logo
60 daily flights from Navi Mum by mid-Oct: Adani Airport head

60 daily flights from Navi Mum by mid-Oct: Adani Airport head

Time of India18-07-2025
Ahmedabad: Navi Mumbai International Airport (NMIA) is likely to be inaugurated around Sep 30, and within a fortnight operations will start with 60 daily flights, reaching up to 300 in six months,
Adani Group
director (airports) Jeet Adani told TOI exclusively on Friday.
He said the demolition of T1 at Mumbai (CSMIA) will be completed in 2029-30 once NMIA gets its second terminal, reports Saurabh Sinha.
The new T1 at CSMIA will be ready by 2032. Work has started on NMIA T2 and construction will begin in 6-12 months of the new airport getting operational. He said the Adani Group has asked the Airports Economic Regulatory Authority to consider CSMIA and NMIA as one airport with common charges.
When general aviation flights are shifted to Navi Mumbai next year, charters and business jets will continue to fly into CSMIA but will not be allowed to park.
The much-awaited Navi Mumbai International Airport (NMIA) will see both domestic and international flights this Oct, a week to 15 days after inauguration on or around Sep 30. Starting with 60 daily flights (30 arrivals and as many departures) in the first month, the number will double after 30 days and then reach the 240-300 mark in six months.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
2025 Hyundai Palisade: Bold Redesign Unveiled!
New Hyundai 2025
Learn More
Undo
In its first phase, with a capacity of 2 crore passengers annually (CPA), the greenfield airport will handle 400 daily flights within a year, Adani Group director (airports) Jeet Adani told TOI on Friday in an exclusive interaction.
"We aim to have both domestic and international operations at NMIA from day one. If that does not happen for some reason, both will start for sure within the same month (Oct). The ratio of domestic and international flights will be 4:1 as T1 domestic capacity is 1.7 CPA and int'l is 30 LPA (lakh per annum).
We have the flexibility to increase international passengers, based on demand," Adani said.
You Can Also Check:
Mumbai AQI
|
Weather in Mumbai
|
Bank Holidays in Mumbai
|
Public Holidays in Mumbai
While in its initial days connectivity may be an issue, eventually NMIA will be well-connected with a network of roads, rail, metro, air taxis and water connectivity. An aerocity is being developed that will, among other things, have hotels in all ranges from budget to luxury.
"We have kept a digital first mindset at NMIA T1 with every service going to be digitally enabled from day one and the airport will be managed in a smart manner.
From a consumer point of view, we will be able to give all the information in real time. Logging on to Adani One app, passengers will be able to know that their check-in bag is now on belt number so & so and we plan to do it from the day the airport gets operational. There will be no need to congregate at the belt and keep looking for one's check-in bag/s," Adani said.
The digital footprint aims to change flyer "anxiety to excitement".
"What are the biggest flyer concerns? 'Will I miss my flight? How long are the queues at various touchpoints? I forgot to pick up something for loved ones!' Scanning the boarding card will give all info on the app. So if you're able to give them information that 'relax, your walking time to gate is exactly so many minutes or that boarding hasn't started or your aircraft hasn't even landed yet, they will be able to comfortably explore the airport'," he said.
Running both Mumbai's Chhatrapati Shivaji Maharaj International Airport (CSMIA) and NMIA, the group has identified catchment areas for both. For people in the northern suburbs of Mumbai like Borivli, Kandivli and Virar, NMIA will be a long way off and they will continue to opt for CSMIA. "The eastern Mumbai catchment area all the way to Pune will find NMIA perfect for them as they won't have to enter the city. South Mumbai will be equidistant from both airports," Adani said.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Left parties to protest against power tariff hike on Aug 5
Left parties to protest against power tariff hike on Aug 5

Hans India

time4 hours ago

  • Hans India

Left parties to protest against power tariff hike on Aug 5

Vijayawada: The Communist Party of India (CPI) announced on Monday that the Left parties will organise statewide protests on August 5 to oppose the recent hike in electricity charges and the installation of smart meters across Andhra Pradesh. The demonstrations will be held under the banner of a united front of Left parties and civil society organisations, taking place in front of electricity offices in all 26 districts. The agitation also aims at demanding the cancellation of power purchase agreements signed with the Adani Group by the Andhra Pradesh government. During a virtual meeting with state and district-level leaders today, CPI State Secretary K. Ramakrishna called upon party cadres and affiliated organizations to mobilize on a large scale to ensure the protest serves as a powerful expression of public anger. 'This is not just a protest—it is a fight to protect the common people from unjust tariffs and corporate favoritism,' he asserted. The Zoom meeting, chaired by P. Harinath Reddy, was attended by senior CPI leaders including Muppalla Nageswara Rao (Assistant State Secretary), former MLC Jalli Wilson, Akkineni Vanaja, G. Eshwaraiah, P. Manohar Naidu, N. Lenin Babu, and G. Koteshwara Rao, among others. Ramakrishna stated that the protests will demand the government immediately roll back electricity tariff hikes, cancel smart meter installations, and terminate the Adani-linked power agreements, which were originally signed under the YSRCP government. Ramakrishna further pointed out that none of the NDA alliance partners—TDP, BJP, or Jana Sena—have spoken out against the tariff hikes. He criticised both the previous YSRCP and the current TDP governments for allegedly favoring corporate entities like Adani and the Lulu Group at the cost of public welfare. He also highlighted the reported failures of Lulu malls in countries like Singapore and Malaysia, questioning the rationale behind leasing valuable RTC land in Vijayawada to Lulu for 99 years.

South Delhi May Soon Get 4 New Elevated Roads, Will It Finally End Traffic Chaos?
South Delhi May Soon Get 4 New Elevated Roads, Will It Finally End Traffic Chaos?

News18

time5 hours ago

  • News18

South Delhi May Soon Get 4 New Elevated Roads, Will It Finally End Traffic Chaos?

Last Updated: A 2km elevated road connecting Chhatarpur's 100-Foot Road to IGNOU will help divert traffic heading to Gurgaon and Qutub Minar, easing pressure on Qutub and Saket Metro junctions. The Delhi Government has unveiled a plan to tackle South Delhi's traffic jams. Having said that, four new elevated roads are in the pipeline to connect key localities and reduce daily chaos on roads like IGNOU Road and Chhatarpur's 100-Foot Road. The proposed roads include: The Public Works Department (PWD) has been asked to begin feasibility studies for each stretch, as per TOI. Why Is This Needed? Several areas in South Delhi like Freedom Fighters Enclave, Sainik Farm, Neb Sarai, and Paryavaran Complex suffer from daily traffic chaos. Ignou Road, which connects these colonies to the Saket Metro, is especially packed. Shop encroachments and narrow roads have left no room for expansion. PWD had earlier tried using concrete dividers to organise traffic, but the jams persisted. Now, officials are pushing for a long-term fix through elevated roads. What Are the Problem Areas? Ignou Road is a lifeline that connects residential colonies like Neb Sarai, Paryavaran Complex, and Saidulajab to Saket Metro. But hawkers and shops encroaching on the road have left little space for vehicles. With no alternative routes, traffic here often comes to a standstill. Another major pain point is the stretch from Chhatarpur to Ignou, where commuters currently need to pass through Qutub Minar and Saket Metro. A proposed 2-km elevated road could finally bring relief. What's Next? A larger proposal is being explored to connect Anuvrat Marg to IGI Airport via INA Market. Though still in its early stages, the project could change airport connectivity for lakhs. However, challenges like the nearby Metro line and ramp placements remain. Officials are conducting site visits and involving stakeholders to assess what's possible. Final decisions will follow detailed feasibility reports. view comments First Published: July 29, 2025, 09:14 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

TCS's 12,000 job cuts spark fears of larger IT layoffs
TCS's 12,000 job cuts spark fears of larger IT layoffs

Time of India

time6 hours ago

  • Time of India

TCS's 12,000 job cuts spark fears of larger IT layoffs

Representative image BENGALURU: TCS laying off over 12,000 mid- and senior-level employees has sent shockwaves across the tech industry. This move not just challenges the perception of TCS as a company known for job security and stability, but shows that India's IT sector is in the early stages of a significant reset. The industry is undergoing a structural shift, mirroring global trends where major tech firms are streamlining resources, improving cost efficiency, reallocating assets, and shutting down divisions that no longer align with strategic priorities. Margin Pressures: Industry experts attribute this transformation to mounting margin pressures, prompting companies to control costs by reducing headcount. Many believe that AI is disrupting the traditional workforce pyramid, replacing broad-based hiring models with leaner, more specialised structures which yield higher billing. As a result, the future of services will rely heavily on a blend of newer tech and human ingenuity, where billability is determined by the premium clients are willing to pay for niche skills rather than volume of resources. Bench Policy: TCS has said its restructuring efforts are aimed at making the company future-ready. As part of this initiative, sources told TOI the company has begun focusing on employees who have remained unbilled - commonly referred to as being on the "bench" - for extended periods, typically ranging from 3 to 18 months. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Is it better to shower in the morning or at night? Here's what a microbiologist says CNA Read More Undo These individuals, many of whom have between 3 and 10 years of experience with the firm, are being either relocated or let go. This has sparked concerns within the industry over the potential for a wave of sudden and unexpected exits. Sudden Exits: Several employees who spoke to TOI on condition of anonymity said those impacted had been on the bench for anywhere between 3 and 18 months. In one case, an employee claimed she was called into a meeting where three HR representatives handed her a "discharge letter" and asked her to resign. "It was sudden and shocking. There was no prior intimation," she said. TCS, however, maintains that it has consistently offered relocation and retraining options to benched employees to enhance their chances of being deployed on projects. Meanwhile, lateral hires awaiting onboarding have reported uncertainty. In response to one such candidate, a TCS HR executive reportedly said, "Do not wait for TCS. New announcements are going on. We are helpless," suggesting that onboarding timelines are unclear amid ongoing changes. Campus Chaos: Indian campuses are facing a stark dichotomy - freshers without job offers on one side, and large salary packages on the other. The recent layoffs at TCS have sounded an alarm across the industry. Global capability centres (GCCs) continue to lead recruitment efforts as Indian IT companies adapt to a major transformation in the tech as upskilling becomes part of everyday work life, lower net additions are making engineering graduates anxious. Indian campuses today present a stark contrast: while some students receive lucrative offers, many others are left without any. For computer science students, the future is deeply intertwined with AI, offering exciting opportunities but also demanding rapid adaptation. Ramkumar Ramamoorthy, partner at tech growth advisory firm Catalincs, said, "In the context of digital and AI, there is a crying need for India to reimagine its higher education to stay relevant. Beyond STEM programmes, we must integrate AI across disciplines - liberal arts, law, medicine, management, and social sciences. The only way to do this at scale is through collaboration with experts and practitioners. Otherwise, we risk producing graduates who are misaligned with market needs, potentially leading to serious social implications. " Stay informed with the latest business news, updates on bank holidays and public holidays . AI Masterclass for Students. Upskill Young Ones Today!– Join Now

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store