
RTA Enhances Traffic Flow Between Sheikh Zayed & Al Khail Roads via Al Meydan St
The works included widening the exit from Sheikh Zayed Road to Al Meydan Street from one lane to two and increasing the capacity of the bridge over First Al Khail Road from three to four lanes to accommodate vehicles travelling between Al Khail Road, Al Meydan Street, Sheikh Zayed Road and Al Hadiqa Street in both directions.
Additionally, RTA expanded the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, improving access for vehicles heading towards Al Khail Road and Al Meydan Street.
These enhancements reflect RTA's continued efforts to realise the vision of the wise leadership by proactively responding to the emirate's rapid urban and population growth. Through ongoing infrastructure development and road network optimisation, RTA aims to meet evolving mobility needs and support future expansion.
This achievement is part of RTA's master plan to deliver more than 75 traffic improvement projects across key areas of Dubai in 2025. It aligns with RTA's strategy for sustainable development aimed at improving quality of life, enhancing community well-being, and further cementing Dubai's position as a global leader in integrated infrastructure and seamless, sustainable mobility.
The project also included widening the Exit No. (D69) from one lane to two for vehicles travelling from Sheikh Zayed Road towards Al Khail Road and Al Meydan Street. This expansion effectively doubled the exit's capacity from 1,500 to 3,000 vehicles per hour. As a result, travel times during peak morning and evening periods were reduced by up to 40%, while vehicle queue lengths decreased by as much as 50%.
As part of broader efforts to enhance traffic flow and improve the efficiency of Dubai's Road network, RTA also increased the capacity of the bridge over First Al Khail Street from three to four lanes in both directions. The upgrade benefits vehicles travelling between Al Khail Road, Sheikh Zayed Road, and Al Hadiqa Street.
This enhancement raised the bridge's capacity by over 33%, from 4,500 to 6,000 vehicles per hour, and reduced peak-hour crossing times from seven minutes to four, an improvement of approximately 40%.
Furthermore, RTA widened the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, which improved traffic flow by reducing congestion and waiting times by more than 50%, particularly during midday and evening peak hours. The enhancement played a key role in facilitating smoother vehicle movement between Sheikh Zayed Road and Al Khail Road in both directions.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The National
5 hours ago
- The National
Ferrari reveals sublime Amalfi grand tourer to succeed the Roma coupe
Ferrari has revealed a stunningly proportioned grand tourer – the Amalfi – conceived to succeed the Roma coupe that debuted in 2020. Although it's an extensive revamp, rather than an all-new car, enough has changed to warrant the switch to the Amalfi moniker, which is inspired by the breathtaking 50km stretch of coastline in south-western Italy along the Sorrentine Peninsula. The new entrant is due on sale in the UAE in the first half of 2026 and, although official pricing is yet to be announced, it is expect it to be about Dh1m. That represents a slight increase on the Dh955,000 start price for the superseded Roma coupe. The key ingredients of the Amalfi are as per the Roma, but Ferrari has focused on honing all elements of its dynamics. The power-train, chassis control systems, steering and braking are all upgraded to yield a package that, according to the company, provides a significantly broader spread between relaxed touring capability and hard-edged performance. However, more noteworthy is the fact that the main suboptimal elements of the Roma have been successfully remedied – namely that unappealing perforated grille, plus the hit-and-miss haptic controls on the steering wheel, now replaced by physical buttons, plus the return of an aluminium start button. With not a single body panel carried over from the Roma, the Amalfi shares a marked family resemblance with the 12Cilindri, sporting slit-like headlights that peer out from within a dark recessed band positioned below a visor-mimicking panel at the front. A similar stylistic treatment is used at the rear, with the taillights hidden within what Ferrari refers to as 'graphical cuts'. An active rear spoiler with three positions – Low Drag, Medium Downforce and High Downforce – is neatly integrated into the rump, and in its most aggressive setting it generates 110kg of downforce over the rear axle at 250kph. The wing remains in Low Drag or Medium Downforce mode on straights, with the High Downforce setting only being triggered under hard braking or when cornering at speed. Ferrari says it has worked extensively on the Amalfi's aero, and even the underfloor has been optimised for smooth airflow. There is also a hidden duct above each headlight that helps lower under-bonnet temperatures as well as reducing pressure build-up. There's a great visual purity to the Amalfi and it's hard to find a bad angle on the car. The curvaceous coupe's surfacing is minimalistic, with little to distract from its smooth voluptuous contours. The Amalfi retains the Roma's 3.9-litre twin-turbo V8, but it features lightweight new camshafts (they save 1.3kg) and even the engine block has been redesigned (saving another 1kg). Peak power has been bumped up to 640hp (620hp for the Roma), although torque remains unchanged at 760Nm. The Amalfi sprints from 0-100kph in a claimed 3.3 sec (0.1 sec faster than the Roma), while 0-200kph is dispatched in 9.0 sec (0.3 sec quicker than the Roma). Although the raw numbers aren't dramatically changed, Ferrari's chief product development officer, Gianmaria Fulgenzi, says the perception from behind the wheel is of a car with much sharper responses, thanks to the V8's lower reciprocating masses and revised turbocharger set-up with its low-inertia turbines. In addition, enhancements to braking, steering and chassis-control systems has enabled a greater dynamic spread between the Wet and Comfort drive modes to the more aggressive Sport, Race and ESC Off settings. Fulgenzi emphasises that the Amalfi still comes across as a thoroughly safe and non-intimidating car, as its target audience is generally not seeking the hardcore driving experience that the 296 and SF90 serve up. The Amalfi also represents a notable step forward in cabin comfort and aesthetics vis-a-vis the Roma. There's again a pronounced dual-cockpit layout whereby the driver and passenger are each ensconced within their own domain, but a lower-set centre console creates the perception of more cabin space. Facing the driver is a 'monolithic' instrument cluster that houses a 15.6-inch digital display panel with all key information able to be easily taken in at a glance. A horizontal 10.25-inch infotainment screen in the centre replaces the old portrait screen, while passengers get their own 8.8-inch screen that displays parameters such as g-forces and engine revs.


Arabian Business
7 hours ago
- Arabian Business
RTA completes major Dubai road upgrades to slash traffic by 40% between Sheikh Zayed Road and Al Khail Road
Dubai's Roads and Transport Authority (RTA) has completed a series of rapid traffic improvement works to significantly enhance mobility between Sheikh Zayed Road and Al Khail Road via Al Meydan Street. The enhancements, which include multiple lane expansions and increased bridge capacity, are part of more than 75 planned traffic improvement projects aimed at supporting Dubai's rapid urban and population growth. Key improvements included widening the exit from Sheikh Zayed Road to Al Meydan Street from one lane to two and increasing the bridge capacity over First Al Khail Road from three to four lanes. Dubai road upgrades This upgrade benefits vehicles travelling between Al Khail Road, Al Meydan Street, Sheikh Zayed Road, and Al Hadiqa Street in both directions. The Exit No. (D69) from Sheikh Zayed Road towards Al Khail Road and Al Meydan Street was also expanded from one lane to two, doubling its capacity from 1,500 to 3,000 vehicles per hour. As a result, RTA reports a 40 per cent reduction in travel time during peak hours and a 50 per cent decrease in queue lengths. In addition, the bridge over First Al Khail Road now accommodates 6,000 vehicles per hour, up from 4,500 — a 33 per cent increase. This has reduced peak-hour crossing times from seven minutes to four, improving traffic flow by approximately 40 per cent. RTA also widened the connecting ramps between the surface road and the bridge from one lane to two, easing congestion and cutting waiting times by more than 50 per cent, especially during midday and evening rush hours. These enhancements form part of RTA's broader sustainability and mobility strategy aimed at improving quality of life, supporting economic growth, and positioning Dubai as a global leader in seamless, future-ready infrastructure. Dubai RTA Road Upgrade Summary Improvement Details Project area Sheikh Zayed Road – Al Khail Road via Al Meydan Street Exit expansion Exit No. D69 widened from 1 lane to 2 lanes Exit capacity Increased from 1,500 to 3,000 vehicles/hour Travel time (Exit D69) Reduced by up to 40% during peak times Queue length Decreased by up to 50% Bridge upgrade First Al Khail Road bridge widened from 3 to 4 lanes Bridge capacity Increased from 4,500 to 6,000 vehicles/hour (33% rise) Bridge travel time Reduced from 7 minutes to 4 minutes (≈40% reduction) Ramp expansion Surface road ramps to bridge widened from 1 to 2 lanes Congestion impact Waiting times cut by over 50% during peak hours


Zawya
11 hours ago
- Zawya
RTA Enhances Traffic Flow Between Sheikh Zayed & Al Khail Roads via Al Meydan St
Dubai's Roads and Transport Authority (RTA) has completed a series of rapid traffic improvement measures to enhance connectivity between Sheikh Zayed Road and Al Khail Road via Al Meydan Street. The works included widening the exit from Sheikh Zayed Road to Al Meydan Street from one lane to two and increasing the capacity of the bridge over First Al Khail Road from three to four lanes to accommodate vehicles travelling between Al Khail Road, Al Meydan Street, Sheikh Zayed Road and Al Hadiqa Street in both directions. Additionally, RTA expanded the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, improving access for vehicles heading towards Al Khail Road and Al Meydan Street. These enhancements reflect RTA's continued efforts to realise the vision of the wise leadership by proactively responding to the emirate's rapid urban and population growth. Through ongoing infrastructure development and road network optimisation, RTA aims to meet evolving mobility needs and support future expansion. This achievement is part of RTA's master plan to deliver more than 75 traffic improvement projects across key areas of Dubai in 2025. It aligns with RTA's strategy for sustainable development aimed at improving quality of life, enhancing community well-being, and further cementing Dubai's position as a global leader in integrated infrastructure and seamless, sustainable mobility. The project also included widening the Exit No. (D69) from one lane to two for vehicles travelling from Sheikh Zayed Road towards Al Khail Road and Al Meydan Street. This expansion effectively doubled the exit's capacity from 1,500 to 3,000 vehicles per hour. As a result, travel times during peak morning and evening periods were reduced by up to 40%, while vehicle queue lengths decreased by as much as 50%. As part of broader efforts to enhance traffic flow and improve the efficiency of Dubai's Road network, RTA also increased the capacity of the bridge over First Al Khail Street from three to four lanes in both directions. The upgrade benefits vehicles travelling between Al Khail Road, Sheikh Zayed Road, and Al Hadiqa Street. This enhancement raised the bridge's capacity by over 33%, from 4,500 to 6,000 vehicles per hour, and reduced peak-hour crossing times from seven minutes to four, an improvement of approximately 40%. Furthermore, RTA widened the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, which improved traffic flow by reducing congestion and waiting times by more than 50%, particularly during midday and evening peak hours. The enhancement played a key role in facilitating smoother vehicle movement between Sheikh Zayed Road and Al Khail Road in both directions.