logo
Parts of Zululand region remain without electricity

Parts of Zululand region remain without electricity

The Citizen11-06-2025
Parts of Zululand region remain without electricity
Following Tuesday's severe weather across KZN, which led to a widespread power outage, Eskom technicians continue to work diligently to repair the damage.
According to Eskom's KZN industry support and stakeholder management Stefanie Jansen van Rensburg, while some areas have been restored, the persistent weather conditions, as well as the extent of the damage coupled with access challenges, have hampered restoration efforts.
ALSO READ: Severe weather causes widespread power outages across KZN
'Eskom apologises for the inconvenience, and appreciates customers' patience and understanding during this time,' said Van Rensburg.
Outstanding areas being attended to in the Zululand region include Empangeni, Melmoth, Mtubatuba, Ulundi, Hluhluwe, Jozini, Nongoma and eShowe.
Customers who are still experiencing power outages are encouraged to log a fault using any of Eskom's available self-service channels, such as:
• MyEskom customer app: available for download on Google Play and Apple Store
• Alfred the Chatbot: https://alfred.eskom.co.za/chatroom. Also available on WhatsApp: 08600 37566
• USSD platform: dial *120*37566# and follow the prompts
• Eskom Contact Centre: 08600 ESKOM (37566)
Don't have the ZO app? Download it to your Android or Apple device here:
HAVE YOUR SAY
Like our Facebook page and follow us on Twitter.
For news straight to your phone invite us:
WhatsApp – 060 784 2695
Instagram – zululand_observer
At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

KZN's South Coast residents plagued by municipal crises lose hope after monthlong water cut-offs
KZN's South Coast residents plagued by municipal crises lose hope after monthlong water cut-offs

Daily Maverick

time18 hours ago

  • Daily Maverick

KZN's South Coast residents plagued by municipal crises lose hope after monthlong water cut-offs

The Ugu District Municipality on Monday said the restoration of the water supply to the Lower South Coast was imminent — but residents weren't holding their breath. 41 – that's the number of days that residents of the KwaZulu-Natal Lower South Coast have had some semblance of running water from their taps this year. This is according to Banners Rest resident and former municipal councillor Dave Watson, who has been keeping a spreadsheet calendar on water cut-offs and interruptions since 2022. Watson said the last time his area had an uninterrupted water supply for longer than 24 hours was last year. During the current outage Watson has been without water for 32 days. 'This is a new record for us in Banners Rest, after more than three years of no water supply or inadequate water supplies,' Watson said. In response to queries from the Daily Maverick on Monday, 18 August, the Ugu District Municipality said: 'It is anticipated that water supply will be restored to Leisure Bay, Glenmore, Port Edward and Banners Rest by this evening or early tomorrow.' But residents were not holding their breath. A 12-hour electricity shutdown at the Umtamvuna Water Treatment Works led to water cut-offs that have dragged on for weeks, to the frustration of nearly 190,000 residents stretched between Port Edward in the south, Southbroom in the north and inland areas that include Izingolweni, KwaXolo and KwaNzimakwe. 'Tomorrow never seems to come. We were told yesterday that water was coming back 'tomorrow', and the same story the day before … yet, here we are with no water after nearly 30 days — so let's wait and see tomorrow,' commented Democratic Alliance ward councillor Stephanie Breedt. Breedt noted that Eskom had been scheduled to shut down the power supply at the Umtamvuna purification plant for half a day earlier this month to enable the installation of a temporary power supply that would have allowed an extra water extraction pump to be installed. She noted that the Ugu District Municipality had been plagued by water shortages for several years, partly because there was insufficient electricity to power additional water abstraction pumps on the Umtamvuna River. In 2019, the council paid Eskom R14-million to install additional power that would allow four pumps to suck water from the river for purification. Breedt said a further R2.5-million was paid to Eskom this year to provide a temporary supply to a third pump. Eskom did conduct emergency work at the Umtamvuna treatment works this month, yet for reasons not fully explained, 36 local water reservoirs dried up soon afterwards and Ugu was forced to revert to using its existing two pumps rather than the hoped-for three pumps. Veteran journalist Fred Kockott, a resident of Port Edward and founding director of Roving Reporters, was heading off to the local Methodist church on his motorbike to replenish his water supplies when contacted for comment on 18 August. For the last 30 days, Kockott has been travelling to the church regularly to ferry water home in a backpack and a wooden crate strapped to his motorbike. Permanent solution While the current crisis might be resolved by 'Band-Aid' measures, he said a permanent solution was needed. 'Granted, there are serious challenges faced in extending basic water supply to previously unserviced outlying areas, but to allow existing infrastructure to collapse to this extent is clearly a human rights offence, deserving intervention and prosecution.' Two separate sources have suggested that the underlying cause of the latest problems is opposition from a community group in the neighbouring Eastern Cape province that blocked plans to run a new Eskom power supply line from that province into KwaZulu-Natal to relieve the power shortages at the Umtamvuna purification works. They suggested that certain community members had insisted that they were facing water and electricity supply shortages that should be resolved before any additional power was supplied to KZN. The Ugu District Municipality said that Eskom had conducted a scheduled shutdown at Umtamvuna this month to connect additional power supplies, but 'unforeseen technical complications arose during the process, and work is currently ongoing to resolve these issues'. The municipality acknowledged that this led to 'significant inconvenience for both the coastal and inland communities' and that municipal staff were collaborating with Eskom's Eastern Cape technical division to provide further power to the Umtamvuna water works. On Monday, an Eskom spokesperson said the utility required more time to respond to Daily Maverick's queries. We also asked Ugu officials to explain the full nature of the 'unforeseen technical complications'. A municipal spokesperson responded: 'Following the restoration of power, it was subsequently identified that a voltage imbalance had occurred, thereby compromising the safety and stability of the electricity supply. 'This unforeseen technical issue necessitated an extension of the outage period. We regret that this extension resulted in the depletion of the Umtamvuna water system. 'Eskom has scheduled a planned outage for 29 August in order to rectify the situation and install the meter required for the Eastern Cape supply. In the interim, Ugu has reverted to the original KwaZulu-Natal grid to ensure continuity of water supply.' What this seems to mean is that even if the water supply is restored this week, Lower South Coast residents can anticipate another major water shutdown at the end of the month before the situation improves. DM

New sailing season gets warm and wet welcome
New sailing season gets warm and wet welcome

The Citizen

timea day ago

  • The Citizen

New sailing season gets warm and wet welcome

New sailing season gets warm and wet welcome The start of the new sailing season was heralded at Zululand Yacht Club (ZYC) on Sunday, with the First Richards Bay Sea Scouts hoisting the flags before a short Blessing of the Waters ceremony. After this, incoming commodore Wikus van der Merwe received salutes from the flotilla of boats before being bombarded with water balloons, with the party continuing on land after the sail past. Don't have the ZO app? Download it to your Android or Apple device here: HAVE YOUR SAY Like our Facebook page and follow us on Twitter. For news straight to your phone invite us: WhatsApp – 060 784 2695 Instagram – zululand_observer

Gauteng's load reduction schedule for this week
Gauteng's load reduction schedule for this week

The Citizen

timea day ago

  • The Citizen

Gauteng's load reduction schedule for this week

Eskom's load reduction schedule has power cuts in both the morning and evening for various areas across the province. Multiple Eskom-serviced areas across Gauteng will face a wave of scheduled load reduction power cuts this week. The scheduled outages will run from Monday to Sunday, with power cuts varying from four to five hours for most areas. Areas affected under Eskom's load reduction schedule Eskom's load reduction schedule has power cuts in both the morning and evening for various areas across the province. The morning load reduction runs from 5am to 9am. Areas affected during this slot include Dobsonville, Orlando East, Vereeniging, Sharpeville, Sebokeng and Kagiso. The evening outage runs from 5pm to 10pm. Areas affected during this slot include Kagiso, parts of Vosloorus, Garankuwa, Protea South, Naledi and surrounding areas. To see if your area is affected, click on the link below: Load-reduction-schedule-GAUTENG-AUG-2025 The schedule works on a seven-day rotation with various areas alternating between slots. This structure provides residents with some predictability regarding when they might experience power outages. NOW READ: Electricity demand 'met 97% of the time' this winter, Eskom says

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store