logo
ET World Leaders Forum: From Rajnath Singh to Piyush Goyal, top ministers to address who's who of world Inc

ET World Leaders Forum: From Rajnath Singh to Piyush Goyal, top ministers to address who's who of world Inc

Economic Times5 days ago
Synopsis
Defence Minister Rajnath Singh will inaugurate The Economic Times World Leaders Forum on August 22, uniting over 400 global business leaders, entrepreneurs, investors, and policymakers. Key cabinet ministers Nitin Gadkari and Piyush Goyal will also participate in the two-day event.
Defence minister Rajnath Singh will deliver the opening keynote address at The Economic Times World Leaders Forum on August 22, a signature event that will bring together an illustrious gathering of over 400 business captains, entrepreneurs, investors and policymakers from India and across the globe.
Joining him at the two-day event will be key Cabinet colleagues, minister for road transport and highways Nitin Gadkari and commerce and industry minister Piyush Goyal.
Singh will set the tone for discussions on global challenges and opportunities, along the theme of The Next Global Order: Power, Purpose, Partnership. The forum will discuss key trends shaping the global order—from heightened geopolitical uncertainty and shifting trade dynamics to the disruptive potential of artificial intelligence and other emerging technologies.As defence minister, Singh has focused on strengthening strategic resilience, enhancing technological capabilities and deepening international partnerships. At the helm of India's defence establishment, he has directed game-changing reforms.
These have helped boost defence manufacturing, promote self-reliance and foster innovation-led growth in the sector.
The defence manufacturing sector has seen growth surge in the past few years, with annual production crossing the ₹1.5-lakh crore mark. The private sector's entry has seen companies make significant investments in research and development, besides forging partnerships with overseas technology firms.Gadkari has been responsible for boosting India's road transport connectivity networks with numerous critical projects spanning the length and breadth of the country. His ministry is now pushing for the adoption of green fuel and a reduction in road accidents, besides speeding up the construction of expressways and highways. The Maharashtra-based politician has shifted his focus to quality, from quantity, with regard to road construction.Under Gadkari's leadership, national highways in India grew by 60% to 146,204 km, from 91,287 km in 2014. The vision is to convert 25,000 km of two-lane highways into four lanes at an investment of ₹10 lakh crore, while continuing to add more access-controlled highways and expressways to build a world-class road network ahead of Viksit Bharat by 2047.As commerce and industry minister, Goyal is steering the country's trade policy, while pushing for reforms to ensure ease of doing business for the local industry. His role has become even more critical against the backdrop of US President Donald Trump's tariff charge.Goyal has ensured a robust startup ecosystem and single-window clearances, and been pushing for steps to spur manufacturing. He has also led negotiations that culminated in India's trade accords with the UK, Australia, the United Arab Emirates, Mauritius and the European Free Trade Association. He also steered production linked incentive (PLI) schemes worth ₹1.97 lakh crore aimed at lifting the share of manufacturing in GDP to 25% by 2047, from about 17% currently.Singh's ministry is also undertaking extensive reforms this year, with a goal to establish a new defence acquisition procedure that promises expedited delivery of weapons to the armed forces. The minister has also been a driving force behind reducing India's dependence on arms imports. Flagship projects such as the advanced multi-role combat aircraft, the Astra missile system, fighter jet engine technology and long-range UAVs have been cleared under his direction.All this will go a long way in creating a robust defence and aerospace manufacturing ecosystem. This homegrown strength was visible during Operation Sindoor, with domestically manufactured weapons and systems being key to India's success.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Timeline: How Rajasthan became India's top solar hub in just a decade
Timeline: How Rajasthan became India's top solar hub in just a decade

Business Standard

time7 minutes ago

  • Business Standard

Timeline: How Rajasthan became India's top solar hub in just a decade

A decade ago, Rajasthan's vast desert stretches, scorching in the day and freezing at night, were seen as empty, unforgiving land, hostile to most forms of development. Today, those same empty plains sparkle with millions of solar panels, making the Thar one of the most powerful clean energy engines in the world. From the dusty villages of Jodhpur to the futuristic sprawl of Bhadla, the state has dramatically transformed–no one could have seen that coming. With great policy support, billions in investment, and overwhelming geography, Rajasthan has vastly climbed to the top of India's renewable energy map. What once was a story of survival in the desert has become one of scale, ambition, and leadership in the race to a low-carbon future. Here is how the journey unfolded. The journey of solar power production over a decade The foundation for Rajasthan's solar success was laid in December 2014, when the Centre launched the Solar Parks and Ultra Mega Solar Power Projects Scheme. Rajasthan was among the earliest states to sign up, with Bhadla identified as the flagship site for large-scale development. Just a few years later, in 2017, the Bhadla Solar Park in Jodhpur district began to take shape, attracting major developers such as ACME, Adani, and Hero Future Energies through Solar Energy Corporation of India Limited (SECI) auctions. The same year proved decisive for India's tariff story as well. In May 2017, Bhadla's competitive auctions discovered a record-low solar tariff of ₹ 2.44 per unit, a benchmark that redefined expectations for solar pricing nationwide and continued to shape auctions through 2018. By 2020, Rajasthan's installed solar capacity had grown to about 5.1 GW, a figure that positioned it for the surge to follow. That surge came between 2021 and 2022, when Rajasthan added capacity on an unprecedented scale. In 2022 alone, the state brought online 6.7 GW of new solar and wind power, about 43 per cent of all renewable capacity added in India that year. By June 2022, Rajasthan's large-scale solar had already reached close to 13 GW, thanks largely to central auctions conducted by SECI. The growth story soon began drawing global capital. In 2023, funds such as Brookfield poured money, financing projects in Rajasthan through a ₹3,380-crore pool. Masdar, the Abu Dhabi-based developer, tied up with Hero Future Energies on a 2.2 GW India platform, with 1.5 GW of that capacity linked to projects in Rajasthan and Haryana. Indian companies like ReNew were also continuing to create their presence across the solar clusters in the state. By early 2024, Rajasthan is estimated to be above 20 GW, even tracker companies placing its operational solar base above 21 GW, and this is a lead which none of the other states can match. This trend continued till mid-2025, and official MNRE data demonstrated that Rajasthan had achieved 32.32 GW of solar capacity by July 31. Not only does this establish Rajasthan as India's undisputed leader in renewables, but it also calls itself home to the world's largest solar park in Bhadla at 2,245 MW installed capacity. Why Rajasthan leads in solar power production Rajasthan's dominance in solar energy is rooted in its geography, policy, and scale. The state enjoys consistently high solar irradiation of around 5.5-6.5 kWh/m²/day, coupled with vast stretches of arid land across its western districts that are ideally suited for gigawatt-scale solar parks. The early decision to participate in the Centre's Solar Park Scheme gave Rajasthan a head start, while a clear state framework for aggregating land and setting up park-specific special purpose vehicles reduced developer risk and shortened project timelines. Scale has also been central to Rajasthan's rise. The Bhadla Solar Park, spread across about 56 square kilometers and was developed in multiple phases starting from 2015, became the world's largest single solar park with an installed capacity of 2,245 MW and a showcase of pooled land, ready infrastructure such as roads and pooling stations, and competitive auctions that pushed tariffs to record lows of under ₹2.50 per kWh. Alongside this, investments in transmission under the Green Energy Corridor ensured that power could be evacuated both within and outside the state. Phase II of the corridor, approved in January 2022, is on track for commissioning by March 2026, promising even greater grid flexibility. What's next for renewable energy in Rajasthan Rajasthan's clean energy journey is expanding beyond solar parks and is being taken one step further. The Centre's National Green Hydrogen Mission has already named the state one of two (the other being Ladakh) leading candidates for large-scale hydrogen production in the country. The rationale is simple and logical - Rajasthan has available land and substantial solar potential, making it a suitable area for electrolyser-based projects, resulting in competitively priced green hydrogen. Additionally, the next wave of hybrid projects that integrate solar, wind, and storage technologies is being accommodated with additional transmission corridors under Green Energy Corridor-II. With over 32 GW of solar installed already, the state should comfortably remain India's top state for solar throughout this decade, which is key for the 500 GW renewable energy commitment by 2030, with hybrid parks and larger storage projects leading the next wave of growth.

Mumbai Police files charge sheet against ex-Religare chair Rashmi Saluja, 3 others in ESOP case
Mumbai Police files charge sheet against ex-Religare chair Rashmi Saluja, 3 others in ESOP case

Economic Times

time10 minutes ago

  • Economic Times

Mumbai Police files charge sheet against ex-Religare chair Rashmi Saluja, 3 others in ESOP case

Synopsis Mumbai Police's EOW filed a charge sheet against Rashmi Saluja and three others, alleging irregularities in Care Health Insurance's ESOP allotment. The dispute, linked to a takeover bid by the Burmans, involves accusations of misusing ESOPs and orchestrating a police complaint. Saluja denies the allegations, questioning the basis and legality of the charges. Agencies ex-Religare chair Rashmi Saluja Mumbai: The Economic Offences Wing (EOW) of the Mumbai Police on Monday filed a charge sheet against former Religare Enterprises chairperson Rashmi Saluja and three others in connection with alleged irregularities in the allotment of employee stock options (ESOP) at Care Health Insurance Ltd. A dispute over the ESOP allotment to Saluja at the insurance subsidiary had escalated into a legal battle between Religare's then management and the Burmans who were pursuing to take over the financial services company. The charge sheet filed at a local magistrate's court names Saluja, former Religare finance chief Nitin Aggarwal, ex-group general counsel Nishant Singhal and a Mumbai-based office assistant, Vaibhav Gawli. The EOW investigated the matter after the Enforcement Directorate (ED) in September last year filed a complaint alleging that Saluja and her colleagues conspired to derail the takeover bid for Religare by misusing ESOP allotments and orchestrating a police complaint filed by the office assistant. Gawli was allegedly promised cash and shares in who has challenged the EOW's FIR in the Bombay HC, on Monday called the allegations "mala fide and flawed". She told ET: "When I have never met Gawli or ever communicated with him, how could I get him to lodge a complaint against the Burmans? Also, how could ESOPs be treated as proceeds of crime? They were issued by the board and NRC (nomination & remuneration committee)...why aren't they being questioned?"According to investigators, the insurance regulator had rejected Care Health's proposal to issue 22.71 million stock options, valued at more than ₹250 crore, to Saluja. Still, the company's board in August 2022 granted the ESOPs to her at ₹45.32 per share, to be vested in three tranches. In the same meeting, the board also cleared a ₹300 crore rights issue. The regulator in November 2023 ruled that the ESOPs were granted in violation of sectoral guidelines that cap non-executive director compensation at ₹10 lakh without prior approval.

Delhi-Dehradun Expressway nears completion, may get open on..., plan is to complete work by...
Delhi-Dehradun Expressway nears completion, may get open on..., plan is to complete work by...

India.com

time37 minutes ago

  • India.com

Delhi-Dehradun Expressway nears completion, may get open on..., plan is to complete work by...

New Delhi: PM Narendra Modi inaugurated the Delhi section of Dwarka Expressway and Urban Extension Road-2 in Delhi on Sunday, 17 August. After this, discussions have started on the projects going on in Ghaziabad as to when they will be inaugurated. Recently, Union Minister Nitin Gadkari had talked about the inauguration of the Delhi-Dehradun Expressway by October. In such a situation, it is expected that people can get the gift of the Delhi-Dehradun Expressway on this Diwali. According to the NBT, it was found that about 15% work is still left on the Delhi-Dehradun Expressway. How many parts are ready? The part from Akshardham to Baghpat is completely ready. 10% work is still left in the Baghpat to Saharanpur part. At the same time, about 5 per cent work is left from Saharanpur to Chhutman. The target is to complete both these remaining works by October. The work between Chhutman and Dehradun has been completed. In such a situation, it is being claimed that the Delhi-Dehradun Expressway will be operational by October, according to the NBT reports. How much work is remaining to be completed? At the same time, if NHAI officials are to be believed, more than 90 per cent of the work has been completed, and the remaining work is being completed rapidly. The work will be completed within two months, but sources say that it will be difficult to complete the work within three to four months, according to reports. What was the deadline? It is known that this project was to be completed in March 2024, but the completion of the project is getting delayed. Earlier, some part of it was set to open in January 2025, but later it was postponed. This expressway will mainly connect Delhi, Baghpat, Muzaffarnagar, Shamli, Saharanpur and then Dehradun. Although six lanes have been constructed at most places, for future needs, it can also be expanded from 8 to 12 lanes.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store