
75 Delhi govt schools to get PM Shri tag, smart upgrades
The Delhi government will relaunch 75 of its schools as CM-Shri schools with state-of-the-art infrastructure and experiential learning models, chief minister Rekha Gupta said on Friday. The initiative aims to transform the quality of education in government schools by blending modern technology with improved facilities.
The CM, addressing a meeting with school principals and education department officials in Shalimar Bagh, said the revamped schools will feature thousands of smart classrooms, 100 language labs, and 125 digital libraries by the end of the year.
The city government currently runs 1,060 schools, and the 75 CM-Shri campuses will be chosen from among these, based on their readiness for infrastructure and technological upgrades.
'Every child in Delhi deserves quality education. Our aim isn't merely to build schools, but to create an education system that plays a vital role in nation-building. These 75 CM-Shri Schools are a step towards delivering learning that surpasses even private institutions,' Gupta said.
The criteria for selecting the 75 schools are still being finalised, but will likely hinge on the existing infrastructure, an official said.
The CM also directed that basic amenities like clean toilets, drinking water, proper lighting, and comfortable seating be upgraded across its 1,060 schools on a need basis. She instructed the PWD's horticulture wing to green campuses with landscaping initiatives.
Each CM-Shri school will also be equipped with smart boards, science and computer labs, and other digital tools. Emphasising the importance of teacher quality, Gupta announced regular training programmes and exposure to modern teaching methods.
The CM further directed officials to provide targeted support for meritorious, underperforming, and differently abled students, ensuring inclusive education. She also announced laptops for 1,200 students who excelled in Class 10 and 12 board exams, and said the government is actively seeking CSR partnerships to bolster the initiative.
Meanwhile, the Directorate of Education (DoE) has opened applications for transfers to CM-Shri schools for the 2025-26 session. Post Graduate Teachers (PGTs), Trained Graduate Teachers (TGTs), Primary Teachers (PRTs), and other staff with at least five years remaining before retirement can apply by June 9 via email. Interviews will be held on June 11 (TGTs) and June 12 (PGTs and others).
An official said the National Education Policy (NEP) will be implemented across CM-Shri schools, alongside the integration of AI tools and language labs.
Gupta, meanwhile, took aim at the former Aam Aadmi Party (AAP) government, calling its education model 'artificial.'
'Despite the heavy propaganda, the ground reality was dismal. Even their most celebrated school buildings were poorly built — one constructed in 2018 deteriorated within two years. This exposes their so-called model as nothing more than a facade,' she said, adding that legal action would be initiated for irregularities in classroom construction flagged in the CAG report.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
Delhi considers building elevated road over ring road to ease chronic congestion
N ew Delhi: With the city's Ring Road catering to heavier traffic than its capacity, Delhi govt is toying with the idea of building an elevated road over the existing 55-km stretch. PWD minister Parvesh Verma said he had already asked for a feasibility of such a project, with the proposed road to be built on pillars and connected with other arterial roads through ramps. Verma said he had discussed the plan with Union minister for road, transport and highways Nitin Gadkari and received a go-ahead from him. "This will be one of the biggest projects of this govt and will be completed within its term," Verma told TOI. The minister said that Delhi's two ring roads bear the maximum load of traffic and remain clogged during peak hours. Adding to the capacity of the existing road would help ease traffic on the existing one while also decongesting other roads that connect with Ring Road. "Since the new road will be entirely elevated, it can be built on pillars along the central verge of the existing road. The project will not require any acquisition of land and so can be completed within a given timeframe," Verma said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Thousands Are Saving Money Using This Wall Plug elecTrick - Save upto 80% on Power Bill Click Here Undo Since a large volume of traffic using the Ring Road disperses on other important arterial roads such as Mathura Road, Aurobindo Marg, DND Flyway or head to the airport, Gurgaon, Rohtak Road and other highways, Verma said traffic movement would become obstruction-free with the construction of the new elevated road. "The cost of the construction of an elevated road comes to about Rs 100 crore per kilometre. This project can easily be completed at a cost of Rs 5,500-6,000 crore," the PWD minister said. Once a relatively efficient arterial corridor designed to decongest central areas and facilitate cross-city travel, Ring Road is now facing chronic congestion. Unlike the newer Outer Ring Road, developed later to redirect peripheral traffic, the inner Ring Road is buckling under mounting pressures. From urban sprawl and flawed planning to infrastructure saturation and enforcement gaps, a confluence of factors has brought the once-speedy corridor to a glacial pace. When Ring Road was originally planned in the 1950s and completed in the following decades, it was meant to serve a very different city — both in population and traffic volume. At the time, Delhi had fewer than three million residents. Today, the metro region is home to over 30 million. The road, however, has not expanded proportionately to accommodate this growth. What was once designed as a bypass route now functions as a semi-central road. As the city grew outward, neighbourhoods like South Extension, Punjabi Bagh, Lajpat Nagar and Ashram became dense mid-city urban hubs. Ring Road now cuts through commercial, institutional and residential areas. The corridor is used not just by through traffic but also by local traffic to access shops, markets, schools and hospitals — all of which generate frequent stops and lane intrusions. Intersections like AIIMS, Moolchand, Dhaula Kuan, Ashram and ITO are choke points where arterial routes intersect with heavy local traffic. While flyovers and underpasses have been built at some locations, they often only shift the congestion rather than resolve it. Delhi Traffic Police conducted a survey in 2024 and found that of 134 congestion hotspots, at least 12 were located on Ring Road and Outer Ring Road.


India Gazette
3 hours ago
- India Gazette
Madhya Pradesh: Union Minister Dharmendra Pradhan offers prayers at Ujjain's Mahakaleshwar temple
Ujjain (Madhya Pradesh) [India], June 7 (ANI): Union Minister Dharmendra Pradhan offered prayers at Shri Mahakaleshwar Temple in Ujjain on Saturday. Earlier in the day, Pradhan, Governor of Karnataka, Thaawarchand Gehlot and Madhya Pradesh Chief Minister Mohan Yadav inaugurated a hostel and staff quarters at Prime Minister Shri Jawahar Navodaya Vidyalaya-2. The Union Minister Pradhan and CM Yadav also performed a ritual and inaugurated the hostel and staff quarters. In an X post, Union Minister Dharmendra Pradhan shared glimpses of the event and appreciated Navodaya Vidyalaya, Kendriya Vidyalaya and Sandipani Vidyalaya for working to create meritorious students under the National Education Policy 2020. He wrote, 'Today, along with Hon'ble Chief Minister Dr Mohan Yadav ji, Hon'ble Governor of Karnataka Thaawarchand Gehlot ji and other colleagues, inaugurated the new hostel and staff quarters of PM Shri School Navodaya Vidyalaya-2 in Alot, Ratlam and Sandipani Vidyalaya, Alot.' 'I am happy that the state governments, including Navodaya Vidyalaya, Kendriya Vidyalaya and Sandipani Vidyalaya, are working at a rapid pace on the vision of creating meritorious students in the National Education Policy - 2020,' he also mentioned that Navodaya Vidyalayas have performed excellently, and more than 1100 students from these schools have been selected for IITs all over the country. 'This time, the performance of Navodaya Vidyalayas has been excellent. More than 1100 students selected in IIT from all over the country are from Navodaya Vidyalayas. It is a matter of even more satisfaction for us that more than half of these students are from poor and deprived sections. I have full faith that in the coming years, the students of PM Shri Navodaya Vidyalaya-2, Alot will also make their place in prestigious institutions like IIT, NEET, NIT,' Dharmendra Pradhan wrote. Lauding Prime Minister Narendra Modi for NEP 2020, he wrote, 'School is a modern temple for us. Under the National Education Policy - 2020 implemented under the leadership of Prime Minister Shri Narendra Modi ji, work is being done to empower our new generation by connecting education through Indian languages, science, sports and other subjects. Prime Minister plans that in the next 2-3 years, all government and rural schools in the country will have broadband internet facilities, and AI-based education will also be made available. Our effort is to provide facilities equivalent to private schools and government schools as well.' (ANI)


The Hindu
4 hours ago
- The Hindu
Fixing Delhi's monsoon woes a work in progress with repeated delays in formulating a drainage master plan
Delhi, which is prone to waterlogging and flooding following spells of heavy rain, continues to miss deadlines for framing and executing a drainage master plan, according to official documents reviewed by The Hindu. Chief Secretary Dharmendra has flagged the delay in several meetings, and documents show that the drainage master plan is unlikely to be implemented ahead of the upcoming monsoon, which is less than a month away. According to the minutes of a meeting on March 17 with senior officials, including those from the Public Works Department (PWD), which was appointed the nodal agency in 2021 to develop the drainage plan, Mr. Dharmendra remarked that 'the pace of progress by the three PWD-appointed consultant agencies is not satisfactory. The Chief Secretary also expressed displeasure over the non-adherence to the timelines'. 50-year-old blueprint One of the main reasons for the waterlogging in the city is that it continues to operate on a drainage master plan created in 1976. The plan was designed for a population of 60 lakh and intended to handle only 50 mm of rainfall. However, Delhi's population has since increased fourfold. Moreover, there has been a surge in encroachments and concretisation over the past nearly 50 years, which has decreased the Capital's water absorption capacity and led to a spurt in the quantity of run-off water, causing floods and waterlogging. Push by the court In April 2024, the Delhi High Court criticised the Delhi government, then under the Aam Aadmi Party, for the delay in formulating a new drainage master plan, stating, 'The urgency for its implementation cannot be emphasised enough.' The court directed that detailed project reports (DPRs) for the master plan be finalised by September 15, 2024, administrative decisions taken by November 30, and implementation to begin on December 31. None of these deadlines were met. As of now, the DPRs by private consultants are expected to be finalised by the government on June 30, following which tenders will be floated. However, no deadline has been fixed for the execution, according to officials. A senior Delhi government official said that while the unclogging and desilting of drains have improved this year, compared to 2024, desilting alone will not solve the problem. Years of delay In 2011, the Delhi government signed a memorandum of understanding with the Indian Institute of Technology, Delhi to develop a drainage master plan. The team submitted its report in 2018, featuring a dynamic software model designed to incorporate data such as topography, soil type, and rainfall. However, in 2021, a technical committee rejected it, prompting the government to start the process afresh. Professor A.K. Gosain, who led the IIT-D team, said, 'The problem of waterlogging will happen at a particular point, but to solve it, the network of drains to that point has to be seen as a whole. That is why a drainage master plan is important, as it provides a comprehensive picture.'