
From new rooms to smart classrooms: JNU's management, engineering await big upgrades
For the first time since their launch in 2018, Jawaharlal Nehru University's engineering and management schools will soon have their own academic buildings and hostels, reported TOI.
As part of a ₹483.66 crore infrastructure overhaul under the Higher Education Funding Agency (HEFA) scheme, the university will construct a modern academic block and two purpose-built hostels for the School of Engineering and the Atal Bihari Vajpayee School of Management and Entrepreneurship.
Modern academic hub for technology and business
According to the report, the upcoming ₹142-crore academic centre will span 29,000 square metres and include advanced lecture halls, simulation labs, interdisciplinary collaboration zones, faculty offices, and subject-specific laboratories. The design aims to support both cutting-edge research and applied learning in technology and business studies.
These facilities are meant to match the academic demands of programmes that, unlike most JNU courses, charge significantly higher tuition fees. General category students pay ₹12 lakh for the full MBA, while OBC (non-creamy layer) students pay ₹8 lakh and SC/ST/PWD students pay ₹6 lakh—raising long-standing concerns about the mismatch between cost and infrastructure. New hostels with upgraded amenities Students will also get brand new hostels—JNU's first ever built specifically for a single academic programme. Together, they'll accommodate 2,600 students, helping end years of dependency on shared, cross-disciplinary housing. The School of Engineering hostel will cover 34,500 square metres and house 1,950 students at a cost of ₹126.69 crore. It will include furnished rooms, reading lounges, green spaces, and a dining hall, noted the news oulet. The management school hostel, sized at 11,500 square metres and costing ₹42.23 crore, will provide space for 650 students in modular rooms with shared workspaces suited for postgraduate life.
Part of a larger push to modernise JNU These upgrades are part of a broader development vision. Under the HEFA scheme, JNU has received clearance for nine major infrastructure projects. TOI further reported these include a trans-disciplinary research and academic block (₹41.24 crore), an advanced animal research centre (₹22.92 crore), a cutting-edge instrumentation facility (₹27.05 crore), a start-up incubation hub (₹17.69 crore), and a 2,000-seat lecture hall complex (₹52.85 crore).
'These projects mark a major milestone for JNU,' said vice-chancellor Santishree Dhulipudi Pandit. 'They reflect our commitment to creating a globally competitive, research-oriented university. As we align with the National Education Policy 2020, we're building a future-ready campus for both students and faculty.'
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
Haridwar municipal corporation halts vendor payments over Deepotsav irregularities
Haridwar: The municipal corporation of Haridwar has suspended payments to vendors involved in last year's Deepotsav celebration held on Nov 11, to mark Uttarakhand Day, after financial discrepancies came to light. The event, which cost Rs 70 lakh had already seen half the payment released before issues surfaced regarding a land deal related to the celebrations, leading to the suspension of the district magistrate and other officials. The corporation had issued a short-term tender for procuring 2.5 lakh diyas (earthen lamps) with cotton threads, 20,000 litres of sesame oil, 3,000 candles, and matchboxes for the celebration. Reports indicate that the supplier charged Rs 20 lakh for diyas and threads, and Rs 50 lakh for the oil. The total bill submitted amounted to Rs 70.36 lakh. Following objections raised by social activists, the corporation has withheld the remaining payment of Rs 35 lakh, pending a special audit. Municipal commissioner Nandan Kumar told TOI, "We have filed for special audit as per govt order. Further action will be taken accordingly based on findings." by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like [Click Here] 2025 Top Trending local enterprise accounting software Esseps Learn More Undo Social activist JP Badoni said, "The people of Uttarakhand sacrificed a lot for the formation of the state and now irregularities are now being committed in the name of Uttarakhand day celebration. The items were supplied at highly inflated prices and strict action must be taken in the matter."


Time of India
2 hours ago
- Time of India
Farmers asked to insure their crops by July 31
Kalaburagi: Farmers in Kalaburagi district have until July 31 to register for the Karnataka Pradhan Mantri Bhima Fasal Yojana, a crop insurance programme for monsoon season crops in 2025. Tired of too many ads? go ad free now The joint director of agriculture reported that over the past three years, 5,61,082 farmers received compensation totalling Rs 954.61 crore through crop insurance. Speaking to TOI, joint director of agriculture Samad Patel advised farmers to register at their nearest Gram-One, CSC centre, bank, or post office for crops cultivated under the Karnataka Farmer Suraksha Pradhan Mantri Fasal Bima Yojana during the 2025 monsoon season. The per-acre levy structure for different crops includes: Green gram (rainfed) Rs 269.1, Urad (rainfed) Rs 265, Tur (rainfed) Rs 388.5, Tur (irrigated) Rs 406.7, Cotton (rainfed) Rs 865.7, Cotton (irrigated) Rs 1492.3, and Suyaavare (rainfed) Rs 331.8. The registration deadline is July 31, 2025. With monsoon sowing underway in the district, crops face risks from various weather conditions, including excessive rainfall, drought, and unseasonable rains. Farmers are encouraged to register their sown crops under the Karnataka Farmer Insurance Pradhan Mantri Crop Insurance Scheme (Pradhan Mantri Fasal Bhima Scheme) alongside their sowing activities. Statistics from the past three years show that in Kalaburagi district, 5,61,082 farmers enrolled in crop insurance, with 59.3 crore farmers paying their premiums and Rs 954.6 crore disbursed as compensation to farmers' accounts. Tired of too many ads? go ad free now Joint director of agriculture Samad Patel, Kalaburagi, emphasises the importance of crop insurance, particularly since 90% of the district's agricultural land relies on rainfall. The scheme offers substantial protection against weather-related crop damage, as evidenced by data from recent years.


Time of India
2 hours ago
- Time of India
Mizoram govt takes up key projects, ‘PM's Ekta Mall' being constructed
Aizawl: Mizoram has taken up several key projects both under the flagship programmes of the central govt and the state govt, including Prime Minister's Ekta Mall or 'Unity Mall', director of state tourism department R Lalrodingi said on Monday. Tired of too many ads? go ad free now Lalrodingi told TOI a unity mall is being constructed on land belonging to the state printing and stationery department at Chawnpui locality in the western part of Aizawl with a funding of Rs 127 crore from the central govt's flagship programme 'PM-Ekta Mall'. She said other projects, including Keilungliah — a man-made lake in Champhai district — and a heritage and cultural centre also in Champhai district bordering Myanmar, have also been taken up by the state tourism department at the cost of around Rs 80 crore with funds from the Centre. "We also have received Rs 5.2 crore for preparation of basic amenities for tourists who visit Vangchhia village, one of the main tourist destinations in the state," she said, adding that a large number of tourists, both domestic and from abroad, visit the excavation site of the Archaeological Survey of India called 'Kawtchhuah Ropui', or the great gateway, at the historic Vangchhia village in Champhai district. She also said a plan is afoot to implement tourism initiatives in all the 40 assembly constituencies with legislators adopting one village each to promote tourism.