logo
Total Economic Impact™ Study Finds 201% ROI for Companies Using Temporal Cloud

Total Economic Impact™ Study Finds 201% ROI for Companies Using Temporal Cloud

Business Wire28-05-2025

SEATTLE--(BUSINESS WIRE)-- Temporal Technologies, the inventors of open-source durable execution platform Temporal.io and Temporal Cloud, today announced the results of a new Total Economic Impact™ (TEI) study conducted by Forrester Consulting. Commissioned by Temporal, the study found that organizations using Temporal Cloud, the company's enterprise-grade managed service, achieved a 201% return on investment over three years with a payback period of just 14 months.
The study is based on interviews with multiple Temporal Cloud customers across financial services, transportation, entertainment, and food services. By analyzing these real-world deployments, Forrester found that Temporal Cloud significantly improved reliability, development velocity, and engineering productivity.
Key quantified benefits include:
Improved reliability: Avoided up to two major outages per year, preserving $14.3M in revenue and $1.5M in operating profit
Faster time to market: Cut feature development time in half, driving $1.7M in additional operating profit
Higher developer productivity: Freed up engineers to focus on innovation, delivering $1M in productivity gains over three years
'Temporal has added a level of clarity and reliability to some of our most complicated and critical processes and, (with Temporal Cloud), the cost is a fraction of what it would cost to pay a team to manage those resources internally,' said a Senior Engineering Manager in the transportation industry.
Customers also cited advantages of adopting Temporal Cloud, including:
Better employee experience and retention by reducing cognitive load on developers and increasing team satisfaction
Cost savings from retiring legacy workflow infrastructure and homegrown orchestration tools
Scalability and speed to support critical business workflows during high-volume events or AI-driven workloads
Improved compliance and data security through encryption and architectural flexibility
'Engineering teams need to move faster without sacrificing reliability,' said Samar Abbas, co-founder and CEO of Temporal. 'Temporal Cloud gives them that foundation. Ready to scale, battle-tested, and easy to adopt – it's why we're seeing growth across AI, payments, and every system where failure isn't an option.'
The release of the TEI study follows a banner year for Temporal. The company recently announced a $146 million Series C funding round at a $1.72 billion valuation, 4.4x growth in Temporal Cloud revenue, and adoption by more than 2,500 customers globally.
The full Forrester TEI study is available for download here: https://temporal.io/pages/forrester-tei-report
To learn more about Temporal Cloud, visit: https://temporal.io/cloud
About Temporal
Temporal is changing how modern software is built through its open-source Durable Execution platform. By guaranteeing the execution of complex workflows even in the face of system failures, Temporal allows developers to focus entirely on business logic rather than infrastructure complexities—increasing developer velocity. Its polyglot capabilities allow seamless orchestration across multiple programming languages, making it ideal for both traditional enterprise applications and next-generation AI workloads. Temporal Cloud, the company's managed service backed by the originators of the project, has been adopted by thousands of leading enterprises. Learn more at www.temporal.io.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

ABL Investors Have Opportunity to Join Abacus Global Management, Inc. Fraud Investigation with the Schall Law Firm
ABL Investors Have Opportunity to Join Abacus Global Management, Inc. Fraud Investigation with the Schall Law Firm

Business Wire

timea day ago

  • Business Wire

ABL Investors Have Opportunity to Join Abacus Global Management, Inc. Fraud Investigation with the Schall Law Firm

LOS ANGELES--(BUSINESS WIRE)-- The Schall Law Firm, a national shareholder rights litigation firm, announces that it is investigating claims on behalf of investors of Abacus Global Management, Inc. ('Abacus' or 'the Company') (NASDAQ: ABL) for violations of the securities laws. The investigation focuses on whether the Company issued false and/or misleading statements and/or failed to disclose information pertinent to investors. Abacus is the subject of a report issued by Morpheus Research on June 4, 2025, titled: 'Abacus Global Management: This $794 Million SPAC Is Yet Another Life Settlements Accounting Scheme Manufacturing Fake Revenue by Systematically Underestimating When People Will Die.' According to the report, the Company changed its portfolio valuation methodology to make it appear more profitable than it actually is. The report also alleges that the Company uses unusual methodologies to calculate life expectancy estimates and its co-founders have 'red flags' in their past. If you are a shareholder who suffered a loss, click here to participate. We also encourage you to contact Brian Schall of the Schall Law Firm, 2049 Century Park East, Suite 2460, Los Angeles, CA 90067, at 310-301-3335, to discuss your rights free of charge. You can also reach us through the firm's website at or by email at bschall@ The Schall Law Firm represents investors around the world and specializes in securities class action lawsuits and shareholder rights litigation. This press release may be considered Attorney Advertising in some jurisdictions under the applicable law and rules of ethics.

Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA
Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA

Yahoo

time2 days ago

  • Yahoo

Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA

All amounts in Canadian dollars unless specified otherwise SASKATOON, Saskatchewan, June 06, 2025--(BUSINESS WIRE)--Cameco (TSX: CCO; NYSE: CCJ) reports an expected increase of approximately $170 million (US) in our 49% equity share of Westinghouse Electric Company's (Westinghouse) 2025 second quarter and annual adjusted EBITDA. The expected increase is tied to Westinghouse's participation in the construction project for two nuclear reactors at the Dukovany power plant in the Czech Republic. This expected increase will be taken into consideration in determining the 2025 distribution payable by Westinghouse to Cameco. In addition to the increase in adjusted EBITDA in 2025, we expect significant financial benefits for Westinghouse, as a subcontractor, over the term of the Dukovany construction project and related to the provision of the fuel fabrication services required for both reactors for a specified period. The outlook for Westinghouse's compound annual growth rate for adjusted EBITDA remains 6% to 10% over the next five years, excluding the impact of the expected $170 million (US) increase in its 2025 adjusted EBITDA. Cameco owns a 49% interest in Westinghouse and its partner, Brookfield Renewable Partners, owns the remaining 51%. Caution about forward-looking informationThis news release includes statements and information about our expectations for the future, which we refer to as forward-looking information. Forward-looking information is based on our current views, which can change significantly, and actual results and events may be significantly different from what we currently expect. Examples of forward-looking information in this news release include our expectations regarding: Westinghouse's participation in the Dukovany power plant construction project; an increase in Westinghouse's adjusted EBITDA; Westinghouse taking this increase into consideration in determining the 2025 distribution payable to Cameco; the financial benefits for Westinghouse, as subcontractor, over the term of the Dukovany construction project and the expected future growth in Westinghouse's compound annual growth rate for adjusted EBITDA. Material risks that could lead to different results include the risk that Westinghouse is not able to participate in the Dukovany construction project on a basis that achieves the currently expected benefits to Westinghouse for any reason, or that Cameco may not derive the expected increases in its share of Westinghouse's adjusted EBITDA, or that Westinghouse does not achieve the expected future annual growth in adjusted EBITDA. In presenting the forward-looking information, we have made material assumptions which may prove incorrect about Westinghouse's participation in the Dukovany construction project and related potential benefits to Westinghouse, and continuing growth in Westinghouse's compound annual growth rate for adjusted EBITDA. Non-IFRS MeasuresAdjusted EBITDA is a measure that does not have a standardized meaning or a consistent basis of calculation under International Financial Reporting Standards (a non-IFRS measure). Westinghouse's adjusted EBITDA is defined as its net income, adjusted for the impact of certain expenses, costs, charges or benefits incurred in such period which are either not indicative of underlying business performance or that impact the ability to assess the operating performance of its business. For more information regarding our use of this non-IFRS measure see our most recent annual and quarterly Management's Discussion and Analysis. ProfileCameco is one of the largest global providers of the uranium fuel needed to power a secure energy future. Our competitive position is based on our controlling ownership of the world's largest high-grade reserves and low-cost operations, as well as significant investments across the nuclear fuel cycle, including ownership interests in Westinghouse Electric Company and Global Laser Enrichment. Utilities around the world rely on Cameco to provide global nuclear fuel solutions for the generation of safe, reliable, carbon-free nuclear power. Our shares trade on the Toronto and New York stock exchanges. Our head office is in Saskatoon, Saskatchewan, Canada. As used in this news release, the terms we, us, our, the Company and Cameco mean Cameco Corporation and its subsidiaries unless otherwise indicated. View source version on Contacts Investor inquiries Cory Kos 306-716-6782 cory_kos@ Media inquiries Veronica Baker 306-385-5541 veronica_baker@ Sign in to access your portfolio

Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA
Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA

Yahoo

time2 days ago

  • Yahoo

Cameco Reports Expected Increase in Its Share of Westinghouse 2025 Adjusted EBITDA

All amounts in Canadian dollars unless specified otherwise SASKATOON, Saskatchewan, June 06, 2025--(BUSINESS WIRE)--Cameco (TSX: CCO; NYSE: CCJ) reports an expected increase of approximately $170 million (US) in our 49% equity share of Westinghouse Electric Company's (Westinghouse) 2025 second quarter and annual adjusted EBITDA. The expected increase is tied to Westinghouse's participation in the construction project for two nuclear reactors at the Dukovany power plant in the Czech Republic. This expected increase will be taken into consideration in determining the 2025 distribution payable by Westinghouse to Cameco. In addition to the increase in adjusted EBITDA in 2025, we expect significant financial benefits for Westinghouse, as a subcontractor, over the term of the Dukovany construction project and related to the provision of the fuel fabrication services required for both reactors for a specified period. The outlook for Westinghouse's compound annual growth rate for adjusted EBITDA remains 6% to 10% over the next five years, excluding the impact of the expected $170 million (US) increase in its 2025 adjusted EBITDA. Cameco owns a 49% interest in Westinghouse and its partner, Brookfield Renewable Partners, owns the remaining 51%. Caution about forward-looking informationThis news release includes statements and information about our expectations for the future, which we refer to as forward-looking information. Forward-looking information is based on our current views, which can change significantly, and actual results and events may be significantly different from what we currently expect. Examples of forward-looking information in this news release include our expectations regarding: Westinghouse's participation in the Dukovany power plant construction project; an increase in Westinghouse's adjusted EBITDA; Westinghouse taking this increase into consideration in determining the 2025 distribution payable to Cameco; the financial benefits for Westinghouse, as subcontractor, over the term of the Dukovany construction project and the expected future growth in Westinghouse's compound annual growth rate for adjusted EBITDA. Material risks that could lead to different results include the risk that Westinghouse is not able to participate in the Dukovany construction project on a basis that achieves the currently expected benefits to Westinghouse for any reason, or that Cameco may not derive the expected increases in its share of Westinghouse's adjusted EBITDA, or that Westinghouse does not achieve the expected future annual growth in adjusted EBITDA. In presenting the forward-looking information, we have made material assumptions which may prove incorrect about Westinghouse's participation in the Dukovany construction project and related potential benefits to Westinghouse, and continuing growth in Westinghouse's compound annual growth rate for adjusted EBITDA. Non-IFRS MeasuresAdjusted EBITDA is a measure that does not have a standardized meaning or a consistent basis of calculation under International Financial Reporting Standards (a non-IFRS measure). Westinghouse's adjusted EBITDA is defined as its net income, adjusted for the impact of certain expenses, costs, charges or benefits incurred in such period which are either not indicative of underlying business performance or that impact the ability to assess the operating performance of its business. For more information regarding our use of this non-IFRS measure see our most recent annual and quarterly Management's Discussion and Analysis. ProfileCameco is one of the largest global providers of the uranium fuel needed to power a secure energy future. Our competitive position is based on our controlling ownership of the world's largest high-grade reserves and low-cost operations, as well as significant investments across the nuclear fuel cycle, including ownership interests in Westinghouse Electric Company and Global Laser Enrichment. Utilities around the world rely on Cameco to provide global nuclear fuel solutions for the generation of safe, reliable, carbon-free nuclear power. Our shares trade on the Toronto and New York stock exchanges. Our head office is in Saskatoon, Saskatchewan, Canada. As used in this news release, the terms we, us, our, the Company and Cameco mean Cameco Corporation and its subsidiaries unless otherwise indicated. View source version on Contacts Investor inquiries Cory Kos 306-716-6782 cory_kos@ Media inquiries Veronica Baker 306-385-5541 veronica_baker@

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store