
Economic growth tardy, says BJD
Bhubaneswar: The Opposition Biju Janata Dal (BJD) on Saturday came down heavily on the 11-month-old BJP government in Odisha and expressed concern over the prevailing political and economic situation in the State. These issues were discussed in detail at the first meeting of the Political Affairs Committee (PAC) of the BJD, chaired by party president Naveen Patnaik, PAC member Niranjan Pujari told reporters. The PAC is the highest decision-making body of the regional party.
'The PAC expressed concern on the tardy pace of economic and industrial development in the State and demanded that the BJP government should work towards economic development instead of wasting taxpayers' money on changing the colour and name of BJD-era schemes for political gains,' Pujari said.
In a statement, the party said the PAC also discussed the prevailing political situation of the State and expressed concern on various problems faced by people. 'It was hoped that the government would take steps to overcome the current stagnation in the development sectors and fulfil the aspirations of people,' the party said. 'The meeting paid tributes to the 26 people who lost their lives in the Pahalgam attack,' Pujari said, adding that the regional party praised the unparalleled skill, courage and strength of the Indian armed forces for the success of 'Operation Sindoor'. 'The valour exhibited by the armed forces has made India proud. BJD is proud of the Indian Army,' he said.
Expressing concern over the alleged 'stagnation' in the development sector, the BJD praised party president Naveen Patnaik for the remarkable progress achieved under his leadership in industrial development, as highlighted in a recently published ICRA Report.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
36 minutes ago
- Time of India
12k of SAIL's 16k tonnes of steel for tallest rail bridge supplied by Bhilai plant
Raipur: The Steel Authority of India Ltd (SAIL) has played a pivotal role in the construction of the world's tallest railway bridge over the Chenab River in Jammu & Kashmir, supplying a total of 16,000 tonnes of steel — with its Bhilai Steel Plant alone contributing 12,000 tonnes to the project. Tired of too many ads? go ad free now A senior official from the Bhilai plant confirmed the figure on Friday, hailing it as a proud moment for the Indian steel industry and a major milestone in nation-building. The Chenab Railway Bridge, inaugurated by Prime Minister Narendra Modi on June 6, 2025, is now the highest railway arch bridge on the planet, rising 359 metres above the riverbed — even taller than the Eiffel Tower. The bridge is part of the strategically crucial Udhampur-Srinagar-Baramulla Rail Link (USBRL) project and aims to bring seamless all-weather connectivity to Kashmir, significantly improving both civilian and military mobility. SAIL's contribution to the bridge included a wide range of steel products such as TMT bars, heavy plates, structural steel, and hot strip mill products. From the total volume supplied, the Bhilai Steel Plant alone provided 5,922 tonnes of TMT bars, 6,454 tonnes of steel plates, and 56 tonnes of structural steel. The remaining steel was delivered by SAIL's IISCO, Durgapur, Rourkela, and Bokaro plants. Officials said that the construction of this 1.3 kilometre long bridge involved the use of approximately 29,000 metric tonnes of fabricated steel, over 10 lakh cubic metres of earthwork, 66,000 cubic metres of concrete, and a vast network of 84 kilometres of cable anchors and rock bolts. Engineered to endure wind speeds of up to 266 kmph and strong earthquakes, the bridge is being seen not just as an engineering feat, but a strategic lifeline to India's northern frontier. SAIL's Bhilai Steel Plant, known for producing high-grade TMT bars with earthquake- and corrosion-resistant properties, has been a consistent contributor to key national infrastructure. Its steel has previously been used in iconic structures like the Bandra-Worli Sea Link, Atal Setu, Sela and Atal Tunnels, and even in defence applications including warships like INS Vikrant. Tired of too many ads? go ad free now According to the Bhilai plant official, the bridge is yet another example of how SAIL's quality steel is powering India's most ambitious projects. "From high-altitude tunnels to bullet trains and now the world's tallest railway bridge, SAIL steel — especially from Bhilai — is proving essential to India's infrastructure push," the official said.


Time of India
36 minutes ago
- Time of India
Maharashtra has big dams, but we face water imbalance: CM
Nagpur: Maharashtra's deep regional water disparities persist despite hosting some of India's largest irrigation projects, said chief minister Devendra Fadnavis at the Vidarbha Pani Parishad. "Big dams alone can't resolve the issue. The real solution lies in small, sustainable conservation structures," he stated, advocating for localised water planning. He highlighted the success of Jalyukt Shivar under the Baliraja Project, which ensured convergence of departments under district collectors, boosting participation and impact. Fadnavis also backed the Centre's move to suspend the Indus Water Treaty, calling it the "deadliest blow" to Pakistan and a precursor to "Operation Sindoor." He warned that water wars are no longer distant possibilities, urging wise use and conservation amid mounting national and global water stress. "Water has been at the heart of civilisations — from the Saraswati to Sindhu to African rivers," said Fadnavis, adding that in modern times, unchecked use, especially in agriculture, has become a major concern. "Whenever water availability rises, we shift to cash crops and overuse it. We must act wisely in usage and conservation." Speakaing about Jalyukt Shivar, he said, "Unlike earlier fragmented schemes split across 14 departments, this one was coordinated under district collectors. All officials, irrespective of departments, reported directly to the collector. This streamlined planning, execution, and participation." With Rs700 crore raised through public contribution, the scheme benefited over 20,000 villages, notably in Marathwada, improving groundwater levels. A 2018 HC petition led to an expert panel, which verified the scheme's success. In 2020, the Centre's Groundwater Report confirmed Maharashtra as the only state with consecutive annual water level rises. "Even with just 75% rainfall, we faced no scarcity," he said. Among key projects, Fadnavis cited the Wainganga-Nalganga river-linking initiative — a 500km project spanning seven districts in Vidarbha — aimed at redirecting surplus water toward the Godavari basin. Similar efforts include five other river-linking schemes and the Tapi Water Recharge Project, set to shift 35 TMC water to saline-affected areas. Since 2014, the state has completed 90 irrigation projects, including the near-completion Gosikhurd Dam. Post-2017, it has shifted to piped distribution systems, saving 8 TMC of water and boosting efficiency. Fadnavis also praised Israel's water practices, such as micronutrient delivery and precision irrigation, as models being adopted in Maharashtra. He flagged river and nullah pollution, attributing 90% of it to untreated domestic waste. "Industries get blamed, but citizens are major contributors," he said, urging better sewage systems in cities like Nagpur, Pune, and Mumbai. Warning of rising inter-district water conflicts like Nashik vs Marathwada, Fadnavis stressed that solutions, not demands, are the way forward. Earlier, Nagpur University's acting vice-chancellor Madhavi Khode Chaware inaugurated the Wainganga Water Exhibition at Vanamati. Over 150 students, scholars, and activists participated, showcasing posters, research papers, and models focused on water conservation and sustainability. (Inputs by Krisha Panchmatia) * * * * **************** THE WATER STORY * Rs 700 crore raised by villagers under Jalyukt Shivar Yojana 20,000 villages benefited under Jalyukt Shivar 90 irrigation projects completed since 2014 8 TMC water saved through efficient usage methods 3%: Water absorption rate in Maharashtra, (compared to 22% in Uttar Pradesh) 56 TMC water from Konkan redirected to Godavari 35 TMC water under Tapi Water recharge Project 500 km new river being created under Wainganga–Nalganga river linking


Time of India
36 minutes ago
- Time of India
Procurement rules for scientific research eased
Mumbai: In a resounding shift, the ministry of finance eased a long-standing bottleneck in procurement rules that once tethered researchers to the govt e-Marketplace (GeM), now allowing them to source scientific equipment and consumables from outside it. The revision in monetary ceilings and procurement channels, officials say, required the direct intervention of Prime Minister Narendra Modi. For the scientific community, this isn't just administrative reform—it's an acknowledgment and a huge relief. "Science cannot be caged in platforms and progress cannot always be L1," said a frustrated scientist, who said procurement was running into long delays because of cost and quality issues. The spirit behind GeM portal is, in principle, noble, said most scientists—designed to uplift Indian suppliers and foster a self-reliant manufacturing ecosystem. "But behind the digital veneer of transparency and procurement lies a troubling reality." "As a scientist, I ask—what truly serves the nation? If I want to order a computer that serves my requirements today, I cannot buy one unless it is L1," said professor at the School of Biotechnology at Jawaharlal Nehru University, Binay Panda. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like The Most Successful Way of Intraday Trading is "Market Profile" TradeWise Learn More Undo Five amendments have been made to existing procurement rules. Vice-Chancellors and directors of India's top scientific and academic institutions no longer have to wait for clearances to procure scientific equipment and consumables for research. Under the newly eased rules, they now hold the power to approve Global Tender Enquiries—up to a staggering Rs 200 crore—if they believe the need is justified. No central nod, no extra scrutiny. Just their judgment. Similarly, the ceiling for direct purchases—those made without quotations—has been raised from Rs 1 lakh to Rs 2 lakh. And what once required a drawn-out trail of tenders—purchases from Rs 1 to 10 lakh—can now be cleared by a purchase committee for anything up to Rs 25 lakh. Additionally, the limits on limited tender enquiry have been lifted—from Rs 50 lakh to Rs 1 crore. And perhaps, most telling of all, said scientists—the need for open tenders—earlier triggered at Rs 50 lakh—will now apply only to purchases above Rs 1 crore. Minister of State for Science and Technology, Jitendra Singh, took to social media and termed this as "a landmark step" for enabling #EaseOfDoingResearch. "This will reduce delays, also enhance autonomy and flexibility for research institutions—empowering them to innovate faster," he added. Secretary of the Department of Science and Technology, Prof Abhay Karandikar, said, "It was made possible by the collective efforts of everyone, including other scientific secretaries, PSA, Department of Expenditure and Cabinet Secretariat. " Another scientist explained that in this "algorithm-driven marketplace, the lowest bidder always wins, never mind if the product fails the test of quality. What use is cost-efficiency if it sacrifices precision and most importantly, the requirements of a scientific experiment? What use is patriotism if it's only glued on?" "They don't really make these products here," added Prof Panda. "They import many parts, assemble them locally, and slap on a Make in India sticker—as if that alone sanctifies the machine." He quickly added, "If there is a good Indian product, we do not think twice. We prefer make-in-India by default—it's more affordable, support is better, and it's close by." Most scientists echoed this. However, "We don't want to buy an Indian product if science suffers. "