logo
NCR land surveys to continue for valid claims, says Deputy Premier

NCR land surveys to continue for valid claims, says Deputy Premier

Borneo Post15-05-2025

Awang Tengah (seated, fourth left) and others in a photo call with the title recipients. Seated at second and third left are Iskandar and Chukpai, respectively.
BINTULU (May 15): Perimeter surveys of Native Customary Rights (NRC) land will continue for as long as needed but only for landowners who present valid legal evidence and consent to the process, said Datuk Amar Awang Tengah Ali Hasan.
The Deputy Premier said the Sarawak government is committed to the NCR survey initiative, but stressed that surveys will not proceed if ownership disputes remain unresolved or if the matter is still before the courts.
'If any dispute exists, especially if a case is still in court, the survey will not proceed unless the legal action is withdrawn and a new application is submitted.
'The government has always recognised NCR land, not just recently but since the 1960s. What we're doing now is building on that commitment with better processes,' he said during a land title handover ceremony here today.
He clarified that the survey process is conducted in two stages: perimeter survey and individual lot survey.
He added that since 2010, more than 1.2 million hectares—nearly three million acres—have been surveyed under this initiative.
'However, rapid development in rural areas has triggered a rise in disputes, overlapping claims, and tension among communities.
'That's why the government stepped in to expedite the surveying process, reduce conflict, and ensure everyone's rights are protected,' he said, urging claimants not to blame the government if surveys cannot proceed due to unresolved internal conflicts.
'If it's truly your land and you have proof, submit an application. The government will assess it fairly. But if it's not your land, don't make false claims.'
He also addressed concerns about Section 6 documents which were often misconstrued by the public.
'Some say (Sarawak Land Code) Section 6 documents do not prove ownership. If you don't believe in it, return the document. But to date, no one has,' he said.
Awang Tengah added that once a perimeter survey is completed and ownership verified, landowners can apply for land titles under Section 18, which offer perpetual ownership, exemption from premium charges, and no land tax.
'This is the government's promise to the people. As long as the moon and stars remain, the land remains yours,' he said.
Also present at the handover ceremony were Jepak assemblyman Iskandar Turkee and Murum assemblyman Kennedy Chukpai Ugon. Awang Tengah Land Survey ncr land

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Doppa demands ‘no risk' exemption from EU for indigenous Dayak palm oil farmers
Doppa demands ‘no risk' exemption from EU for indigenous Dayak palm oil farmers

Borneo Post

time30-05-2025

  • Borneo Post

Doppa demands ‘no risk' exemption from EU for indigenous Dayak palm oil farmers

Data from Sarawak shows 48,000 independent smallholders are actively involved in supplying the 85 mills that process their oil palm harvests. – Bernama photo KUCHING (May 30): The Dayak Oil Palm Planters Association (Doppa) is calling on the European Union (EU) to grant a 'no risk' exemption for indigenous farmers in Sarawak, following the EU's decision to classify Malaysia as Standard Risk under its deforestation regulations. The livelihoods of the indigenous people in Sarawak who depend on farming will be affected if the EU fails to take into account the negative impacts of the listing on the indigenous people in Sarawak, Doppa President Napolean R. Ningkos said in a press statement today. 'Doppa sees the EU as an unjust body that failed to engage directly with those most affected by the regulations and relied instead on misinformation created by third parties to exclude smallholders in Sarawak from the EU market,' he claimed. Data from Sarawak shows 48,000 independent smallholders are actively involved in supplying the 85 mills that process their oil palm harvests. 'Our concern is that while established big plantation companies may have the ability to provide proof of traceability for corporate oil palm plantations, the amount of paperwork required under Standard Risk may push corporate mills that supply the EU market to cut off independent smallholders,' he stressed. He also criticised the EU's reliance on satellite mapping to monitor compliance, arguing that such technology is flawed when applied to indigenous lands in Sarawak. 'There is zero risk of deforestation for palm oil by Dayak farmers in Sarawak. All of our farms, whether existing or to be planted after the compliance date on December 2025, will be on old farmlands.' 'Satellite mapping is faulty in that it may detect activity on overgrown fallow lands as new deforestation,' he said. 'The EU must be informed that the indigenous Dayaks of Sarawak were largely subsistence farmers who practised shifting cultivation before switching to oil palm cultivation in the 1990s. 'Our farms can only be cultivated after land titles are granted under the Sarawak Land Code, which recognises Native Customary Rights (NCR) as legitimate land ownership. The baseline for obtaining a land title is that our forefathers must have already developed the land,' he explained. He urged the EU to recognise that no forests were cleared for oil palm, cocoa, or rubber farms operated by indigenous Dayak smallholders. 'The oil palm fruits produced by Dayak farmers in Sarawak represent one of the clearest examples of a no-deforestation supply. Yet, the EU's regulations threaten to remove us from their market,' he said. Doppa insists that granting a 'no risk' exemption is the only fair way to ensure indigenous farmers are not punished by regulations they are unequipped to comply with.

Petronas invested RM25bil in Sarawak in 2024: Awang Tengah
Petronas invested RM25bil in Sarawak in 2024: Awang Tengah

New Straits Times

time28-05-2025

  • New Straits Times

Petronas invested RM25bil in Sarawak in 2024: Awang Tengah

KUCHING: Petroliam Nasional Bhd (Petronas) has invested RM25 billion in Sarawak last year, said Sarawak Deputy Premier Datuk Amar Awang Tengah Ali Hasan. Awang Tengah, who is also the Sarawak Minister for International Trade, Industry and Investment said these investments include nine first hydrocarbon discoveries and two major production milestones – the Kasawari field at Block SK316 and the Jerun field at Block SK408. "Ongoing offshore development and exploration projects are in progress to ensure future energy security. "Petronas is intensifying frontier exploration through data enrichment and strategic partnerships for seismic processing, reinforcing Sarawak's role in Malaysia's energy sector, supporting long-term energy security and economic growth," he said during his ministry's winding-up session at the State Legislative Assembly sitting here today. Meanwhile, Awang Tengah said Sarawak recognises natural gas as a vital transition fuel in the global journey towards net-zero emissions and the state is committed to its responsible development. He said the Sarawak Gas Roadmap leverages Sarawak's abundant natural gas resources, which constitute over 60 per cent of Malaysia's reserves, to drive industrialisation, improve energy security and attract sustainable investment. "As part of this initiative, a RM100 million city gas trunkline in Bintulu will expand clean and affordable energy access for homes and businesses. The project is going to be implemented soon. "Meanwhile, the RM1 billion Samalaju Pipeline will transport 300 million standard cubic feet (mmscf) per day of gas from Bintulu to Samalaju Industrial Park. The installation of this gas pipeline is expected to be completed by the end of 2025," he said.

Sarawak approves 82 resettlement projects
Sarawak approves 82 resettlement projects

The Sun

time28-05-2025

  • The Sun

Sarawak approves 82 resettlement projects

KUCHING: A total of 82 projects under the Resettlement Scheme (SPS) and Village Expansion Scheme (SPK) have been approved as of April 30 under the 12th Malaysia Plan (12MP) and the People's Project, said Sarawak Deputy Premier Datuk Amar Awang Tengah Ali Hasan. He said the overall project provides a total of 7,932 housing lots with an estimated cost of RM1.5 billion. 'Of the total, 25 projects are completed while the implementation of the remaining 57 projects will continue until the end of the 12MP and in the 13MP,' he said when winding up on behalf of the Ministry of Natural Resources and Urban Development at the State Assembly here today. Awang Tengah, who is also the Second Minister of Natural Resources and Urban Development, said that since 2018, infrastructure development for the scheme has been implemented with new specifications involving the construction of, among others, paved roads, concrete drains and water and electricity supply reticulation systems, involving an average cost of RM150,000 per lot. 'However, taking the people's welfare into consideration, the government has set the land premium payment at no more than RM2,500, which can be paid in annual instalments for up to 10 years,' he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store