
Frauds & Fearful Citizens
Times of India's Edit Page team comprises senior journalists with wide-ranging interests who debate and opine on the news and issues of the day.
By Partha Sinha
Try calling anyone in India these days – your chartered accountant, your daughter, your dentist – and before the first ring, you're ambushed by a govtissued voice note warning you about digital scams. It drones on with the cadence of a Sanskrit recital stuck in bureaucratic purgatory. 'Satark rahein,' it begins solemnly.
And satark you shall remain, for the next ninety-five seconds, as the audio wanders through a litany of QR codes, OTPs, and cautionary maxims.
Read full story on TOI+
Facebook Twitter Linkedin Email
This piece appeared as an editorial opinion in the print edition of The Times of India.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
No need of slum-dwellers' nod for Dharavi project, says CEO
MUMBAI : Responding to queries on the resistance to the Dharavi redeveloment project from a section of slum-dwellers, its CEO, S V R Srinivas , told TOI that more than 50% of the residents have already consented to the project. But more significantly, he revealed that the project did not require public consent in the first place because the developer had been appointed by the state govt. "Under the SRA rules, the building society appoints the developer. For that, 50% consent is required. But here, the govt has appointed the developer. In this case, there is no need for consent," said Srinivas in an exclusive interview to TOI. The project is being implemented by Nav Bharat Mega Developers Pvt Ltd, an SPV in which the Adani Group holds 80% stake and the govt 20%. The land on which Dharavi stands is owned by the govt and the BMC. Srinivas said around 1 lakh slum-dwellers had responded to the house-to-house survey and just around 20,000 remained to be surveyed. So even if the 50% consent parameter was applied, it had already been crossed, he said. Participation in the door-to-door survey on eligibility for rehabilitation translated into consent, he clarified. "They have given their documents voluntarily. There is a line in the survey which says they are willing to participate in the redevelopment. So, when they sign, it is consent," said Srinivas. Although consent is not required for the project, the govt had made multiple efforts to get residents to respond to the survey and agree to the project, he emphasised. "We don't want to ride roughshod on anybody. We have already given four opportunities. We put it in the newspaper and then we also put it on their doors," he said. Srinivas said that the survey was still ongoing but roughly 5 lakh eligible tenements would need to be given free space within Dharavi and 5 lakh ineligible tenements would have to move out to subsidised rental housing outside Dharavi. But the question is: Why a massive expanse of 541 acres of land has been earmarked for rental housing and a free sale component for the Adani-led SPV? This has fuelled allegations from the opposition that the project is essentially a "land-grab" to capture lucrative real estate both within and outside Dharavi. The 541 acres for rental housing have been allocated in Deonar, Kurla, Aksa, Malvani and salt pan lands in Bhandup, Mulund and Kanjurmarg. Of this, possession has been given of 63.5 acres so far in Kurla and Mulund. Srinivas said the land meant for rental housing was in the possession of the state's DRP and was not with the Adani-led SPV. "The problem is that there is a shortage of land in Mumbai. We had written to many different agencies including from the central government for these lands. In some cases, there were rejections. So, we did not know which lands would come and we started applying to different places," he said. "Now these lands are coming but they will be with the DRP. Unless people are rehabilitated, the land will not be given to the SPV," he said. He also said that rental units would be built in phases. If all the land was not required, then all the parcels would not be used. The land which is not used from the 541 acres would then revert from the DRP to the govt. "Our mandate is limited to Dharavi. The land that is not used, will revert to the govt," said Srinivas. Responding to questions about the basis on which the project has been planned since the door-to-door survey on eligible and ineligible tenements is yet to be completed, Srinivas said, "There was initially a drone survey followed by a LIDAR survey to map the structures in the area. And now there is a physical door-to-door survey, which is almost complete. Based on these three, we did a comparison and an extrapolation of data, which is how it works. In projects of this size, some things can go on simultaneously," he said.


Time of India
2 hours ago
- Time of India
Chhattisgarh: Sukma ASP Akash Rao Giripunje killed in IED blast, 2 cops injured
Akash Rao Giripunje RAIPUR: An Additional SP was killed and at least two cops severely injured in a major pressure IED blast planted by Maoists targeting security forces in Chhattisgarh's Sukma district in Bastar on Monday morning. Additional Superintendent of Police (ASP) Akash Rao Giripunje who sustained critical injuries in the blast, succumbed soon after the incident, officials told TOI. The incident took place near Dondra village on the Konta–Errabore road earlier today. According to police sources, ASP Giripunje was on foot patrol duty as part of a pre-emptive security operation ahead of the Bharat Bandh called by CPI (Maoist) on June 10. The patrol was aimed at thwarting any potential Maoist disruption in the highly sensitive region. During the operation, a pressure-activated Improvised Explosive Device (IED) went off, resulting in serious injuries to ASP Giripunje and causing harm to several other officers and security personnel accompanying him. Immediate assistance was rushed to the site, and the injured were transported to Konta Hospital for medical attention. ASP Akash Rao's condition was reported to be extremely critical and fragile, prompting swift efforts to airlift and shift him to a higher medical facility for advanced treatment. But he couldn't be saved, an officer confirmed to TOO. Other injured personnel are currently stated to be out of immediate danger, officials said. This incident comes at a time when security forces are on high alert across the Bastar region. Senior police officials have condemned the attack and reiterated the force's commitment to counter-insurgency operations in the region. Further details and a comprehensive report are awaited.


Time of India
4 hours ago
- Time of India
After Gurjar mahapanchayat, protesters block tracks in Rajasthan; 12+ trains delayed despite govt nod to 5% MBC reservation
After Gurjar mahapanchayat, protesters block tracks in Rajasthan; 12+ trains delayed despite govt nod to 5% MBC reservation JAIPUR/ALWAR: Disgruntled elements who participated in the Gurjar mahapanchayat, called by Gurjar Aarakshan Sangharsh Samiti convenor Vijay Bainsla in Bharatpur's Peelupura Sunday, damaged railway tracks and halted the Kota-Mathura passenger train on the busy Delhi-Mumbai line. The two-hour disruption, which had a cascading effect on the movement of over 12 trains scheduled on the line, was unleashed by an unruly group of youths after Bainsla called off the mahapanchayat following the Rajasthan govt's acceptance of the community's charter of demands, including one to include the 5% MBC reservation in the 9th Schedule. "We are happy with the govt's statement today. For the first time, the state govt has decided to approve the inclusion of the 5% MBC quota in the 9th Schedule of the Constitution in the state cabinet. Once it is approved in the state cabinet, the govt will send it to the Centre for further processing. We thank the chief minister for this," Bainsla told TOI. Angry Gurjar youths, who demanded immediate action from the govt, however, blocked the busy Delhi-Mumbai railway line for over two hours, from 4:30 pm, damaging about one km of the tracks about 150 meters away from the site of the mahapanchayat. As a result of the protests, Avadh Express that runs from Bandra Terminus to Barauni Junction in Bihar was halted at Fateh Singhpura station, while Saugor-Nizamuddin train was stopped at Sawai Madhopur station. As protests started to spread, IG Bharatpur zone, district collector, and SP arrived at the scene and persuaded the protesters to vacate the area, managing to clear the track by 6:30 pm. "The halted train departed after a team of DRM Kota repaired the tracks. All the protesters dispersed. I spoke to a few remaining protesters at the spot who have also been dispersed," said Rahul Prakash, IG Bharatpur Range. Prakash said rail movement was restored on the Delhi-Mumbai route via Karwadi-Pillu Ka Pura route on the Bayana section. Senior Divisional Commercial Manager, Kota division of West Central Railways (WCR), Sourabh Jain, said, "We were informed at 4:33 pm on Sunday that some people moved on to sit on the railway track between Fateh Singh Pura and Dumariya Stations near Pillu Ka Pura. The train no. 54794 Mathura-Sawaimadhopur fast passenger train was halted in the section." "In coordination with State Police and Railways, the people on the track were removed at 6:46 pm through convincing and pursual. The 54794 passenger train has departed from the halt, and other trains have also resumed on track. In the entire episode, around 10-12 trains suffered delays," he added. Sunday's mahapanchayat was called despite the Rajasthan govt, through home minister Jawahar Singh Bedam, conveying that it would address the demands raised by the community, including full benefits of 5% reservation in govt jobs and education for most backward classes (MBCs). Bainsla read out the govt draft to the community members, after which it was unanimously agreed to call off the mahapanchayat. However, several community members opposed the govt draft and decided to block the railway tracks. Following the protest, Bainsla and other committee members left the venue, after which angry youths decided to move their protests to the rail tracks.