
Local political capture impedes SA's post-1994 planning and development
South Africa's planning and development trajectory has been positioned as a tool for transformation, equity and redress since the country's democratic transition in 1994. However, the promise of developmental governance and spatial justice has not been substantially realised after 30 years of democracy.
This failure is not accidental but symptomatic of a structural problem — planning and development cannot thrive in the hands of local-level politicians who are often driven by patronage, electoral interests and administrative incapacity rather than long-term strategic vision or inclusive development imperatives.
Before 1994, South African planning was rooted in apartheid ideology. Spatial planning served as a tool of segregation, with policies like the 1950 Group Areas Act and 1913 Land Act dispossessing black South Africans and relegating them to the peripheries of urban and economic life.
Planning institutions operated with a top-down (rather than bottom-up), technocratic logic, serving the goals of white minority rule. Development was narrowly defined, often conflated with infrastructure delivery for white areas and the broader African, Indian and coloured populations were systematically excluded from both the process and the benefits.
Despite sporadic attempts at 'homeland' development and urban townships upgrades in the 1980s, planning under apartheid entrenched inequality. By 1994, South Africa had one of the world's most spatially fragmented and racially skewed urban and rural systems.
Post-apartheid South Africa inherited this divided spatial logic. In response, the government developed progressive legislative frameworks to guide transformation, including the Reconstruction and Development Programme in 1994 aimed at meeting basic needs and rebuilding infrastructure (later replaced by the Growth, Employment and Redistribution plan). The Development Facilitation Act of 1995 emphasised integrated development. The Municipal Structures Act (1998) and Municipal Systems Act (2000) established Integrated Development Plans (IDPs) as the primary tool for local-level planning. The National Development Plan 2030 outlines long-term inclusive growth and spatial equity objectives.
While these frameworks were progressive, their implementation has been marred by political interference, weak capacity and administrative paralysis at the local government level. Instead, the promise of 'developmental local government' has often produced dysfunctional municipalities.
According to the 2023 State of Local Government Report by the Department of Cooperative Governance and Traditional Affairs, only 5% of municipalities are classified as well-functioning, while more than 60% are underperforming or dysfunctional. Auditor general Tsakani Maluleke's 2022-23 municipal audit revealed that only 38 out of 257 municipalities received clean audits and unauthorised, irregular, fruitless and wasteful expenditure reached R20.4 billion.
Theoretical models underpinned post-apartheid planning, such as communicative planning, emphasising stakeholder participation and collaborative governance. These ideals assumed rational dialogue and shared visions for development. However, in practice, the technocratic rationality of planners has often clashed with the political rationality of local councillors, who view planning instruments like IDPs as tools to secure votes and allocate tenders.
Marxist geographers such as David Harvey and Edward Soja remind us that space is always political. This forms clientelism in South Africa, where political allegiance, rather than necessity, is a mediator for development access. Thus, rather than serving as a forum for equitable growth, planning becomes a site of power struggles.
Furthermore, municipalities imitate planning frameworks (for instance, by drafting IDPs) without internalising or implementing them, as explained by institutional isomorphism derived from new institutional theory. This leads to form without substance — documents are produced but transformation remains elusive.
Local politicians, often lacking in technical understanding of spatial planning, play a vital role in shaping development priorities. Rather than being facilitators of professional planning, many become gatekeepers. Municipal councils routinely override technical assessments to prioritise politically expedient projects. Tender processes are manipulated to reward loyalists and community participation processes are reduced to box-ticking exercises.
In addition, the planning apparatus has been weakened by cadre deployment. When qualified professionals are sidelined or enlisted in political conflicts, evidence-based planning is undermined. This trend is more pronounced in small and rural municipalities, where planning departments are under-resourced or non-existent. As a result, municipal spatial development frameworks, meant to guide land use and infrastructure investment, are either outdated or ignored.
Despite massive investment, South Africa remains spatially unequal. According to Statistics South Africa figures from 2022, more than a third of South Africans live in informal settlements or backyard dwellings. Access to basic services like water and sanitation has stagnated, with some rural municipalities regressing coverage. Economic opportunities remain concentrated in urban cores, with rural youth facing unemployment rates above 60%.
This reflects a more profound crisis — planning is not merely a technical function but a state capacity issue. When the state at the local level is captured by party politics, service delivery and equitable development become casualties.
Suppose South Africa was to realise the spatial justice envisioned in its Constitution and policies. A shift must occur in that case;
Depoliticise planning functions by ensuring professional planners are insulated from political interference. This could mean ringfencing planning directorates within municipalities under provincial oversight.
Re-professionalise local government by investing in skills development, enforcing minimum competency frameworks and creating independent planning tribunals.
Strengthen accountability mechanisms, including public audits, citizen review panels for IDPs and real-time transparency in tender awards.
Restructure spatial governance by rethinking the role of metros, district municipalities and traditional authorities in planning, especially in rural contexts.
The failure of post-1994 planning and development in South Africa is not a consequence of the absence of vision or policy; it is a by-product of the political hijacking of development processes at the local level. Until we insulate planning from political expediency, transformation, equity and sustainability objectives will remain lip service. Planning is too important to be left in the hands of politicians.
Siyanda Kate is a PhD candidate (political studies) at Nelson Mandela University and a lecturer at Walter Sisulu University.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Mail & Guardian
42 minutes ago
- Mail & Guardian
How South Africa's Lesotho water project costs ballooned by R45bn
Watershed: The Lesotho Highlands Development Authority building in Maseru. Photo: Sechaba Mokhethi The cost of the second phase of the In 2008, phase two was projected to cost R8 billion. By 2022, this had ballooned to R42 billion. It now stands at R53 billion, raising questions about governance, oversight and accountability. 'Despite Minister [Pemmy Majodina]'s public acknowledgement that a probe into the escalating costs of phase two of the [Lesotho Highlands Water Project] would be conducted, no further details have been shared with parliament or the public,' Democratic Alliance deputy spokesperson on water and sanitation Stephen Moore said last week. Moore has filed a Promotion of Access to Information Act application to the department of water and sanitation. This follows two unanswered letters, the first sent on 8 May. The department's spokesperson Wisane Mavasa said the May letter had not been sent directly to the minister or director general. 'Unfortunately, the letter was not acted upon by the officials that it was sent to,' she said, adding that the minister would respond 'shortly'. The department says the escalation is the result of various factors, including years of delays, treaty complications and market fluctuations. Oversight gaps South Africa's portfolio committee on water and sanitation raised concerns about the cost of the project with the auditor general at a sitting on 6 May. Delays have pushed completion from 2019 to 2028, affecting the delivery schedule and future phases of the project. The committee also noted constraints stemming from the 1986 treaty preventing the auditor general from auditing the LHDA directly, 'leaving South Africa reliant on Lesotho's audit structures'. But, says Mavasa, the Lesotho Highlands Water Commission (LHWC) has equal representation from both governments, had 'full access to the cost records of the LHDA' and had received detailed information about the delays. The committee also criticised the royalty arrangement, which it said obliges South Africa to continue payments to Lesotho even when water deliveries are interrupted. Other concerns included limited local procurement, dominance of foreign contractors and opaque financial flows. Some MPs went as far as calling for an immediate funding suspension, citing mismanagement and treaty flaws. However, the auditor general cautioned against such a drastic move, warning of legal consequences. It recommended treaty reforms, including joint audits, instead. Mavasa says South Africa and Lesotho have agreed to review the treaty, but the 'matters for review' have yet to be decided. Lesotho's Finance Minister Retselisitsoe Matlanyane From R8 billion to R53 billion Mavasa outlined the project's financial journey in detail. The original 2008 feasibility study produced a preliminary R8 billion estimate — excluding inflation, currency shifts, contingency allowances and modern environmental and social safeguards. Construction of the main works was expected to start in 2013 and deliver water to Gauteng by 2019. However, she said, the main contracts were only awarded in 2022 because negotiations with Lesotho took longer than expected. The situation had worsened with years of administrative and procedural delays. 'The phase two agreement was signed in August 2011. It then took 14 months for the [South African] parliament to ratify the phase two agreement and a further seven months for the Lesotho parliament to ratify the agreement after the ratification by the SA parliament,' Mavasa said. After Lesotho's 2013 change of government, the agreement was subjected to fresh scrutiny, adding further delays, according to Mavasa, who also pointed out that, between 2013 and 2022, the department of water and sanitation had five different ministers and 11 directors general, which slowed decision-making. There were also financing complications. Funders raised concerns over procurement processes for the main contracts and requested they be tendered afresh. The Covid pandemic also disrupted preparatory work. In October 2022, the LHDA projected a R42 billion completion cost — incorporating contract prices; social and environmental programmes; foreign exchange effects and administrative costs. More than R20 billion in extra costs was due to inflation linked to the delays, Mavasa said. In October, the figure rose to R53 billion. The department attributed this to: • R4.2 billion from boosting the contingency provision in line with international good practice from R3.3 billion in 2022 to R7.5 billion last year • R5.4 billion for additional social obligations requested by Lesotho, such as rural water supply and road infrastructure • R1.7 billion in price escalations, design changes and contractor claims linked to delays, including work-permit issues. Governance fixes and audits According to Mavasa, the project costs and time overruns have been a major concern for the department of water and sanitation and Minister Majodina. She said the Lesotho Highlands Development Authority has developed a plan to minimise any further delays and cost overruns. The LHWC would appoint a multidisciplinary team of experts to conduct management audits of contracts. Although the project is about half completed, she said two primary contracts are behind schedule. 'However, the LHDA is executing a turnaround plan to avoid further delays and recover lost time.' Last year, Mavasa said the department had established a governance committee comprising the department, the Trans-Caledon Tunnel Authority and the South African delegation to the LHWC, which meets monthly to review progress. The director general of the department of water and sanitation and the principal secretary of the relevant department in Lesotho held ad hoc and quarterly meetings to address issues arising from the project. Unresolved issues were escalated to the ministers. Lesotho's Minister of Natural Resources Mohlomi Moleko said he could only respond next week as he was outside the country.

The Herald
9 hours ago
- The Herald
Walter Sisulu University VC's contract won't be renewed, says council
The council of the Walter Sisulu University has decided not to renew the employment contract of its vice-chancellor, Prof Rushiella Nolundi Songca, which will end on March 31 2026. 'In this regard, the council will commence the recruitment process to appoint a suitable candidate to the position of vice-chancellor before the end of 2025 academic year,' said council chair Tembeka Ngcukaitobi SC in a letter to the university community on Wednesday. Ngcukaitobi said he was in discussion with Songca regarding transitional arrangements and any potential role she may assume within the university after the conclusion of her term. 'The council will later announce arrangements to mark its appreciation of the role Prof Songca has played and will continue to play in the life and evolution of the institution.' TimesLIVE

The Herald
9 hours ago
- The Herald
Inquest into 1993 Highgate Hotel massacre to resume next month
The National Prosecuting Authority (NPA) says it is satisfied with the progress made during the past three sessions of the formal inquest into the 1993 Highgate Hotel massacre. This is one of the cases referred to the NPA by the Truth and Reconciliation Commission (TRC) for further investigation and potential prosecution. The inquest ran from January 27 to February 7, continued from March 24 to March 28 and reconvened from Monday to Wednesday this week. The final session is scheduled for September 1 to September 5. The NPA said that to date, more than 20 witnesses have testified before judge Denzil Potgieter at the Special Tribunal in East London. 'They include the investigating officer from the Hawks, survivors, families of the deceased, ballistic experts, former police officers, commanders from the Azanian People's Liberation Army and private investigators appointed by affected families,' said NPA spokesperson Luxolo Tyali. The court has also conducted an inspection in loco at the scene of the incident. The inquest stems from a decision by the Eastern Cape director of public prosecutions Barry Madolo to establish whether anyone can be held criminally liable for the attack. On the night of the massacre, during the tense period leading up to the 1994 democratic elections, armed assailants opened fire at the Highgate Hotel's bars in East London. Stanley Hacking, Douglas William Gates, Royce Michael Wheeler, Deon Wayne Harris and Deric John Whitfield were killed. Seven other people were seriously wounded, suffering permanent injuries and disabilities. 'Three survivors and two family members of victims testified during the TRC hearings. No amnesty applications were made by suspected perpetrators,' Tyali said. While the attack was initially attributed to the armed wing of the Pan Africanist Congress (PAC), subsequent investigations could not confirm this. 'The NPA also notes with concern allegations made by some witnesses against certain of its officials. These will be addressed during the inquest to ensure that both the individuals concerned and the organisation are cleared of any unfounded claims.' Tyali said the NPA hoped this inquisitorial process will help provide much-needed closure to the victims' families, survivors and the broader public. Depending on developments in response to the presiding judge's directions issued on Wednesday — calling for anyone with information about the circumstances leading to the deaths to avail such information to the court — four more witnesses are expected to testify when proceedings resume in September. TimesLIVE