
KV Dharwad Students Excel in ‘Mera Amrit Station' Competition
Students of PM SHRI Kendriya Vidyalaya, Dharwad, have excelled in the competitions held under the 'Mera Amrit Station' initiative of the Indian Railways.
While Roshani of Class III emerged as the star performer in the Drawing Competition, securing the 1st prize for her creative and imaginative artwork, Surabhi V.G. of Class IX secured 2nd position in the essay competition and 3rd position in elocution competition, a release from KV said.
The students received the prizes from Karnataka Governor Thaawarchand Gehlot during the inauguration ceremony of the Amrit Stations held in Dharwad recently. Chairman of Karnataka Legislative Council Basavaraj Horatti and others were present.
Deputy Commissioner of the KVS Regional Office Dharmendra Patle, Assistant Commissioners R. Pramod and Hema K., and principal Rakesh Kumar Goyal have congratulated the students for their excellent performance.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
4 hours ago
- Time of India
Horses and mules to the rescue: How Chenab Bridge was built in Kashmir
NEW DELHI: Long before towering cranes swung into action or steel arches touched the skies, it was the humble clip-clop of hooves that echoed through the Himalayas. To bring the dream of connecting Kashmir to Kanyakumari alive, the team building the Chenab Bridge, now the world's highest railway bridge, first had to navigate a far less glamorous challenge: getting there. In the early days, the steep, unforgiving terrain of the Himalayas offered no roads, no tracks—only winding, narrow paths. The solution? Horses and mules. 'Initially, mules and horses were used by the project team to reach the location,' said a spokesperson from Afcons Infrastructure Limited, the engineering firm that executed the mega project. 'Gradually, temporary access roads were built, finally leading to more permanent routes,' he told PTI. It took grit and persistence to tame the landscape. On the north bank of the Chenab, an 11-km road was carved out; on the south, 12 km more followed - routes that would eventually bring in machinery, steel, and hope. On Friday, as Prime Minister Narendra Modi walked across the bridge waving the tricolour, what unfolded was not just the inauguration of a piece of infrastructure, but the realisation of a nation's engineering audacity. Along with the Chenab Bridge, the PM also flagged off the Anji Rail Bridge, the Udhampur-Srinagar-Baramulla Rail Link (USBRL), and Vande Bharat trains—bringing Kashmir a rail heartbeat closer to the rest of India. Taming the Himalayas wasn't easy. Using the world's tallest crossbar cable cranes and heavy-duty machines, engineers performed consolidation grouting on ancient, brittle slopes, fortifying them to bear the massive arch foundations. The real magic unfolded on April 5, 2021. As cantilevered arches extended from either bank of the Chenab, they met in mid-air like clasped hands—a moment of triumph after years of calculations, courage and concrete. And the feats didn't stop there. For the first time in Indian Railways' history, incremental launching was executed on a transition curve and a longitudinal gradient at the same location,. It wasn't just engineering excellence but also scientific precision that held the bridge together. A lab accredited by the National Accreditation Board for Testing and Calibration Laboratories (NABL) was set up on-site, another Indian Railways first, to ensure uncompromising quality at every stage. Standing 359 metres above the Chenab River, 35 metres taller than Paris' Eiffel Tower, the bridge is now the world's tallest railway structure. A marvel in steel and spirit.


Indian Express
12 hours ago
- Indian Express
All you need to know about world's highest Chenab railway bridge inaugurated today
Prime Minister Narendra Modi on Friday inaugurated the world's highest railway bridge, constructed over the Chenab River in Jammu and Kashmir. He also flagged off two specially designed Vande Bharat trains between Srinagar and Katra, marking the completion of a 42-year-old project aimed at connecting the Kashmir Valley with the rest of the country by rail. This landmark achievement is expected to open up new avenues for growth, trade, and connectivity in the region, while also boosting employment and livelihood opportunities for local communities. Here's all you need to know about the newly inaugurated bridge: 1. The Chenab rail bridge runs over the Chenab River in Reasi district of Jammu and Kashmir. Located between Katra and Sangaldan on the Jammu-Baramulla line, the bridge was built at a cost of around Rs 1,400 crore. 2. It is the highest arch bridge in the world, with a deck height of 359 meters from the riverbed — making it 35 meters taller than Paris's iconic Eiffel Tower. 3. Connecting the Kashmir Valley with the rest of the country, the bridge forms a critical part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, which is being developed at a cost of Rs 35,000 crore. 4. The Chenab railway bridge is a steel-and-concrete marvel spanning 1,315 meters across the river gorge. It consists of a 530-meter-long approach bridge and a 785-meter-long deck arch bridge (the part of the bridge on which vehicles run) 5. The project was overseen by the Konkan Railway Corporation, a division of Indian Railways. The design and construction were carried out by a joint venture involving Afcons Infrastructure, South Korea-based Ultra Construction & Engineering Company, and VSL India. 6. The design for the bridge's foundation protection was prepared by the Indian Institute of Science, Bangalore. IIT Delhi conducted the slope stability analysis, while both IIT Delhi and IIT Roorkee handled the seismic analysis. The Defence Research and Development Organisation (DRDO) helped in making the bridge blast-proof. 7. Steel for the bridge was supplied by the Steel Authority of India, while Swiss company Mageba provided specialised spherical stopper bearings. The project involved the fabrication of 28,660 metric tonnes of steel and also included the construction of 26 kilometers of motorable roads. 8. Sophisticated Tekla software was used for the project, allowing detailed 3D modeling of the bridge and its structural components. 9. The bridge is designed for a lifespan of 120 years and can support train speeds of up to 100 km per hour. It is capable of withstanding earthquakes up to magnitude 8 on the Richter scale, as well as high-intensity explosions equivalent to 40 tonnes of TNT. 10. The steel structure is built to endure extreme weather conditions, including temperatures as low as -20 degrees Celsius and wind speeds of up to 266 km per hour. 11. Although the project was approved in 2008, construction was delayed for a time due to concerns over stability and safety in the challenging Himalayan terrain.


Time of India
16 hours ago
- Time of India
PM Modi Chenab Bridge Inauguration Live Updates: PM Modi to launch Vande Bharat trains connecting Katra to Srinagar today
Prime Minister Narendra Modi is visiting Jammu and Kashmir's Reasi district on Friday where he will inaugurate two Vande Bharat Express trains connecting Shri Mata Vaishno Devi, Katra to Srinagar. These trains will run on the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a Rs 43,780 crore project featuring 36 tunnels and 943 bridges. This marks Kashmir's first all-weather railway connectivity with the rest of India. Regular services will begin on June 7, 2025. PM Modi is also expected to inaugurate the Chenab Bridge, the world's highest railway bridge, and launch infrastructure projects worth Rs 46,000 crore. Security has been intensified across Udhampur and Reasi ahead of the visit. 10:06 (IST) Jun 06 PM Modi JK Visit Live: Built for the Himalayas—Vande Bharat trains customised for Kashmir The new Vande Bharat trains deployed on the Jammu–Srinagar route are specially designed for harsh Himalayan winters. Capable of operating at minus 20°C, the trains come with heated windscreens, insulated lavatories, and advanced onboard heating. This engineering ensures uninterrupted service and passenger comfort year-round. The move marks a significant leap in railway innovation and regional accessibility. 10:06 (IST) Jun 06 PM Modi JK Visit Live: Vande Bharat Express schedule announced for Kashmir route Indian Railways has announced schedules for the new Vande Bharat trains connecting Katra and Srinagar. Train 26401 will depart Katra at 8:10 AM and reach Srinagar at 11:08 AM, while train 26402 returns at 2:00 PM and reaches Katra at 4:48 PM. A second service, train 26404, will run from Srinagar at 8:00 AM to Katra at 10:58 AM. Its return leg, train 26403, departs Katra at 2:55 PM and arrives in Srinagar at 5:53 PM. These trains will run six days a week with one weekly off day. 10:05 (IST) Jun 06 PM Modi JK Visit Live: Kashmir gets all-weather rail connectivity With the inauguration of the Udhampur-Srinagar-Baramulla Railway Link (USBRL) project today, Kashmir now has all-weather rail connectivity with the rest of India. The 272 km route includes 36 tunnels and 943 bridges, built at a cost of Rs 43,780 crore. PM Modi will flag off two Vande Bharat Express trains during the event, marking a new chapter in regional connectivity and infrastructure development. 10:00 (IST) Jun 06 PM Modi JK Visit Live: World's highest Chenab Bridge to be inaugurated; Rs 46,000 crore projects lined up PM Modi is also expected to inaugurate the Chenab Bridge—the world's highest railway bridge—during his visit to J&K. Along with the iconic structure, infrastructure projects worth Rs 46,000 crore are likely to be unveiled. Ahead of the visit, security has been intensified across Udhampur and Reasi districts, with special focus on the Katra area. 09:59 (IST) Jun 06 PM Modi JK Visit Live: PM Modi to launch Vande Bharat trains connecting Katra to Srinagar today Prime Minister Narendra Modi is visiting Jammu and Kashmir's Reasi district today to launch two Vande Bharat Express trains between Shri Mata Vaishno Devi, Katra and Srinagar. The trains will run on the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a 272 km-long project featuring 36 tunnels and 943 bridges, built at a cost of Rs 43,780 crore. Regular operations begin from June 7, 2025. This will mark Kashmir's first-ever all-weather railway connection with the rest of India. Prime Minister Narendra Modi is visiting Jammu and Kashmir's Reasi district on Friday. During his visit, PM Modi will launch two Vande Bharat trains from Shri Mata Vaishno Devi, Katra to Srinagar. The Katra-Srinagar Vande Bharat will run on the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a 272 km long project built at a cost of around Rs 43,780 crore. The project includes 36 tunnels spanning 119 km and 943 bridges. With this inauguration, Kashmir will finally get all-weather railway connectivity with the rest of India. Indian Railways will commence regular operations of the two new Vande Bharat Express trains to Kashmir from June 7, 2025 - a day after PM Modi's inauguration of train services to Kashmir. The PM is also expected to inaugurate the Chenab Bridge, the world's highest railway bridge, along with infrastructure projects worth Rs 46,000 crore. Security has been tightened across Udhampur and Reasi districts ahead of the Prime Minister's visit, with increased inspections and vigilance, especially in Katra.