logo
Cabinet approves mural art work on ISBT walls at Badrinath

Cabinet approves mural art work on ISBT walls at Badrinath

Time of India3 hours ago

Dehradun: The Uttarakhand cabinet on Wednesday approved mural artwork on the walls of the ISBT at Badrinath dham as part of the ongoing master plan for the area's overall development.
Director general of information Bansidhar Tiwari said, "Large-scale work is being carried out at Badrinath dham. As part of the master plan, the state cabinet has also approved mural artwork on the boundary walls of the dham."
Earlier, the state govt had announced a Rs 424 crore plan aimed at upgrading infrastructure and facilities in the pilgrimage town. At its June 4 meeting, the cabinet approved four new projects for Badrinath.
These include permission for Sudarshan Chakra and Sheshnetra Lotus-themed murals at key locations such as the Arrival Plaza and Lakefront. Additionally, the cabinet gave the green light for the construction and installation of a Tree and River Sculpture at Badrinarayan Chowk.
The cabinet also approved the merger of the Animal Husbandry Department's scheme, which offers up to 90% subsidy for Scheduled Caste and Scheduled Tribe beneficiaries, with the Ganga Gai Yojana for dairy development.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Giao dịch xu hướng AUD/USD?
IC Markets
Đăng ký
Undo
With this merger, the scheme's benefits will now extend to people from the general category as well.
The cabinet also approved the creation of one non-cadre post of deputy registrar (Audit) in the cooperative department. This level-11 position has been sanctioned for a five-year period.
Dehradun: The Uttarakhand cabinet on Wednesday approved mural artwork on the walls of the ISBT at Badrinath dham as part of the ongoing master plan for the area's overall development.
Director general of information Bansidhar Tiwari said, "Large-scale work is being carried out at Badrinath dham. As part of the master plan, the state cabinet has also approved mural artwork on the boundary walls of the dham."
Earlier, the state govt had announced a Rs 424 crore plan aimed at upgrading infrastructure and facilities in the pilgrimage town. At its June 4 meeting, the cabinet approved four new projects for Badrinath.
These include permission for Sudarshan Chakra and Sheshnetra Lotus-themed murals at key locations such as the Arrival Plaza and Lakefront. Additionally, the cabinet gave the green light for the construction and installation of a Tree and River Sculpture at Badrinarayan Chowk.
The cabinet also approved the merger of the Animal Husbandry Department's scheme, which offers up to 90% subsidy for Scheduled Caste and Scheduled Tribe beneficiaries, with the Ganga Gai Yojana for dairy development. With this merger, the scheme's benefits will now extend to people from the general category as well.
The cabinet also approved the creation of one non-cadre post of deputy registrar (Audit) in the cooperative department. This level-11 position has been sanctioned for a five-year period.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Ola rolls out zero-commission model for drivers
Ola rolls out zero-commission model for drivers

Time of India

time23 minutes ago

  • Time of India

Ola rolls out zero-commission model for drivers

Bengaluru: Ride-hailing platform Ola implemented a zero-commission model across India, allowing over 1 million of its driver-partners to retain 100% of their fare earnings, with no limits on ride volumes or income. Under the new model, drivers will no longer be charged a percentage commission on each ride. Instead, they can opt for a fixed-fee subscription plan, such as a Rs 67 per day pass, offering them unlimited earnings without per-trip deductions. The company promoted the initiative through its new campaign, encouraging drivers to buy a 30-day pass for flat daily access. This marks a shift in how ride-hailing platforms structure earnings, moving from commission-based payouts to SaaS-like access fees. Ola claims it is the first and only ride-hailing platform in India to implement such a model nationwide. The company did not disclose details of any fixed subscription fee or charges drivers may pay to access the platform under the new structure. The announcement comes amid growing calls from driver groups across the country for more transparent and equitable earnings. Most aggregator platforms currently operate on commission-based models, typically charging drivers 20-30% of the fare per ride.

KMC hires 286 portable pumps to flush out storm water from added areas
KMC hires 286 portable pumps to flush out storm water from added areas

Time of India

time23 minutes ago

  • Time of India

KMC hires 286 portable pumps to flush out storm water from added areas

Kolkata: The KMC sewerage and drainage department has hired 286 portable pumps and kept them ready to save residents of added areas such as Behala, Garden Reach, the Tollygunge-Jadavpur belt, Garia and neighbourhoods off EM Bypass from waterlogging during the monsoon. Tired of too many ads? go ad free now The department already has 100 such pumps in its possession. According to a civic official, though the sewerage and drainage department was ready to combat waterlogging in some of the waterlogging-prone pockets in the city proper, including Thanthania, Amherst Street, Sukeas Street, Bowbazar, MG Road, CR Avenue, Camac Street and Bhowanipore, the officials were not sure about the fate of the residents in added areas. This is particularly concerning in parts of Behala, Tollygunge and areas off EM Bypass, where there is no underground drainage system and a drainage development project was yet to be completed. "The drainage upgrade project under KEIIP is dragging too much, and there is no hope that we can give the residents relief this monsoon," said a KMC drainage department official. "In such a situation, we have asked our officials in the boroughs to keep portable pumps ready and press them into service in case of a downpour," said a KMC drainage department official. The first major drainage upgrade project for the city's drainage system was taken up by KMC under the Kolkata Environment Improvement Project (KEIP) in 2003. The majority of funds (Rs 1600 crore) from the Asian Development Bank-funded mega project were allocated to develop the drainage system in Behala. However, when the project ended after being delayed for years, the civic engineers found faults with the laying of pipes. Tired of too many ads? go ad free now Additionally, several low-lying areas bordering Joka and Maheshtala municipalities were left untouched. This necessitated a second phase of the KEIP drainage upgrade project for Behala. Under the second phase, drainage development work is in progress in areas including Silpara, Sakuntala Park, Sakherbazar, Upen Banerjee Road and parts of James Long Sarani. This work has added to the waterlogging woes, conceded a KMC drainage department official.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store