
Built for 22 cr, Morabadi stage to be razed over design flaws
Ranchi: The
Morabadi Ground stage
, built in 2019 as part of a Rs 22 crore urban development project by the
Jharkhand Urban Infrastructure Development
Company (
JUIDCO
), is set to be dismantled following critical
design flaws
flagged during a recent inspection on Feb 27 by the district administration.
Although the entire development aimed to modernise the space for public and ceremonial events, the stage, which was the only completed component, proved inadequate for large gatherings and state functions.
The decision has triggered a political controversy, with the opposition accusing the govt of destroying state assets created during BJP tenures. Though the JUIDCO project was envisioned as a multi-use plaza for large-scale public functions, only the stage was completed.
The structure, measuring 75 ft by 40 ft and featuring a tensile canopy, 11 LED screens, and Gobo lights, has proven inadequate for key events like R-Day and Independence Day.
The inspection found that the canopy and its pillars obstruct visibility and the 9 ft elevation fails to ensure clear line of sight for attendees.
Further, the static design prevents expansion, often forcing the administration to install temporary stages up to 72 ft ahead of the current platform, compromising space and event layout.
"Based on inspection findings, it was decided that the current stage and canopy would be dismantled. Temporary, functional structures suited to individual events will replace it. Large public programmes typically require stage lengths of 80 to 180 ft, which this setup does not support," said Ranchi DC Manjunath Bhajantri.
BJP's state spokesperson Pratul Shahdeo lashed out at the Hemant Soren-led govt, saying, "Why demolish a multi-purpose stage that served Republic Day, Independence Day, and several historic rallies, including two of Hemant Soren's own oath-taking ceremonies? Was this decision driven by any public demand or simply an attempt to erase BJP-era contributions?" He accused the govt of wasteful spending, especially when departments claim a lack of funds for essential schemes.
Shahdeo added, "This stage was also a platform for local artists. Now the govt, instead of preserving such infrastructure, is arbitrarily tearing it down." According to the officials, future makeshift stage structures will prioritise visibility, modularity, and audience capacity to meet modern event demands.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
17 minutes ago
- Time of India
Chhattisgarh CM briefs PM Modi on water projects worth Rs 49K cr in Bastar
RAIPUR: Chhattisgarh Chief Minister Vishnu Deo Sai held a detailed meeting with Prime Minister Narendra Modi in New Delhi regarding the implementation of the multipurpose Bodhghat Dam Project and the Indravati-Mahanadi Interlinking Project. CM Sai proposed that both initiatives be taken up as national projects, highlighting their strategic importance for the holistic development of the Bastar region. Chief Minister Sai said that Bastar, having been severely affected by Naxalite violence for decades, has lagged behind in irrigation infrastructure. To bridge this gap and boost regional development, the state government is prioritizing these two key projects. During the meeting, CM Sai emphasized the strategic importance of these projects for Bastar, which has long suffered from Naxalite violence and underdevelopment. He informed the Prime Minister that of the total 8.15 lakh hectares of cultivable land in Bastar, irrigation facilities currently cover only 1.36 lakh hectares, highlighting the urgent need for expansion. According to CM Sai, the Bodhghat Multipurpose Dam Project, proposed on the Indravati River — a major tributary of the Godavari — will be transformative for Bastar. Although the project was mentioned as far back as the 1980 award by the Godavari Water Disputes Tribunal, it had remained unimplemented due to its remote location and security challenges. While other states have executed similar projects mentioned in the same award, Bodhghat remained unrealized — until now. Doubling the Pace of Development in Bastar Officials told TOI that Bodhghat project is expected to significantly expand irrigation facilities and catalyze Bastar's overall development. It will facilitate irrigation across 3.78 lakh hectares in the Kharif and Rabi seasons, generate 125 MW of hydroelectric power, ensure 49 million cubic meters of drinking water, and support an annual fish production of 4,824 metric tonnes — thereby creating multiple livelihood opportunities. The Indravati-Mahanadi Interlinking Project will enable irrigation across more than 3 lakh hectares of land, including 50,000 hectares in Kanker district alone. Combined, both projects are expected to bring irrigation to approximately 7 lakh hectares of farmland across the Bastar division — a game-changer for agriculture, water security, and employment in the region. The Bodhghat Dam is proposed on the Indravati River, which flows for 264 km within Chhattisgarh. The dam site is located about 8 km from Barsur village in Geedam block of Dantewada district and around 100 km from Jagdalpur city. Officials told TOI, the total estimated cost for both projects is Rs 49,000 crore — Rs 29,000 crore for Bodhghat Dam and Rs 20,000 crore for Indravati-Mahanadi link. The plan includes civil irrigation works and hydroelectric power infrastructure. The dam will have a usable water storage capacity of 2009 million cubic meters and a total capacity of 2727 million cubic meters, with a full reservoir area of 10,440 hectares. Bodhghat Dam Project will directly benefit 269 villages in Dantewada, Bijapur, and Sukma districts. Meanwhile, the Indravati-Mahanadi project will expand irrigation facilities to several villages in Kanker district. Together, these projects aim to build a stronger, self-reliant, and prosperous Bastar. Prime Minister Modi gave the proposals a serious hearing and assured consideration.


India.com
17 minutes ago
- India.com
Pak Generals Want Conflict To Remain Relevant: Ravi Shankar In Germany
BJP MP and leader of the all-party delegation Ravi Shankar Prasad on Saturday launched a scathing attack on Pakistan's military establishment for supporting terrorism, saying that its Generals want conflicts to remain relevant and use terrorists as a tool to destabilise India. Addressing a community event with the Indian diaspora in Berlin, Prasad pointed out that while both India and Pakistan were born on the same day, the former has made remarkable progress in IT and space, in contrast to Islamabad. "India and Pakistan were born the same day. Where are we in India, and where are they (Pakistan)? India has become a major global IT power in the world. India has become an emerging space power in the world. The startup movements here are now globally recognised. India has also become the second biggest mobile phone manufacturer in the world. We have brought digital transformation with equity and justice," ANI quoted Prasad as saying. Prasad claimed that Pakistan only knows how to prepare world-class terrorists under its military leadership. He said that wherever there is a terrorist, he is either a Pakistani or trained in Pakistan. "What Pakistan is doing is creating terror machines. How to create world-class terrorists under their (military) Generals. They attacked us four times and lost every time. We never attacked; they were the ones who always started the war. It is because they are under the control of Generals and not political leaders. Generals want conflict to keep themselves relevant, and terrorists are the instruments through which they execute. Wherever there is a terrorist, either he is a Pakistani or trained in Pakistan," he added. Prasad also spoke about the April 22 Pahalgam terror attack and India's decisive response through Operation Sindoor on May 7, noting that Operation Sindoor remains paused but ready to resume based on Pakistan's actions. "Pahalgam attack happened on April 22. We attacked on May 7 and hit the terrorist camps. If Pakistan has to talk, it must directly speak to us. Our message was stern and straight: If you stop, we stop. If you fire, we will give a stronger reply. Operation Sindoor is on pause, subject to the good behaviour of Pakistan. It has not ended," he stated. An all-party delegation, led by Ravi Shankar Prasad, is currently visiting Germany as part of the Indian government's initiative to engage with key partner nations, including members of the United Nations Security Council (UNSC) to convey India's resolute and united stand against terrorism. This initiative follows the tragic April 22 terror attack in Pahalgam, Jammu and Kashmir, where 26 innocent civilians lost their lives to gunfire from terrorists. The Delegation includes BJP MPs Daggubati Purandeswari and Samik Bhattacharya, Congress MP Amar Singh and Gulam Ali Khatana, Shiv Sena (UBT) MP Priyanka Chaturvedi, AIADMK MP M Thambidurai, former Union Minister MJ Akbar and former diplomat Pankaj Saran. The delegation arrived in Germany after concluding their visit to Belgium to convey India's resolute and united stand against terrorism.


Time of India
18 minutes ago
- Time of India
Raghubar slams govt for non-implementation of PESA Act
Dumka: Former chief minister Raghubar Das on Saturday criticised the state govt for being indifferent towards the implementation of the Panchayats (Extension to the Scheduled Areas) (PESA) Act, 1996, in the state. Das said, "The tribal society has been deprived of the benefits of the Union govt funds due to the non-implementation of the PESA Act though the community comprises the major support base of JMM, which is the ruling party in the state govt coalition. Jharkhand lost the Rs 1,400crore allotted by the central finance commission in the 2024-25 financial year as the state govt failed to introduce the PESA Act during its subsequent terms. The situation persisted even after JMM promised the electorate to implement the PESA Act in its election manifesto." "The implementation of the PESA Act would ensure 'Abua Raj' in real term as it would provide the traditional self-rule system of the tribal society a legal status in the 13 districts, comprising 112 blocks, which fall under the scheduled areas. The empowerment of the traditional self-rule bodies through the PESA Act will, in turn, go a long way in preventing the ongoing conversion of the tribals, otherwise being supported by the ruling alliance at the cost of the existence of the community and its culture," he alleged, accusing JMM of betraying the tribal society. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like This Device Made My Power Bill Drop Overnight elecTrick - Save upto 80% on Power Bill Pre-Order Undo The former Odisha governor further said, "The backward and Dalit community members were at the receiving end as central funds to the tune of hundreds of crores of rupees could not be released to the urban and rural civic bodies for development works. Finance minister Radha Krishna Kishore, through a letter to the CM, mentioned that the condition of Dalits was worse than that of the PVTG communities." While local JMM office bearers didn't respond, spokesperson for the state Congress, part of the ruling coalition, Shyamal Kishore Singh, refuted the allegations. "The state govt was committed to implement the PESA act. State Congress in-charge K Raju presided over a meeting with the party's district presidents on Saturday on the implementation of the PESA act. The district presidents have been directed to submit the reports to the party after due consultations with common people of the respective areas falling under the fifth schedule. " The state rural development department had held a state-level consultation with different stakeholders for seeking suggestions on the issue in Ranchi a few days ago.