logo
In just six months, Dubai's transport system carried more people than the entire US population

In just six months, Dubai's transport system carried more people than the entire US population

Time of India28-07-2025
TL;DR
Dubai saw 395.3 million public transport rides in H1 2025, up 9% from 2024.
Metro (36.5%) and taxis (26%) made up most of the ridership.
The new Blue Line will serve 1M residents across 14 stations.
Dubai aims for a fully electric/hydrogen bus fleet by 2050.
It's remarkable to consider that Dubai, a city with a population of roughly 11.3 million, recorded an astonishing 395 million public transport rides in just the first half of 2025.
Tired of too many ads? go ad free now
To put this into perspective, this figure surpasses the entire population of the United States, around 347 million, by a significant margin. In fact, the number of rides is about 35 times greater than the total population of the UAE itself. This striking statistic offers a glimpse into Dubai's rapidly evolving public transport landscape, revealing a system that has become integral to daily life for residents and visitors alike.
Dubai's Public Transport: A Growing Backbone of Mobility
On July 27, 2025, Dubai's Roads and Transport Authority (RTA) announced the impressive figures for public transport ridership during the first six months of the year. The numbers span across multiple transport modes including the Dubai Metro, Dubai Tram, public buses, marine transport, as well as taxis and shared mobility options such as app-based vehicles, hourly rentals, and on-demand buses.
The total ridership reached approximately 395.3 million, marking a 9% increase over the roughly 361.2 million rides recorded during the same period in 2024.
Average daily ridership climbed to nearly 2.18 million, up from about 1.98 million daily rides the previous year.
Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of RTA, emphasized the importance of this growth. He said, 'The continued growth in public transport ridership reflects users' confidence in the system's efficiency and the quality of services provided across all modes.
Tired of too many ads? go ad free now
We remain committed to delivering safe, comfortable, and sustainable mobility solutions for every segment of society.
'
Al Tayer highlighted that Dubai's public transport network has undergone a major transformation. 'Driven by advanced infrastructure and a diverse range of transit options,' he explained, 'the network now forms the backbone of mobility for residents and visitors across the emirate.' Notably, the share of journeys using public transport and shared mobility options has increased from just 6% in 2006 to 21.6% in 2024, a clear indication of shifting public attitudes toward sustainable and convenient mass transit.
Expanding Infrastructure and Environmental Commitments
Looking ahead, Dubai is actively expanding its transit system. The ongoing construction of the Dubai Metro Blue Line is a major project, set to add 30 kilometers and 14 new stations. The line will serve nine key districts housing an estimated combined population of one million residents, aligning with the broader Dubai 2040 Urban Plan.
Al Tayer revealed that the RTA is pursuing a strategic vision to make public transport the preferred choice for daily commuting.
'We are moving forward with a clear vision to make public transport the preferred choice by smartly expanding transport lines and networks, strengthening connectivity between stations and key destinations, and offering flexible, inclusive mobility solutions.'
In line with environmental goals, the RTA recently signed four agreements to procure 637 multi-sized buses compliant with the European low-emission standard 'Euro 6.'
This includes 40 electric buses, making it the largest and first fleet of its kind in the UAE. These buses, expected to be delivered in 2025 and 2026, will support geographic expansion and help achieve the long-term target of converting the entire public bus fleet to electric and hydrogen-powered vehicles by 2050.
This month, the RTA also completed the development of 16 bus passenger stations and six depots to enhance service quality.
Ridership Breakdown: Metro, Taxis, and More
During the first half of 2025, the Dubai Metro and taxis accounted for the largest shares of ridership, contributing 36.5% and 26% of total trips respectively. Public buses remained vital, making up 24% of overall ridership. May was the busiest month, with ridership peaking at 68.8 million trips, while the other months ranged between 61 million and 68 million rides.
Reflecting on these figures, Mattar Al Tayer said:
'There was a 9% increase in ridership during the first half of this year compared to the same period in 2024, a key indicator of the recovery in economic activity across the emirate of Dubai, as well as the effectiveness of the RTA's strategies and initiatives to encourage both residents and visitors to use public transport and to offer diverse mobility options throughout the city.'
Breaking down the metro ridership further, the Dubai Metro recorded approximately 143.9 million riders across its Red and Green Lines. The stations with the highest traffic were:
BurJuman Station (serving both lines) with 8.6 million riders
Al Rigga Station with 6.8 million riders
with 6.8 million riders Union Station with 6.6 million riders
On the Red Line, the busiest stations after Al Rigga were:
Mall of the Emirates Station with 5.6 million riders
Burj Khalifa/Dubai Mall Station with 5.4 million riders
Business Bay Station with 5.3 million riders
On the Green Line, the most popular stations included:
Sharaf DG Station with 5.1 million riders
Baniyas Station with 4.1 million riders
Stadium Station with approximately 3.6 million riders
Additional modes of transport contributed significantly as well. The Dubai Tram carried 4.9 million riders, while public buses served 95.7 million passengers.
Marine transport modes collectively transported 9.7 million users, shared mobility services—including app-based vehicles and on-demand buses, accounted for 37.6 million rides, and taxis carried 103.5 million riders during this period.
The Dubai Metro Blue Line: A Landmark Development
The Dubai Metro Blue Line is poised to become a vital addition to the city's transport network. Stretching 30 kilometers with 14 stations, it will improve connectivity between key areas such as Mirdif, Dubai Silicon Oasis, Dubai Creek Harbour, and Dubai Festival City.
The line is designed to handle a maximum capacity of over 850,000 passengers per day, with projections estimating 200,000 daily passengers by 2030 and 320,000 by 2040. A notable highlight is the Emaar Properties station, which will be the tallest metro station in the world at 74 meters high, symbolizing Dubai's ambition to combine cutting-edge infrastructure with architectural excellence.
Dubai's public transport success story is a testament to visionary planning, significant investment, and a steadfast commitment to sustainability and inclusivity. From a modest 6% public transport share in 2006 to becoming a city where nearly 2.2 million rides are taken daily in 2025, Dubai is redefining urban mobility on a scale that rivals entire nations.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

L&T exit aside, Bengaluru's suburban rail dream faces another big hurdle—shinier big-ticket projects
L&T exit aside, Bengaluru's suburban rail dream faces another big hurdle—shinier big-ticket projects

The Print

time3 hours ago

  • The Print

L&T exit aside, Bengaluru's suburban rail dream faces another big hurdle—shinier big-ticket projects

L&T approached the court, claiming that only 2.1 km of the workfront, or 8.28 percent of the total length under the project it was contracted to execute, was made available to it. It added that the representations by K-RIDE, government body responsible for executing the project, were 'false, made with sole intention of inducing and deceiving' the company. The Mumbai-based infrastructure major exited the project last week, citing delays in being handed over land for the big-ticket project. L&T terminated its contract to build one of the stretches, and demanded Rs 505 crore. Bengaluru: The acrimonious exit of Larsen & Toubro from Bengaluru's suburban rail project has threatened to delay one of the city's most ambitious mass mobility programmes, yet again. The move has now sparked a blame game between the company and K-RIDE. According to a person aware of the developments, L&T's claim that it did not get the land is not completely accurate. 'There are multiple factors, including if un-encroached land was handed to L&T by the railways, and why the pace of private land acquisition has been so slow,' the person told ThePrint, requesting anonymity. K-RIDE, or Rail Infrastructure Development Company (Karnataka), is a joint venture of the state government and Ministry of Railways, and is tasked with creating and developing 148.17 km of rail route under the Rs 15,767 crore suburban rail project, aimed at decongesting Bengaluru in the long run. The lack of sustainable public transportation has forced Bengaluru's nearly 14 million residents to rely more on private transport, congesting the city further. On last count, Bengaluru had a total of over 1.23 crore vehicles plying its roads, with 7.22 lakh new vehicles added in 2024-25. Coupled with inadequate and crumbling infrastructure, the city has become synonymous with congestion, as well as a template for 'urban ruin'. But the execution challenges aren't the only factor impeding the progress of the rail project. Policy makers in Bengaluru have kept their energies and resources more focused on big-ticket projects, like the metro and the proposed tunnel road, while others like suburban rail, and even bus fleets, remain stagnant. Prime Minister Narendra Modi will be in the city to inaugurate the Yellow line of the Metro on 10 August. But the Bengaluru Suburban Railway Project (BSRP) that he announced with much pomp in June 2022—with a deadline of just 40 months—has failed to take off. Also Read: High-level policy change causes ripples in Railways, pushback from business houses & within 'Metro given precedence' As soon as the rail project was announced, several legislators and parliamentarians had rushed to claim credit. Things moved swiftly, at least in terms of its marketing. The project was named 'Samparka', a combination of the first letters of the names of its four stretches, each named after a flower—Sampige (41.4 km), Mallige (25.01 km), Parijaata (35.52 km) and Kanaka (46.24 km). However, the focus has since pivoted to the metro project. According to a person directly involved in BSRP, the railways-based transportation project is being overlooked for the metro. 'It's like the younger brother is being born before the older brother,' the person remarked, saying how the metro has taken precedence over a cheaper, more sustainable option. The person also emphasised how other cities, like Mumbai, have focused on the more sustainable option of suburban railways. Rajkumar Dugar, founder of Citizens For Citizens (C4C), told ThePrint, 'The maximum interest being shown by the state government today in any infrastructure project, trying to literally bulldoze its way, is the tunnel road. The second interest is for the metro. Nobody shows interest in suburban rail. The clue is that on paper, the tunnel road costs Rs 1,100 crore per km, the metro about Rs 500 crore on average, and the suburban rail is Rs 100 crore per km.' The BSRP was sanctioned back in October 2020, with a deadline of three years for the completion of the route from Majestic (Bengaluru's main bus & train terminal) to the international airport, and further to Devanahalli. At the time, Bengaluru Metro Rail Corporation had written to the Karnataka government, asking that K-RIDE focus on other stretches as the metro line must be prioritised. The Department of Urban Land Transport (DULT), in its response to the state government, had said that BSRP should get priority. 'There is a sanction letter from the Union government and DULT. Both say that BSRP corridor-1 should be prioritised. BMRCL had its way, but not a single brick has been laid on that corridor yet after five years. Things are happening completely against the interests of the city,' Dugar said. Even though all Bengaluru-related projects come under the district in-charge minister, the BSRP has not attracted the attention of its peer projects, like Metro or the tunnel road. The main reason is that the BSRP is being overseen by the infrastructure development ministry of Karnataka, and not under the city in-charge minister, The deputy chief minister has been pushing for vanity projects, like the tunnel road, sky deck, and other big-ticket projects, while BSRP is under M.B. Patil, the industries and infrastructure minister. Blame game The South Western Railways (SWR) told ThePrint that all four corridors of the suburban rail project require 326.81 acres of land. An SWR spokesperson said that on many stretches of land that have been handed over, the encroachments have been identified, and almost all of them cleared. The spokesperson dismissed allegations that the authority handed over land with encroachments to L&T. The authority told ThePrint that for Corridor-2, K-RIDE demanded 85.707 acre-land, which was handed over in December 2022. 'Out of 25.01 km, 22.482 km (almost 90 percent) of the land is completely free of encroachments. In balance 2.58 km length, 344 encroachments are identified, of which 78 are removed, and others are also in the process of removal. BSRP work is in progress in this stretch,' the SWR spokesperson said. In another stretch, K-RIDE demanded 115.472 acres, which was handed over in April 2024. 'In 46.24 km stretch, only 20 encroachments are identified. Eviction proceedings are already in an advanced stage,' the spokesperson added. The land requirement has not yet been finalised for the other two stretches, SWR further said. L&T had entered into two agreements with K-RIDE, which were scheduled to be completed in 27 months, according to the agency responsible for implementing the suburban rail network. These included extensions and other agreements. L&T was contracted to execute about 84 percent of the total corridor length, but K-RIDE said in a statement Saturday that their work was not commensurate so far, which it said 'exposes L&T's failures' in carrying out the work. 'The progress of work as compared to work front availability was not satisfactory due to L&T's failure in mobilisation of adequate resources, and delay in finalisation of designs,' K-RIDE's statement read. It added that multiple letters and reminders had been issued highlighting the company's 'failures' on various fronts, with the direction to remedy them to complete the work at the earliest. The agency also said that the termination of the contract was 'illegal'. ThePrint attempted to reach L&T via email for a comment, but no response was received. (Edited by Mannat Chugh) Also Read: Trash piles up across Chennai areas as sanitation workers protest privatisation move

Hyderabad hot on its heels, Yellow Line gives Bengaluru's Namma Metro breathing room
Hyderabad hot on its heels, Yellow Line gives Bengaluru's Namma Metro breathing room

Time of India

time3 hours ago

  • Time of India

Hyderabad hot on its heels, Yellow Line gives Bengaluru's Namma Metro breathing room

1 2 3 Bengaluru: Bengaluru's Namma Metro is set to cement its position as the second-largest metro network in India, following the imminent commissioning of its much-anticipated Yellow Line. The new 19-km corridor, connecting RV Road to Bommasandra, is expected to expand the city's Metro footprint to 96km of operational track — offering a buffer as Hyderabad rapidly scales up its Metro ambitions. The Purple and Green Lines, currently the mainstay of the Bengaluru Metro system, collectively span nearly 77km and serve 69 stations. The East-West Purple Line stretches across 43.5km with 38 stations, while the North-South Green Line covers 33.5km with 31 stations. Together, these lines have been moving an average of 8 lakh passengers daily, a number that is expected to surge significantly once the Yellow Line begins full-scale operations. You Can Also Check: Bengaluru AQI | Weather in Bengaluru | Bank Holidays in Bengaluru | Public Holidays in Bengaluru With this expansion, BMRCL not only boosts intra-city connectivity — particularly linking major industrial hubs in the city's south — but also shores up its standing in India's urban mobility leaderboard. Hyderabad catching up While Delhi Metro remains far ahead with a staggering 395-km network (including NCR), it's the battle for second place that has grown more intense. Hyderabad Metro , which currently spans around 69km, has been gaining ground quickly thanks to its efficient operations and growing ridership base. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Jennifer Garner's sweet photo on sprawling family farm gets fans talking Watch More Undo As of 2024, Hyderabad clocked in a reported daily ridership of 5.3 lakh and is set to add more corridors under its Phase II expansion. That momentum has placed pressure on BMRCL to keep up the pace — and the Yellow Line might just arrive in time to retain Bengaluru's second-place status, at least for now. More than just numbers The Yellow Line's opening is about more than retaining a rank. It connects tech parks, manufacturing clusters, and dense residential areas in Bengaluru's southern corridor, potentially shifting thousands of commuters off congested roads and onto rail. Transport planners are optimistic that this line will not only absorb a chunk of the city's infamous traffic but also trigger a ripple effect, even as criticism about low frequency owing to just three trains being available rents the air. What's next? Even as the Yellow Line opens, eyes are already on the Pink Line (Gottigere–Nagawara) and Blue Line (Central Silk Board–KR Puram-KIA) corridors, both under construction. Their completion in the next few years could push Bengaluru well past the 170-km mark — assuming projects stay on track. With Hyderabad's ambitions on full throttle, Namma Metro will need to keep building — and fast. EXPANDING HORIZON Metro Total network Delhi (with NCR) 395km Bengaluru (with Yellow line) 96km Hyderabad 69km Ahmedabad 58-59km Kolkata 59km Chennai 54km Source: Metro corporation

Vyttila Mobility Hub redevelopment causes severe inconvenience to commuters
Vyttila Mobility Hub redevelopment causes severe inconvenience to commuters

Time of India

time6 hours ago

  • Time of India

Vyttila Mobility Hub redevelopment causes severe inconvenience to commuters

Kochi: The redevelopment work at Vyttila Mobility Hub, which has been ongoing since June, is making daily commuting a nightmare for hundreds who travel by bus, autorickshaw, Metro and Water Metro. Tired of too many ads? go ad free now Broken carriageways, leaking roofs and a dearth of basic amenities make the situation dire, be it rain or shine. It has been months since the interlock tiles were removed, leaving the surface uneven with quarry waste used as a temporary fill. The area becomes waterlogged when it rains and turns dusty when it shines. The hub, which serves both KSRTC and private buses, is also a critical transit point for passengers heading to Metro and Water Metro stations. However, they are forced to navigate through dust, mud, filth and cracked surfaces. Leaking roofs and unhygienic toilets make travel an ordeal for all. Cochin Smart Mission Ltd is in charge of the Rs 5-crore renovation work which includes changing tiles, renovating toilets and improving seats. However, an alleged delay in payment to the contractor by Vyttila Mobility Hub Society (VMHS) is often disrupting the work. "I can't believe that a major bus terminal in Kochi is functioning in such a pathetic state," said Hariharan from Thrissur, who reached the hub by a KSRTC bus on Wednesday afternoon. "Even during the construction, authorities could have arranged temporary facilities such as toilets. Roads are in terrible shape. It is extremely difficult for passengers to walk from the bus stand to the Metro station or even up to the autorickshaw stand," he said. Tired of too many ads? go ad free now A shopkeeper, who doesn't want to be named, said: "People are made to inhale dust. Standing here for half an hour can cause coughing and breathing problems," he said. "In addition to dust and gutters, lack of water supply is also causing major inconvenience to the public," said T N Prathapan of Vyttila Action Council. He said that despite filing complaints with the corporation regarding the unhygienic conditions of the toilets — which could lead to health issues — no significant action has been taken. Though officials did carry out an inspection, no follow-up measure was taken, he said. "There's also a serious safety concern due to faulty electrical wiring near pillars 11 and 12," he said. Another issue is the waste being dumped on the hub premises. Sunita Dixon, corporation councillor from the area, said that while the civic body attempted to control the dust by sprinkling water on the carriageway on sunny days, it proved futile. "If the hub society fails to complete the work soon, I'll be forced to launch a protest," she said. Dixon also alleged that the delay in payment to the contractor may further lag the works, for months. VMHS MD K Gopalakrishnan said the work was expected to get over in a month. He promised that the contractor was asked to minimise inconvenience to the public. "It is natural for people to face some difficulties during large-scale development projects in such a busy area. Complaining about it seems unreasonable. We believe the public will understand, as these works aim to provide improved facilities," he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store