logo
Delhi: Dwarka Expressway-Vasant Kunj tunnel approved; full details of mega project

Delhi: Dwarka Expressway-Vasant Kunj tunnel approved; full details of mega project

Hindustan Times3 days ago

Delhi chief minister Rekha Gupta said on Sunday that multiple projects worth ₹24,000 crores have been approved by the centre to reduce pollution and streamline traffic in Delhi and its adjoining areas. This will include a five-km tunnel between Shiv Murti-Mahipalpur (Dwarka Expressway) and Nelson Mandela Road (Vasant Kunj).
The projects, which were approved during a recent meeting with Union Minister of Road Transport and Highways, Nitin Gadkari, will commence from early next year. The tunnel between Dwarka Expressway and Vasant Kunj will be constructed by the National Highways Authority of India (NHAI) at an estimated cost of ₹3,500 crore.
The project will include the construction of two underground tubes, with each tube having three lanes, which will offer a signal-free alternate route between South Delhi and Dwarka/Gurugram.
Moreover, the tunnel will be equipped with facilities like ventilation, fire safety, CCTV, electro-mechanical systems, surveillance, control rooms, cross passages and emergency exits for efficient travelling. She explained that the tunnel will help in easing traffic congestion on Rangpuri, Dhaula Kuan, Rao Tula Ram Marg, and National Highway 48 (NH-48).
The tunnel will also become significant in connecting multiple major expressways including the Delhi Expressway (NE-5), NH-44, NH-10, Delhi-Jaipur Highway (NH-48), and Delhi-Dehradun Expressway (NH-709B) via the Urban Extension Road (UER) and Dwarka Expressway, she added.
CM Rekha Gupta called this project, the "foundation for the Delhi of the future," and said the tunnel will give a new direction to infrastructure in the national capital and bring relief to millions of citizens.
Last week, CM Rekha Gupta said that the central government has given various road projects worth Rs.1.25 lakh crore to Delhi over the last years due to which key connectivity stretches are in the works, including an underground tunnel from Shiv Murti to Nelson Mandela Road and an elevated corridor from Sarai Kale Khan to IGI Airport.
With inputs from PTI

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Sacheerome IPO Allotment In Focus Today: A Step-By-Step Guide To Check Status Online, Know GMP
Sacheerome IPO Allotment In Focus Today: A Step-By-Step Guide To Check Status Online, Know GMP

News18

time34 minutes ago

  • News18

Sacheerome IPO Allotment In Focus Today: A Step-By-Step Guide To Check Status Online, Know GMP

Last Updated: The allotment of the Sacheerome IPO, which received a whopping 312.94 times subscription, will be finalised today, June 12. The latest GMP indicates 47.06% listing gains. Sacheerome IPO Allotment Today: The Sacheerome IPO allotment is set to be finalised today, June 12, in the evening. After the basis of allotment is finalised, investors will start receiving bank debit messages. They can also check the allotment status online on the websites of BSE and NSE, as well as on registrar Link Intime's portal. Here's the latest GMP, as well as a step-by-step guide to check allotment status. The Sacheerome IPO was open for public subscription between June 9 and June 11. On the final day of bidding on Wednesday, the Rs 61.62-crore NSE SME IPO received a whopping 312.94 times subscription, garnering bids for 1,25,76,46,800 shares as against 40,18,800 shares on offer. The retail and NII participation stood at 180.28 times and 808.56 times, respectively. The qualified institutional buyers (QIB) category has received a 173.15 times subscription so far. Sacheerome IPO: A Step-By-Step Guide To Check Allotment Status The Sacheerome IPO allotment will take place on Thursday, June 12. The IPO allotment status can be checked online by following these steps: 1) Go to the official BSE website via the URL — 2) Under 'Issue Type', select 'Equity'. 3) Under 'Issue Name', select 'Sacheerome Ltd' in the dropbox. 4) Enter your application number, or the Permanent Account Number (PAN). 5) Then, click on the 'I am not a robot' to verify yourself and hit the 'Search' option. You can also visit directly on the registrar Link Intime's portal — and check the Sacheerome IPO allotment status. The allotment status can also be checked on the NSE's website at Sacheerome IPO GMP Today & Listing Date According to market observers, unlisted shares of Sacheerome Ltd are currently trading at Rs 150 apiece in the grey market, which is a 47.06% premium or GMP over the IPO price of Rs 102. It indicates decent listing gains for investors on June 16, the tentative listing date. The GMP is based on market sentiments and keeps changing. 'Grey market premium' indicates investors' readiness to pay more than the issue price. Listing Date: Shares of Sacheerome Ltd are scheduled to be listed on the NSE's SME platform on June 16. Sacheerome IPO: More Details The Sacheerome IPO, which is a bookbuilding of Rs 61.62 crore, is entirely a fresh issue of 60.41 lakh shares. The price of the IPO was fixed at Rs 102 per share. The minimum lot size for an application was 1,200. The minimum amount of investment required by retail investors was Rs 1,22,400. The bidding could be done in multiple of 1,200. The public offer was opened for subscription on June 9, 2025, and closed on June 11, 2025. The allotment for the Sacheerome IPO is expected to be finalised on Thursday, June 12, 2025. It will be list on the NSE SME with a tentative listing date fixed as Monday, June 16, 2025. About Sacheerome Ltd Sacheerome Limited, founded in June 1992, designs and manufactures fragrances and flavours for B2B FMCG clients in India and globally. Its fragrances cater to sectors like personal care, home care, and wellness, while its flavours serve beverages, bakery, dairy, nutrition, oral care, and more. Location : New Delhi, India, India First Published: June 12, 2025, 06:35 IST News business » ipo Sacheerome IPO Allotment In Focus Today: A Step-By-Step Guide To Check Status Online, Know GMP

"Politically motivated": BRS slams PC Ghosh Commission for delaying submission of Kaleshwaram project report
"Politically motivated": BRS slams PC Ghosh Commission for delaying submission of Kaleshwaram project report

India Gazette

time38 minutes ago

  • India Gazette

"Politically motivated": BRS slams PC Ghosh Commission for delaying submission of Kaleshwaram project report

Hyderabad (Telangana) [India], June 12 (ANI) Amid chaos over former Telangana Chief Minister K Chandrasekhar Rao's appearance at PC Ghosh Commission in connection with the alleged irregularities in Kaleshwaram project, Bharat Rashtra Samith (BRS) leader KP Vivekanand Goud labelled the Commission as being 'politically motivated' and expressed reservations over the delay in submission of the report on the project. He informed that the PC Ghosh Commission was expected to submit the report on the Kaleshwaram project within 100 days, but it has been extending the deadline. 'Today, in connection with the PC Ghosh Commission inquiry, our leader, KCR, was called. The PC Ghosh Commission was supposed to submit the report on the Kaleshwaram project within 100 days. But it has only been extending the deadline, which clearly shows that this is a politically motivated commission. Out of 239 pillars, only two pairs required repairs. Just to defame KCR, they are dragging out the Commission,' Goud told ANI here. This came as KCR appeared before PC Ghosh Commission in connection with alleged irregularities in the Kaleshwaram project. Heavy police deployment was witnessed at Hyderabad's BRK Bhavan on Wednesday ahead of KCR's appearance. Previously, BRS MLA and former Irrigation minister Harish Rao and BJP MP Etela Rajender, who previously served as Finance Minister in the BRS government, appeared before the commission. Justice PC Ghose Commission on Tuesday issued summons to former Telangana CM K Chandrashekar Rao (KCR), former Minister Harish Rao, and BJP MP Etela Rajender, who also served as a minister during the BRS regime, in the ongoing investigation into alleged irregularities in the Kaleshwaram Lift Irrigation Project (KLIP). The Commission, which has been probing financial and procedural lapses in the multi-crore irrigation project, directed the three political leaders to appear for questioning in the first week of June. On June 8, Bharatiya Janata Party (BJP) Member of Parliament Konda Vishweshwar Reddy described the Kaleshwaram Lift Irrigation Project in Telangana as the 'world's biggest engineering blunder' and termed it a 'huge scam' that has severely impacted the state's economy. Speaking to ANI, Reddy said, 'Kaleshwaram Lift Irrigation Project in Telangana is the world's biggest engineering blunder and it's a huge scam which ruined Telangana economically. It is one of the prime reasons that the richest state of Telangana is in such a horrible economic condition. We have a loan of Rs 8 lakh crore.' 'The present Congress government does not have money to pay salaries and run the government,' he added, blaming the ruling party for the deepening financial crisis. Telangana Irrigation and Civil Supplies Minister N Uttam Kumar Reddy also held that the previous BRS government was responsible for the project's failure, labelling it the 'biggest man-made disaster' since Independence and the 'most expensive engineering failure' caused by any state government in India. He said that Telangana is currently paying Rs 16,000 crore annually in interest and instalments on high-cost loans borrowed during the BRS regime for this 'faulty' project, thereby placing an enormous burden on the state's finances and its farmers. (ANI)

In Bhopal, a bridge with 90-degree turn draws criticism, minister says will look into it
In Bhopal, a bridge with 90-degree turn draws criticism, minister says will look into it

Indian Express

time40 minutes ago

  • Indian Express

In Bhopal, a bridge with 90-degree turn draws criticism, minister says will look into it

A railway overbridge near Aishbagh Stadium in Bhopal, Madhya Pradesh, has run into controversy just as it nears completion – not for delays or cost overruns, but for what some critics say is a fundamental design flaw that could make it unsafe for motorists. Concerns have been raised around the bridge's sharp, almost 90-degree turn, which vehicles must negotiate soon after ascending. With the Congress taking to social media to take a jab at the design, the state PWD Minister Rakesh Singh promised to look into the issue. 'Whenever a bridge is made, a lot of technical considerations are taken into account. So if there are such allegations, we will look into it,' he said, while dismissing the Congress party's concerns as baseless and politically motivated. Constructed at Rs 18 crore, the 648-metre-long, 8.5-metre-wide overbridge is intended to link the congested areas of Mahamai Ka Bagh, Pushpa Nagar, and the railway station zone with New Bhopal. Conceived as a relief project, it promised to eliminate long wait times at railway crossings and spare residents a circuitous detour that many have endured for over a decade. Government estimates suggested that the bridge would benefit around three lakh commuters daily. The bridge, whose construction began in March 2023, has also faced delays. Initially set for completion in 18 months, it is only now approaching readiness after more than 36 months, delayed by factors such as the shifting of electrical lines and coordination issues between the Public Works Department and the Railways. Public Works Department (Bridge Department) Chief Engineer V D Verma told PTI, 'Due to the Metro station, there is limited availability of land at the point. Due to the lack of land, there was no other option. The purpose of the RoB is to connect the two colonies.' Only light vehicles will run on this overbridge, he said, adding that heavy vehicles will not be allowed. — With PTI inputs

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store