three lanes in each direction. It also includes the upgrade of six intersections along Al Wasl Road, specifically at Al Thanya, Al Manara, Umm Al Sheif, Umm Amara, Al Orouba, and Al Safa Streets. This will be achieved through the construction of five tunnels with a total length of 3,850m, stated Al Tayer. According to him, the project also includes a 750-m-long tunnel on Umm Al Sheif Street, comprising two lanes in the direction from Sheikh Zayed Road to Jumeirah Street.


Trade Arabia
6 days ago
- Trade Arabia
RTA announces urban project to upgrade Umm Suqeim Street
Dubai's Roads and Transport Authority (RTA) has announced an integrated urban project for the upgradation of Umm Suqeim Street, from its intersection with Jumeirah Street to Al Khail Road. The project is designed to enhance traffic flow in support of the emirate's comprehensive development, address the demands of urban expansion and population growth, and to improve the overall quality of life for both residents and visitors. It complements works currently underway to upgrade Umm Suqeim Street from its intersection with Al Khail Road to Emirates Road, ultimately enabling uninterrupted traffic flow from Jumeirah to Al Qudra Road over a total distance of 20km. The project goes beyond traditional road widening and development by integrating creative and aesthetic enhancements into the surrounding urban landscape. It features upgraded pedestrian walkways, a dedicated cycling track, and complete streets (boulevards), alongside vibrant urban spaces designed to foster community interaction and create inclusive, dynamic environments, said RTA in a statement. It also establishes a direct link between Mall of the Emirates Metro Station and nearby residential communities through targeted improvements that ensure smooth, integrated, and seamless access between these areas and the metro. The project forms part of a master plan developed by RTA to upgrade the road network in the area, including enhancements to Jumeirah Street, Al Wasl Street , and Al Safa Street, details of which will be announced in due course, it stated. Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of the RTA, said: "The upgrade of Umm Suqeim Street, from its intersection with Jumeirah Street to Al Khail Road, forms part of a master plan to develop the Umm Suqeim–Al Qudra corridor. " "This strategic route extends from its intersections with Jumeirah Street throughout to its intersections with Emirates Road to Al Qudra Road, serving key residential and development zones with a combined population exceeding two million," he stated. "The project enhances connectivity across four strategic transport corridors in Dubai - Sheikh Zayed Road, Al Khail Road, Sheikh Mohammed bin Zayed Road, and Emirates Road. It will increase Umm Suqeim Street's capacity to 16,000 vehicles per hour in both directions, significantly improve traffic flow, and reduce travel time between Jumeirah Street and Al Khail Road from 20 minutes to just six," noted Al Tayer. "The upgraded corridor will directly serve vital residential and development areas, including Jumeirah, Umm Suqeim, Al Manara, Al Sufouh, Umm Al Sheif, Al Barsha, and Al Quoz; home to more than two million residents," he added. According to him, the project entails the upgrade of six key intersections along Umm Suqeim Street, specifically those with Jumeirah Street, Al Wasl Street, Sheikh Zayed Road, First Al Khail Street, Al Asayel Street, and Al Khail Road. The scope of work includes the construction of four bridges and three tunnels, with a total combined length of 4,100m. "At the intersection with Jumeirah Street, a tunnel with two lanes in each direction will be constructed, complemented by a signalised surface-level junction," said Al Tayer.


Trade Arabia
29-05-2025
- Trade Arabia
Dubai RTA to open new entry, exit point to Al Warqa
Dubai's Roads and Transport Authority (RTA) is set to open a new entry and exit point to Al Warqa directly from Sheikh Mohammed Bin Zayed Road early next week (start of June), aiming to facilitate smoother access to and from the neighbourhood. Once complete, the project will increase road capacity by 5,000 vehicles per hour, reduce travel time by 80% - from 20 minutes to just 3.5 minutes - and cut trip distances from 5.7 km to 1.5 km. RTA has also completed traffic improvement works on Street 13 in Al Warqa 1 to serve residents and schoolgoers. These enhancements form part of a broader internal road development project spanning approximately 8 km, designed to improve traffic flow and enhance the efficiency of the local road network, ultimately boosting daily mobility and residents' quality of life. RTA reaffirms its commitment to developing an integrated infrastructure network—encompassing roads, lighting, and stormwater drainage systems—within residential areas, in line with Dubai's urban and population growth objectives. This reflects RTA's dedication to meeting residents' aspirations for a modern urban environment that enhances quality of life, supports sustainable mobility solutions, and ensures the highest standards of comfort and well-being. These efforts align with Dubai's vision of becoming a smart, prosperous city that meets the evolving needs of its residents while ensuring their happiness and stability. Development projects in Al Warqa also include upgrades to the internal road networks in Al Warqa 3 and 4. These works involve road paving, the construction of pedestrian walkways, pavements, and parking spaces, along with the implementation of cycling tracks exceeding 23 km in total length. The goal is to enhance connectivity with neighbouring cycle tracks and promote alternative, sustainable modes of transport. According to RTA, the next phase will include capacity enhancements in Al Warqa 1, involving the conversion of existing roundabouts into signalised junctions with smart traffic lights. This is expected to improve traffic flow by up to 30%. These improvements are scheduled for completion by the end of this year, as per the project timeline. Recently, RTA carried out a series of internal road development works in Al Warqa, including traffic enhancements around the School of Research Science in Al Warqa 4 and near GEMS Royal Dubai School. This included the construction of 150 additional parking spaces and the provision of secured entry and exit points for the new parking areas. These measures have contributed to easing congestion and reducing delay times in the school zone by approximately 35% to 50%, it stated. RTA also completed internal roads supporting the Mohammed Bin Rashid Housing Establishment project in Al Warqa 4, which comprises 136 residential villas. The works included pedestrian walkways, pavements, vehicle access points, and a fully integrated lighting system, all aimed at enhancing road safety and improving mobility for residents. In support of sustainable transport, a 7.4 km cycling track was also constructed to encourage cycling for both recreation and as a viable first-and-last-mile transport option. Earlier, RTA held an interactive session with residents and frequent visitors of Al Warqa to highlight key initiatives and development projects in the district. The session also served as a platform for the public to share feedback and observations on infrastructure and the road network. This approach demonstrates RTA's commitment to listening to community voices, addressing their suggestions, and transforming them into practical solutions. The customer engagement session with Al Warqa residents was a key milestone that helped shape a series of development initiatives and projects. These were translated into tangible improvements on the ground, directly enhancing traffic flow and addressing both current and future community needs.